2019/2020 FINANCIAL YEAR PROJECTS

- Completed Projects-
Go back

Project Objective Department Status Budget(Kshs) Ward
Kapsaos Dispensary To enhance the functionality and efficiency of healthcare service delivery at Kapsaos Dispensary by renovating the Outpatient Department (OPD) and installing proper shelving in the pharmacy room for improved drug storage and management Health Services Completed 2,842,893.20 Kapsaos Feedback
Binyiny Dispensary To improve healthcare service delivery and security at Binyiny Dispensary by completing OPD works, fitting pharmacy shelves, constructing sanitation facilities, and fencing the compound. Health Services Completed 1,892,785.92 Kapsaos Feedback
Maso Dispensary To enhance water availability for clinical use and sanitation through installation of a rainwater harvesting system. Health Services Completed 1,544,366.00 Kapsaos Feedback
Kapsaos Disp To ensure consistent water supply for healthcare operations by installing a rainwater harvesting system. Health Services Completed 1,832,918.24 Kapsaos Feedback
Manyoror Dispensary To improve sanitation and ensure reliable water supply at Manyoror Dispensary through construction of sanitation and water facilities. Health Services Completed 1,512,176.00 Kapsaos Feedback
Kapkatet Sub- County Hospital To improve hospital utility systems. Health Services Completed 1,664,072.20 Kapkatet Feedback
Kapkatet Hospital NBU To improve the functionality and privacy of the NBU unit. Health Services Completed 1,187,104.10 Kapkatet Feedback
kapkatet sub-county Hospital To enhance oxygen supply for critical units. Health Services Completed 1,150,213.31 Kapkatet Feedback
kapkatet sub-county Hospital To improve safety and aesthetics. Health Services Completed 1,074,606.60 Kapkatet Feedback
Kapkatet Hospital To increase hospital water storage capacity. Health Services Completed 1,584,928.90 Kapkatet Feedback
Sosit Dispensary. To expand outpatient services. Health Services Completed 1,242,384.36 Kapkatet Feedback
Roret Hospital power supply To enhance electrical reliability. Health Services Completed 1,482,484.64 Kisiara Feedback
Mosore Dispensary To operationalize the facility. Health Services Completed 1,523,834.00 Kisiara Feedback
Tulwet Dispensary To improve diagnostic capacity. Health Services Completed 1,746,226.88 Kisiara Feedback
Mabasi Dispensary To operationalize the facility. Health Services Completed 1,485,672.32 Kisiara Feedback
Kaproret Dispensary. To operationalize the dispensary. Health Services Completed 1,268,049.36 Kisiara Feedback
Roret hospital To improve staff and patient catering services. Health Services Completed 1,241,680.24 Kisiara Feedback
Roret sub-county hospital To expand surgical service capacity. Health Services Completed 1,225,699.62 Kisiara Feedback
Kaproret Dispensary To improve outpatient service delivery by completing the OPD, enhancing drainage, and expanding the pharmacy room Health Services Completed 1,087,616.00 Kisiara Feedback
Mosore Dispensary To enhance sanitation and waste management infrastructure for improved public health standards. Health Services Completed 2,859,120.00 Kisiara Feedback
Mabasi Dispensary To improve sanitation and hygiene for patients and staff. Health Services Completed 2,016,623.00 Kisiara Feedback
Litein Dispensary To rehabilitate and upgrade existing health infrastructure for better service delivery Health Services Completed N/A Litein Feedback
Kalaacha Dispensary To operationalize the dispensary and enhance access to primary healthcare services Health Services Completed 2,682,394.00 Litein Feedback
Rungut Dispensary To expand healthcare access through the establishment of a new dispensary. Health Services Completed 2,162,737.00 Litein Feedback
Litein Health Centre To improve patient care and water access through OPD renovation and installation of a water tank base. Health Services Completed 2,570,898.00 Litein Feedback
Kaboeito Dispensary To enhance healthcare access by establishing a new dispensary. Health Services Completed 1,845,950.00 Tebesonik Feedback
Kaboeito Dispensary To improve staff welfare and sanitation within the health facility Health Services Completed 3,506,065.00 Tebesonik Feedback
Kericho Forest Dispensary To restore and improve existing infrastructure for quality service delivery Health Services Completed 1,988,890.00 Chepseon Feedback
Kamachungwa Dispensary To finalize construction for operational readiness of the dispensary. Health Services Completed 2,014,036.00 Chepseon Feedback
Kiletien Dispensary To operationalize the facility by completing outstanding construction works. Health Services Completed 2,680,560.00 Chepseon Feedback
Kiletien Dispensary To improve patient flow and service efficiency through OPD completion Health Services Completed 3,242,411.00 Chepseon Feedback
Chepcholiet Dispensary phase 2 To complete the remaining construction works for full utilization of the dispensary Health Services Completed 1,271,443.00 Chepseon Feedback
Proposed Construction of toilets and Final Paint Works at Kiletien Dispensary To improve sanitation and aesthetics through toilet construction and painting. Health Services Completed 1,296,274.00 Chepseon Feedback
Proposed Completion of OPD at Kamachungwa Dispensary To improve service delivery through completion of the outpatient unit Health Services Completed 2,003,440.00 Chepseon Feedback
Proposed completion of OPD, construction of two door pit latrine and installation of 10, 000L water tank at Chepcholiet Dispensary To enhance service delivery and sanitation by completing OPD, pit latrine, and water storage system. Health Services Completed 3,904,800.00 Chepseon Feedback
Proposed completion of maternity room at Momoniot Dispensary To improve maternal healthcare by completing and equipping the maternity room Health Services Completed 2,700,200.00 Chepseon Feedback
Proposed completion of OPD, extension of a verandah and waiting bay, supply and installation of 5000 liters water tank at 938Dispensary To enhance patient comfort and water supply by extending waiting bay and installing water tank Health Services Completed 138,400.00 Chepseon Feedback
Ainamoi Water Project Lot 1 To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,796,770.40 Ainamoi Feedback
Ainamoi Water Project Lot 2 To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,686,292.00 Ainamoi Feedback
Kaborus water project To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 3,445,258.00 Ainamoi Feedback
Kimigik Water project To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,529,919.82 Ainamoi Feedback
Senetwet/Ketipyese water project. To strengthen water supply infrastructure by providing durable pipes and fittings for construction, rehabilitation, and extension of distribution networks. Water, Environment, Energy and Natural Resources Completed 1,110,013.28 Ainamoi Feedback
Seretut Borehole Water Project(Equipping) To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 1,343,653.60 Waldai Feedback
Sosiot Pipeline Extension To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 2,025,295.04 Waldai Feedback
Sosiot Pipeline Maintenance and Rehabilitation To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,221,255.00 Waldai Feedback
Sosiot Pipeline Extension To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,059,671.60 Waldai Feedback
Sosiot Pump repair To provide a reliable and efficient Horizontal Multistage Centrifugal Pump capable of meeting the site’s water supply or dewatering needs. Water, Environment, Energy and Natural Resources Completed 1,155,637.24 Waldai Feedback
Litein Water Supply To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 1,155,513.12 Soliat Feedback
Chepkosa Spring rehabilitation To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 947,789.20 Soliat Feedback
Ngororga Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 920,250.21 Soliat Feedback
Tiroto, Lelach and Birirbei springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,200,101.20 Soliat Feedback
Ainap Kirgit Water Project to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, Water, Environment, Energy and Natural Resources Completed 1,225,699.62 Soliat Feedback
Proposed Kipkobob Water Project Secure and Efficient Water Intake and Storage,Optimize Water Distribution,Modernize and Protect Infrastructure Water, Environment, Energy and Natural Resources Completed 1,376,978.00 Chemosot Feedback
Chelelachbei Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 2,014,862.00 Chemosot Feedback
Chepkutut ndisiot Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,330,400.00 Chemosot Feedback
Kabitungu/ Kapkalia Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,058,455.92 Chemosot Feedback
Kaptangut Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,832,829.98 Chemosot Feedback
Mosombet Springs To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,138,598.00 Chemosot Feedback
Arokyet Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,571,834.80 Cheplanget Feedback
Kaminjeiwa Borehole Water Project to supply, deliver, install, test, and commission a submersible pump set to enhance water extraction and distribution from the designated water source Water, Environment, Energy and Natural Resources Completed 3,179,333.44 Cheplanget Feedback
Litein Water Supply To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,348,680.00 Cheplanget Feedback
Kaminjeiywa Borehole –Tegat To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 2,119,039.00 Cheplanget Feedback
Kaminjeiywa- Mobwo Borehole Water Project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,796,770.40 Cheplanget Feedback
Kipsonoi/Cheplanget Water Project To enhance water supply reliability, storage efficiency, and infrastructure security through the construction and electrification of a control panel house, rehabilitation of a 100 m3 water tank, installation of a rising main, and fencing of critical installations Water, Environment, Energy and Natural Resources Completed 1,589,077.04 Cheplanget Feedback
Kapkatet springs and Litein water supply to enhance water storage capacity, improve distribution efficiency, and increase community access to clean water, Water, Environment, Energy and Natural Resources Completed 1,408,258.56 Kapkatet Feedback
Litein water supply To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,853,100.00 Kapkatet Feedback
Kapkatet (Segerwer) Hospital Water Project To enhance access to clean and sustainable water supply by constructing and installing water kiosk, 200m3 water tanks, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,273,146.40 Kapkatet Feedback
Segerwer extension pipeline To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,189,694.00 Kapkatet Feedback
Chebirirbei water project To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,133,426.72 Kisiara Feedback
Koituk Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 2,291,348.00 Kisiara Feedback
Koituk Primary School Borehole To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 1,603,824.68 Kisiara Feedback
Roret Pineapple Processing Plant To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,316,850.56 Kisiara Feedback
Koituk Primary School Borehole Water Project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,479,754.14 Kisiara Feedback
Tulwet Borehole water Project To equip an existing borehole with all necessary components to enable a sustainable and efficient water supply system. Water, Environment, Energy and Natural Resources Completed 1,153,282.90 Kisiara Feedback
Chebwagan-Kalacha Dispensary Water Project To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,501,622.78 Kisiara Feedback
Litein Water Supply To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,561,202.00 Kisiara Feedback
Sachangwan Cheribo Line Extension To enhance access to clean and sustainable water supply by constructing and installing water infrastructure such as pipelines, water tanks, spring protection systems, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,956,125.31 Kisiara Feedback
Chemitan Water Project To establish a sustainable and efficient water supply system that secures natural water sources, enhances storage capacity, and improves community access through effective distribution. Water, Environment, Energy and Natural Resources Completed 1,427,681.60 Kisiara Feedback
Chemitan Solarisation To establish a sustainable and efficient water supply system that secures natural water sources, and improves community access through effective distribution. Water, Environment, Energy and Natural Resources Completed 1,259,540.76 Kisiara Feedback
Cheptenybei Spring Protection To improve access to safe and sustainable drinking water for the community by protecting natural springs and establishing reliable water points. Water, Environment, Energy and Natural Resources Completed 1,379,003.36 Kisiara Feedback
Kapkisiara Borehole Water Project To restore or enhance water pumping capacity for reliable water delivery through the supply and installation of a new pumpset. Water, Environment, Energy and Natural Resources Completed 1,231,889.00 Tebesonik Feedback
Kapkisiara Water Project To enhance access to safe, reliable, and sustainable water supply through improved storage, infrastructure rehabilitation, and expanded distribution. Water, Environment, Energy and Natural Resources Completed 1,102,400.20 Tebesonik Feedback
Kapkisiara Water Project To enhance access to clean and sustainable water supply by constructing pipelines, water tanks, and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,346,017.60 Tebesonik Feedback
Kibugat Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 2,200,056.00 Tebesonik Feedback
Kibugat borehole Water Project To equip a borehole, extend power supply, and develop key water infrastructure that supports reliable water extraction, storage, and distribution for the community. Water, Environment, Energy and Natural Resources Completed 1,662,032.22 Tebesonik Feedback
Kiptome Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,139,510.92 Tebesonik Feedback
Kaptaragon Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,613,832.88 Chepseon Feedback
Chepseon Polytechnic Borehole To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 1,624,649.60 Chepseon Feedback
Kaplelachbei water project Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution Water, Environment, Energy and Natural Resources Completed 1,494,486.00 Chepseon Feedback
Chilchilla Pan Rehabilitation Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution Water, Environment, Energy and Natural Resources Completed 1,386,788.17 Chepseon Feedback
Chepsain Water Project Increase Water Storage Capacity, Enhance Water Intake Efficiency, ,Enhance Security and Reduce Contamination Water, Environment, Energy and Natural Resources Completed 1,893,521.36 Chepseon Feedback
Chepseon Water projects (Tugunon Water project) To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,138,236.54 Chepseon Feedback
Londiani water supply To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,375,551.20 Kedowa/Kimugul Feedback
Rehabilitation of Tulwapsigis Pan Increase Water Storage Capacity, Enhance Water Intake Efficiency, Improve Water Distribution Water, Environment, Energy and Natural Resources Completed 1,725,152.00 Kedowa/Kimugul Feedback
Kapkeri Water Project To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community Water, Environment, Energy and Natural Resources Completed 1,129,751.40 Kedowa/Kimugul Feedback
Katet Borehole Water project To provide sustainable and reliable water access through the drilling and equipping of a borehole, supported by power infrastructure and secure water storage Water, Environment, Energy and Natural Resources Completed 1,453,619.20 Londiani Feedback
Kiptangit Water project Phase 1 To restore efficient water transmission from the source (e.g., borehole, treatment plant) to the storage facility or distribution network, minimizing losses and ensuring reliable water supply. Water, Environment, Energy and Natural Resources Completed 1,009,391.08 Londiani Feedback
Kiptangit Water Project Phase II to enhance water supply reliability and accessibility through the completion of the Rising Main Rehabilitation, Pipeline Extension, Establishment of Communal Water Points, and Installation of Water Meters Water, Environment, Energy and Natural Resources Completed 1,141,788.00 Londiani Feedback
Masaita Borehole Water Projects To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 871,160.00 Londiani Feedback
Barotion Water Project To provide communities with improved access to clean and safe water through the extension of the water distribution network. Water, Environment, Energy and Natural Resources Completed 1,559,712.80 Londiani Feedback
Kamwingi II Water Project To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. Water, Environment, Energy and Natural Resources Completed 2,621,429.48 Tendeno/Sorget Feedback
Benditai Water Project. To increase water collection, storage capacity, and distribution efficiency through the Expansion of Intake Works, Construction of a 100m Masonry Storage Tank, and Extension of the Distribution Pipeline. Water, Environment, Energy and Natural Resources Completed 2,613,029.92 Tendeno/Sorget Feedback
Kivuno Borehole Water Project To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. Water, Environment, Energy and Natural Resources Completed 2,114,104.64 Tendeno/Sorget Feedback
Jagoror Water Project To secure and optimize water collection, storage, and distribution through the Spring Protection, Construction of a Distribution Pipeline, and Installation of a Masonry Water Tank. Water, Environment, Energy and Natural Resources Completed 1,618,340.32 Tendeno/Sorget Feedback
Kiploikyi water project- solar to enhance water supply reliability and accessibility through the completion of the intake weir, Pipeline Extension, Water, Environment, Energy and Natural Resources Completed 2,069,115.20 Tendeno/Sorget Feedback
Fort Tenan Health Centre Water Project To enhance water storage, purification, and distribution through the Construction of 3 No. 25 m Ground Level Masonry Tanks, a Composite Filtration Unit, and a Gravity Pipeline. Water, Environment, Energy and Natural Resources Completed 2,898,190.40 Chilchila Feedback
Ndubusat Water Project To restore and expand water supply infrastructure through the Rehabilitation of the Gravity Main, Construction of a 50 m (50,000 liters) Storage Tank at Nyairobi, and Extension of the Distribution Line. Water, Environment, Energy and Natural Resources Completed 2,800,472.00 Chilchila Feedback
Teldet Water Project To restore and enhance water transmission, storage, and distribution through the Rehabilitation of the Gravity Main, Construction of a 50 m Storage Tank, and Extension of the Distribution Line. Water, Environment, Energy and Natural Resources Completed 1,102,324.70 Chilchila Feedback
Cherara-Kaplelit-Kapkese water project To Construct Gravity Main and enhance water transmission, Water, Environment, Energy and Natural Resources Completed 1,698,000.69 Chilchila Feedback
Kipsinende Water Project to enhance water storage capacity and supply reliability through the Construction of a 100 M3 (100,000 liters) Ground Level Masonry Water Tank. Water, Environment, Energy and Natural Resources Completed 972,010.40 Chilchila Feedback
Ndubusat Water Project Phase 2 to enhance water storage capacity and supply reliability through the Construction of a 2no. 50M3 Ground Level Masonry Water Tank. Water, Environment, Energy and Natural Resources Completed 1,307,210.00 Chilchila Feedback
Leldet borehole Water Project To ensure reliable water extraction and supply through the Supply and Installation of a Borehole Pump. Water, Environment, Energy and Natural Resources Completed 1,561,202.00 Kamasian Feedback
Itibet - Bagao- Deliverance Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,505,055.00 Ainamoi Feedback
Kiburet- Factory- Yasomok Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,492,799.00 Ainamoi Feedback
Duka Moja- Saptet- Kwa Micheal Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,178,060.00 Kapkugerwet Feedback
Kericho Toyota- Lavington Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,850,000.00 Kapkugerwet Feedback
Off Binyiny -Kaboloin Signpost ROAD, Chebigen- Manyoror Dispensary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,952,415.00 Kapsaos Feedback
Sachangwan- Kamungei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,059,000.00 Kapsaos Feedback
Samutet Pry.Sch Junction-Cattle Dip- JoRoadan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,900,000.00 Kapsoit Feedback
Kaptegere- Chepsoo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,300,000.00 Kapsoit Feedback
Mortgage - Kericho Primary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,482,248.00 Kipchebor Feedback
Satelite - Matobo Primary-Nyagacho - Nursery Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,552,629.00 Kipchebor Feedback
Baraka Kipsotet-Kimeswon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,432,423.00 Kipchimchim Feedback
Taiwet - Kipsutet Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,149,630.00 Kipchimchim Feedback
Routine Maintenance of Arap Mangei- Nyaga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,410,391.00 Cheboin Feedback
Routine Maintenance of Cheptendeniet- Cheboin Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,945,687.00 Cheboin Feedback
Routine Maintenance of Koborus- Kesengit- Kipagenge-Chepkulgong- Arap Barchile Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,415,325.00 Cheboin Feedback
Routine Maintenance of Moburu- Chemunye- Ririat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,250,761.00 Cheboin Feedback
Maintenance of Kabarus junction-Chabasta River-Ngeny River Spencon- Kapchebo Pry School Road To enhance the safety, accessibility, and all-weather usability of rural roads Public Works, Roads and Transport Completed 1,879,201.00 Cheboin Feedback
Routine Maintenance of Kabarus junction-Chabasta River-Ngeny River Road To improve the condition, safety, and accessibility of an existing road Public Works, Roads and Transport Completed 1,530,306.00 Cheboin Feedback
Routine Maintenance of Kapchelogoi- Soet Pry- Kipsereti River- Ps Cheruiyot- Maria Joy- Kap Than You Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,957,183.00 Chemosot Feedback
Routine Maintenance of Ngoina Road- Pastor Weldon Chumo- Kipkerieny Pry- Chebarema Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,549,915.00 Chemosot Feedback
Routine Maintenance Off C23 - Cheborus - Kapcario - Salvation ECDC Main -Kipsisin TBC - Kapsenetwet - Sugutek TBC- Chelilis CD Getarwet To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,379,948.76 Chemosot Feedback
Routine Maintenance of Kitaiit-Kimonjuk Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,915,308.48 Cheplanget Feedback
Routine Maintenance of Kaldit TBC- Tegat UPEC/Arokyet- Tinga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,957,183.01 Cheplanget Feedback
Routine Maintenanve of Kenene Dispensary- Tiritap Moita- Chebinyiny Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,349,500.00 Cheplanget Feedback
Routine Maintenance of Bossman Road- Kap Josea Sang - Marisin -Kap Josea gate Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,852,103.00 Kapkatet Feedback
Routine Maintenance of Chemoiben- Egisiek- kapcheluch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,650,440.00 Kapkatet Feedback
Routine Maintenance of 954DC Junction- Soy Palza- 954East- MP Hom- Upper Hill Acadeny- Off C23- Morit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,474,119.00 Kapkatet Feedback
Routine Maintenance of Ngesumiin Girls- Nyambolosa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,747,264.00 Litein Feedback
Routine Maintenance of Chemitan- Chebwagan- 954Motuary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,629,374.00 Litein Feedback
Routine Maintenance of Siritiet Junction- Siritiet Pry- Chepkoit- Ainapek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,416,375.00 Tebesonik Feedback
Routine Maintenance of Kalya Junction-Chepnyogaa Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,875,237.00 Kabianga Feedback
Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,969,624.00 Kabianga Feedback
Routine Maintenance of Off Chepnyogaa-Mobengo-Kapchebet Signpost Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,052,000.00 Kabianga Feedback
Routine Maintenance of Chepkutung Banda - Maseti – Kaplangacha Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,605,577.00 Kapsuser Feedback
Routine Maintenance of Chepkutung Hills - Kipngetuny - BAE - Arap Cheruiyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,366,405.00 Kapsuser Feedback
Routine Maintenance of Kapchelibon - Kipngetuny – Kapkonyinyis Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,613,030.00 Kapsuser Feedback
Routine Maintenance of Kesagetiet TBC-Kipchombul TBC - Seretut TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,114,105.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Cheptororiet Pri-Kaldit Tbc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,823,287.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kapsoroget AGC - Cheboseron Tbc-Milimani Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,593,500.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kapsuser Slaughter-Masiat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,490,900.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kesagetiet TBC-Kipchombul TBC - Seretut TBC Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,067,582.00 Cheptororiet/Seretut Feedback
Routine Maintenance of Kabiwot - Chelalang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,776,796.00 Waldai Feedback
Routine Maintenance of Off Cheribo- Chebaibai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,045,559.00 Waldai Feedback
Routine Maintenance of Off Sondu Road - Mark Peter Pry. School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,812.00 Waldai Feedback
Rouitne Maintenance of 938- Leberer-Kamachungwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,397,635.00 Chepseon Feedback
Routine Maintenance of Kamarus – Annex Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,495,763.00 Chepseon Feedback
Routine Maintenance of Kosovo – Sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,952,891.00 Chepseon Feedback
Routine Maintenance of Kap Zakayo-Simotwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,805,412.00 Chepseon Feedback
Routine Maintenance of Off B1 -ngatumek pry, and Kapchumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,152,100.00 Kedowa/Kimugul Feedback
Routine Maintenance of Off Kedowa Pry. - Testai - Kabisoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,924,548.00 Kedowa/Kimugul Feedback
Routine Maintenance of Cherote-Lelsotet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,835,556.00 Kedowa/Kimugul Feedback
Routine Maintenance of Off B1-Kapchumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,639,906.00 Kedowa/Kimugul Feedback
Routine Maintenance of Arap Chepyoset-Job-Southrift Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,573,967.00 Londiani Feedback
A Routine Maintenance of Arap Kogo-Lolongbei Road and Jagoror Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,338,591.00 Londiani Feedback
Routine Maintenance of United Soy-Kiplangat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,033,584.00 Londiani Feedback
Routine Maintenance of Cheres-Orwasa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,930,816.00 Londiani Feedback
Routine Maintenance of OffD314 - Benjamin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Tendeno/Sorget Feedback
Routine Maintenance of Off E254-Kamuingi-Kichagi-Gwitu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,540,493.00 Tendeno/Sorget Feedback
Routine Maintenance of Cheborge Junction-Center One Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,141,488.00 Tendeno/Sorget Feedback
Routine Maintenance of Kapilot -Sorget Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,929,766.00 Tendeno/Sorget Feedback
Routine Maintenance of Kokwet-Kapsinendet-Cherara To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,413,483.00 Chilchila Feedback
Routine Maintenance of Sachangwan-Kipgeigei-Kapchorwa To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,859,120.00 Chilchila Feedback
Routine Maintenance of Off-C35-Ngomwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,016,622.88 Kamasian Feedback
Routine Maintenance of Kapkures-Kamtego Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,648,573.68 Kamasian Feedback
Routine Maintenance of 390-Simotwet-Kipsirichet-Kerembe -KapedWard Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,470,527.36 Kipkelion Feedback
Routine Maintenance of Eng. Fred - Soi Mingin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,649,630.16 Kipkelion Feedback
Routine Maintenance of Kabias Junction-Kapkoros Pry.-Sugut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,048,890.22 Kunyak Feedback
Routine Maintenance of Sireret-Kotetnik-Kabias Junction Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,767,147.28 Kunyak Feedback
Kapchebwai-Koiyabei- Sideways Shop- Koitaburot Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,257,885.22 Soin Feedback
Ngomwet- Kap Mursoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,226,637.72 Soin Feedback
Kenya One - Kabokyek Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,200,000.00 Soliat Feedback
Soliat Corner - Kaplengeny - Kiptugumo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,992,503.00 Soliat Feedback
Konasita - Cheboptaa - Kona Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,075,880.00 Sigowet Feedback
Kaitui - Kipkecheiyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,710,905.16 Soliat Feedback
Site Clearance, Desilting of Existing Culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,798,658.32 Sigowet Feedback
Kapchemirmir TBC-Kimalal Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,680,560.48 Sigowet Feedback
Kapsomboch-Kapkilel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,242,411.12 Kaplelartet Feedback
Tililbei cattle dip-Toror Academy-Kap Aron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,561,543.28 Kaplelartet Feedback
RC431-MI27B Cheptagum Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,051,453.96 Kaplelartet Feedback
Construction of Chemorin-Kapkwen Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,795,228.68 Ainamoi Feedback
Construction of Kaptongilo Cheplil-Metro Road Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,082,913.36 Ainamoi Feedback
Construction of Kiptegan-Kapsaos Market Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,500,488.61 Kapsaos Feedback
Construction of Sebetet-Sirimdo Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 3,478,384.87 Kipchimchim Feedback
Construction of Torsogek Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,749,578.06 Kapsoit Feedback
Construction Of Jordan Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,551,079.44 Kapsoit Feedback
Construction of Kapsogut Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,266,466.50 Cheboin Feedback
Construction of Chemosot-Ainaptibik box culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,360,872.00 Chemosot Feedback
Construction of Chesingoro-Lalagin (Chepkochun) Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,569,599.00 Chemosot Feedback
Construction of Tamboyot box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,541,517.00 Cheplanget Feedback
Construction of Koitabai-Mabwaita Pipe Culverts To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,364,160.48 Kapkatet Feedback
Construction of Kipkosil River Pipe Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,755,115.38 Kapkatet Feedback
Construction of Arap Komuilong Ketengeret Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 2,059,237.00 Litein Feedback
Construction of Rift Valley Culverts To enhance transportation infrastructure and improve drainage systems Public Works, Roads and Transport Completed 1,614,225.18 Litein Feedback
Construction of Tuiyobei- Nigeria Box Culvert To mitigate flooding risks, improve local infrastructure resilience Public Works, Roads and Transport Completed 1,200,291.10 Tebesonik Feedback
Construction of Kapchebet Pipe Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,338,758.00 Kabianga Feedback
Construction of Matarmat Pipe Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,038,108.44 Kabianga Feedback
Construction of Nyabangi Road Culverts To enhance road connectivity and improve drainage infrastructure Public Works, Roads and Transport Completed 3,144,017.14 Kabianga Feedback
Construction of Mereonik-Kapnandet mini bridge To improve Drainage Infrastructure Public Works, Roads and Transport Completed 1,238,554.82 Kapsuser Feedback
Construction of Kapmatayo box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,757,756.88 Cheptororiet/Seretut Feedback
Construction of Kapstehano Pipe Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,791,139.49 Cheptororiet/Seretut Feedback
Construction of Kapkelek Cross Culvertd To improve Drainage Infrastructure Public Works, Roads and Transport Completed 1,929,080.00 Cheptororiet/Seretut Feedback
Construction of Chepkutbei Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,737,186.72 Cheptororiet/Seretut Feedback
Construction of Kapkonga box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,189,997.66 Waldai Feedback
Construction of Kapcheluch Foot Bridge To improve Drainage Infrastructure Public Works, Roads and Transport Completed 1,790,690.34 Chaik Feedback
Construction of Kimaut-Karap Bangoror Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,500,004.20 Londiani Feedback
Construction of Lelsotet-Saw mill Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,688,640.00 Londiani Feedback
Construction of Kap Jackson-Anderea Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,430,494.50 Londiani Feedback
Construction of Kapkondoo-Binam pipe culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,989,836.00 Londiani Feedback
Construction of drainage Structures at Barotion Road To improve road safety and accessibility Public Works, Roads and Transport Completed 1,945,686.56 Londiani Feedback
Construction of Jagoror Bridge and Maintenance of the abutments To improve road safety and accessibility Public Works, Roads and Transport Completed 1,551,765.17 Londiani Feedback
Construction of Lelsotet- Sawmill Pipe Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 1,144,000.00 Londiani Feedback
Construction of Murazoi Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,792,349.04 Chepseon Feedback
Construction of Arap Soi Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,450,000.00 Kedowa/Kimugul Feedback
Construction of Chebwareng Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,037,760.81 Chepseon Feedback
Construction of Kamuogo-Independent Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,392,307.98 Tendeno/Sorget Feedback
Construction of Morombit Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,451,994.99 Chilchila Feedback
Construction of Mogire Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,700,602.00 Chilchila Feedback
Construction of Murgut Bridge and 3km approach Road To improve road safety and accessibility Public Works, Roads and Transport Completed 1,592,276.72 Chilchila Feedback
Construction of Kawangware Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,569,543.43 Kamasian Feedback
Construction of Kapkwen Matarmat Box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,851,583.44 Kipkelion Feedback
Construction of Matarmat Box culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,910,372.33 Kipkelion Feedback
Construction of Kapkoros-Njoro Box Culvert in 940 To improve road safety and accessibility Public Works, Roads and Transport Completed 1,225,500.00 Kunyak Feedback
Construction of Kapkurin Cross Culverts To improve road safety and accessibility Public Works, Roads and Transport Completed 3,292,320.00 Kunyak Feedback
Construction of Kapkesiro Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,004,881.00 Sigowet Feedback
Construction of Kipranye Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,283,573.21 Sigowet Feedback
Construction of Muteta Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 2,564,526.08 Sigowet Feedback
Construction of Chebotot-Ngeremwo Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 4,837,715.40 Soin Feedback
Construction of Kapkisai Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,630,209.12 Soin Feedback
Construction Of Kamaget Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,352,869.92 Soliat Feedback
Construction Of Chepkoson Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 1,879,200.00 Soliat Feedback
Construction of Chepyegon- Arap Tegere Bridge To improve road safety and accessibility Public Works, Roads and Transport Completed 2,129,520.00 Soliat Feedback
Construction Of Cheptembe Tililbei Box Culvert To improve road safety and accessibility Public Works, Roads and Transport Completed 3,174,000.00 Kaplelartet Feedback
Kapzakayo-Ainamoi Poly Road 2.2km, Ainamioi Sec- Chemorir Road 1.9km ,Nyinyitwet-Kiburet Rd 1.9 Km,Merto-Kichorian Rd 4 Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,483,205.00 Ainamoi Feedback
Chepkoyo Quarry- Sambula-Lelechwet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,254,922.26 Ainamoi Feedback
Ainamoi Centre- Itibet Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,223,988.38 Ainamoi Feedback
Budalangi - Kap CID -Bechulelach Road 2km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,794,746.48 Ainamoi Feedback
Sambula-Lelechwet-Mureret Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,339,908.12 Ainamoi Feedback
Openning Of Laliat Lower-Chesilyot-Lelboinet Rd 5km, Merto Chesilyot 2km, Grading Gravelling Compaction Of 0.3km Ainamoi Centre Rds., To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 982,608.00 Ainamoi Feedback
Kamelilo Cofee Factory-Gokul Quarry Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,120,790.00 Ainamoi Feedback
Merto Darajet-Kap Fredrick Road 3km, Kabarus-Kipchorian Road 2.5km, Completion Of Budalangi -Kap CID- Bechulelach 2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,605,056.16 Ainamoi Feedback
Kapzakayo - Ainamoi Poly Rd; Ainamoi Sec – Chemor Road; Nyinyitwet - Kiburet; Metro - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,834,702.00 Ainamoi Feedback
Tabet Quarry(Cheribo Tbc-Kapsinei-Kapchumo Rd,Sound City-Telanet Tbc Road) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,710,950.76 Kapsoit Feedback
Karap Teregei - Gabel Rd; Tilrap Malit -Kirongisyet Rd; Kaptimothy - Chelule Rd; Chemoiben Pry; Chemoiben Pry - Koitabai Rd; Arap Kenei - Kiptetoon Rd; Kiptetoon - Lemeiywet - Tunga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,655,503.96 Kapsoit Feedback
Off B1 -Kaboswa-Cheptagum Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,808,646.12 Kapsoit Feedback
Kenegut-Itibet-Chepkuk Cheplel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,502.56 Kapsoit Feedback
Cheribo Tbc -Kapsinei Road 1.3Km, Kipkutung Cheribo Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,338,591.28 Kapsoit Feedback
Tabet Quarry Excavation(Cheribo Tbc-Kapsinei-Kap Chumo Rd,2.0Km, Telanet-Chepkurbet Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,120,308.65 Kapsoit Feedback
Cheribo Tbc-Kap Sinei -Kapchumo Road 2.0Km,Telanet-Chepkurbet Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,283,802.58 Kapsoit Feedback
Murram Supply At Tabet Quarry(Cheribo Tbc-Kapsinei-Kap Chumo Road) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,798,813.00 Kapsoit Feedback
Cheribo Tbc-Kapsinei- Kapjuma Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,725,073.12 Kapsoit Feedback
Offc35-Mbororu-Lemeywet Rd; Kapchetinget-Kamundui-Kachesik Rd; Offc35-Kipsoi-Kapnandet Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,551,375.86 Kapsoit Feedback
Offc35-Asurur-Cheribopryrd;Offc35-Kipteganpry Sch.Rd;Kiptegan-FGCK Rd;Kaporiango-Karachebochok-Tuiyobei Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,246,269.68 Kapsoit Feedback
Masaria TBC-Samituk Rd; Off C35 - Kondamet - Ainamoi Pry Sch Rd; Off C 35 - Itibet - Taturo Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,821,705.20 Kapsoit Feedback
Off C35-Kosisit Pry Sch Rd; To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,197,834.00 Kapsoit Feedback
Samutet-Kapkorio Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,694,477.00 Kapsoit Feedback
Kapsoit Sec-Deliverance-Kapseriord To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,423,090.00 Kapsoit Feedback
Kapsoit-Telanet Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,640,000.00 Kapsoit Feedback
Kenegut Mkt-Mongo-Itibetchepku-Cheplel,Kenegut Mkt-Cheplel Pry-Cheplel TB-Muratit,Kiboiybeislap Slaughter-Kimasian-Kaptoroi-Kaboswa-Kapsoit Mkt-Kiptenden TBC;Abrahamacademy Telanet-Kaboswa TBC Rd;Kap Job Mkt- Karap Mursoi ;Offe222-Chesilyotwater Project Intake Sugutekpry Rd;Cherandas-Kap Willion-Kapsaih Rd;Kapsoiyo Healthcentre-Kapsoiyo Sec School ;Kapsoiyo Healthcentre-Kapsoiyo Sec School ;Baraka Pry-Kapmungei Rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,955,739.20 Kapsoit Feedback
Kapmosi-Kipmwokoi Itibet Rd,;Telanet Water Tank-Ngecherok Pry-Chekurbet-Kapmaso TBC Rd;Off C35-Kosisit Pry Rd;Chepkurbet Pry-Sachwan Rd;Ngecherok Pry-Keldapbelyot River;Sondu Cityncentre-Keldapbeliotriver ;Sonducity Centre-Grassland Academy;Ngecherok FGCK-Church-Sosit Pry-Karap Mase Rd;Off E222-Kiplukirikitriver-Cheribo Pry;Ogirgir Pry Sign Post- Ogirgir TBC--Cherandas;Kisabei Pry-Cherandas-Kapchesitgei-Kiptegan Nursery School;Off E222-Brilliant Academy;Kapsoitsec School-Kaboswa;Kwa Kiget Shop- Kiptegan Pry-Kiptegan FGCK;Kenegut Mkt-Kisabeipry-Kiptegan Pry To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,345,078.63 Kapsoit Feedback
Constaruction of Ainapsosiot-Cheriroet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,781,416.00 Chepseon Feedback
Construction of Binyiny- Sogobet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,803,131.00 Chepseon Feedback
Construction of Kamagaa-Sogobet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,510,347.00 Chepseon Feedback
Construction Maili Nne - Chepnoet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,679,607.60 Chepseon Feedback
Construction of Kamarus - Kamarus Annex - Kamarus school for Disability Ltd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,999,999.00 Chepseon Feedback
Construction of Chilchila - Lamaiyat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,949,930.00 Chepseon Feedback
Construction of Kichawir - Tata; Kapchomishan -Kaminit; Kapchomishan - Leberer Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,649,608.47 Chepseon Feedback
Construction of Chepsir- Arap Kitai - Binyiny road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,988,767.30 Chepseon Feedback
Construction of Kapseger- sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,800,000.00 Chepseon Feedback
Construction of Off B1-Sabunit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,933,500.00 Chepseon Feedback
Kipchawir-Leberer Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,400,000.00 Chepseon Feedback
Kolonget-kipchawir Road, Monori-Sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,800,000.00 Chepseon Feedback
Tilito-chesumot Road, Chebwagan-kaptenet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,971,577.84 Chepseon Feedback
Construction of Off B1-Chepsir Deliverance church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,722,878.00 Chepseon Feedback
Lambel Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,937,040.00 Kedowa/Kimugul Feedback
Construction of Kapchongoti Farm - Tuiyobei Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,648,747.00 Kedowa/Kimugul Feedback
Construction of Delivarance -Ngatumek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,850,742.40 Kedowa/Kimugul Feedback
Culverts Installation to Ewat-Kap Maxwell Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,080.80 Kedowa/Kimugul Feedback
Ndarugu-Kedowa Centre;Kedowa Centre access roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,403,239.72 Kedowa/Kimugul Feedback
Construction of Kapmaxwel-Ewat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,955,739.20 Kedowa/Kimugul Feedback
Tuiyobei-Kedowa river-Kimaut Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,345,078.63 Kedowa/Kimugul Feedback
AGC Karanja-Simotwet-Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,423,090.00 Kedowa/Kimugul Feedback
Kamwingi two- Shabaa Road,kamwingi center keringet pry, forest Road, Kap pilot -kapkiron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,676,607.60 Londiani Feedback
Kamwingi two- Shabaa Road,kamwingi center keringet pry, forest Road, Kap pilot -kapkiron Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,803,131.00 Londiani Feedback
Kaphilemon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,510,347.00 Londiani Feedback
Construction of Kamaina-Sachangwan-Lemotit-Tarmasang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,636.40 Londiani Feedback
Construction of Kapfinch-Sotik-Tachasis-Kaplimo-Chumba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,780,440.00 Londiani Feedback
Construction of Nyairobi - Saramek centre- Shabaa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,414,374.00 Londiani Feedback
Construction of Kondamet - Chelalang Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,446,341.00 Londiani Feedback
Construction of Hill- tea - Wambare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,551.68 Tendeno/Sorget Feedback
Construction of Eastleigh-Independent- Forest Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,982,880.00 Tendeno/Sorget Feedback
Construction of Subukia-Mugumoini Road,Mugumoini-Kamuogo Road,Kamwingi-Miti Tatu Road,Subukia-wambare Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,395,805.00 Tendeno/Sorget Feedback
Mugumoini-Independent Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,496,861.00 Tendeno/Sorget Feedback
Subukia-Kaburi-Mugumoini Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,462,262.36 Tendeno/Sorget Feedback
Kipteris-Korosiot-Tindiret Forest Road; Siret Centre- Siret Factory-Boror Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,337,339.70 Chilchila Feedback
Forternan Town Road; Koisagat-Mategee Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,348,409.00 Chilchila Feedback
Sereng-Chebululu-Boror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,391,310.00 Chilchila Feedback
Cherara Centre-Kamiwa-Coffee Factory Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,686,859.18 Chilchila Feedback
Timbilil-Tegat-Kaplogoro Kamotos Road; Tunnel - Chembek - Mogoywet - Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,253,031.11 Chilchila Feedback
Yalla-Kipteres-Tinderet Road; Mogire Sec- Teldet - Kiptenden Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,180,625.61 Chilchila Feedback
Cheborus-Kaptuiya-Korosyot Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,375,135.00 Chilchila Feedback
Yalla-Kipteres-Tinderet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,596,586.00 Chilchila Feedback
Chepkendi -11 - Kapkures - Serenge Road; Kositany - Sombo Road;Koisagat - Kamiwa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,745,730.45 Chilchila Feedback
Kaplelit- Kamotos Road and Kamiwa- Kamotos Rod To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,253,031.11 Chilchila Feedback
Kamiwa Factory-Cherara Kamaget;Kenegut Mkt--Kisebei Pry Sch. Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,596,000.00 Chilchila Feedback
Road Opening Opening Of Kokwet-Toroton-Tombiret-Kipsasur Road. (15km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,412,942.14 Chilchila Feedback
Tunnel-Chepkosa Nyanza Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,144,958.40 Chilchila Feedback
Kasheen - Borowet - Morau Pry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,984,082.64 Kamasian Feedback
Kasheen-Kapluso-Chemonge Road;Lelu-Central-Nyairobi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,420.00 Kamasian Feedback
Kapkures-Nyasakia Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,739,902.68 Kamasian Feedback
Kasheen-Borowet Road 6km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,155,122.40 Kamasian Feedback
Kasheen-Borowet Road 6km;Leldet-Kipsegi Road 4km;Kwa Mutai-Tingatela 6km Kasheen Quarry To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,728,298.00 Kamasian Feedback
Mtaragon-Kawangware Road;Chebirirmoi-Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,934,395.20 Kamasian Feedback
Railway - Kipchorian; River Losirwo - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,556,047.00 Kipkelion Feedback
Railway - Kipchorian Roads; Siret Pry Road; Chemager -Siret Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,698,992.00 Kipkelion Feedback
Segetet Junction-Kaplabotwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,196,586.40 Kipkelion Feedback
Cheboit-Tingoro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,849,252.00 Kipkelion Feedback
Siret Centre-Siret Factory- Boror Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,738,050.00 Kipkelion Feedback
Siret-Tuiyobei Road,Off C35-Chemagel-Quarry Road,Kaborok-Kipchorian Road, Kaborok Tuiyobei To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,889,822.80 Kipkelion Feedback
Sugutek-Kalyet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,445,996.00 Kipkelion Feedback
Railway - Kipchorian River; Lesirwo - Kipchorian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,875,885.00 Kipkelion Feedback
Kapkwen-Chesonoi-Kabirong Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,712,048.00 Kunyak Feedback
Koteteni-Chepsil,Girimori-Urafiki Factory To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,973,507.00 Kunyak Feedback
Girimori-Chesonoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 7,495,838.80 Kunyak Feedback
Girimori-Urafiki Factory;Kotetni-Chepsil Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,411,314.00 Kunyak Feedback
Kenegut-Tumoek-Kapkurin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,969,654.01 Kunyak Feedback
Nyanza-Girimori-Kapwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,952,210.00 Kunyak Feedback
Kenegut-Kapkurin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,253,487.00 Kunyak Feedback
Asenewet - Judo - Kipsitet Highway; Rai Cement - Kaplelach Pry Road; Rai Cement - Kaplelach - Kisumu Concrete; Cheptagum- Chebirech Road; Kapsombich-Kaptalamwa To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,850,742.40 Soin Feedback
Rai Cement-Kaplelach Pry-KSM Concrete ;Cheptagum-Chebirir Road,Kipkombich-Kiptalamwama Road,Kapchebwai-Kapnyoge Road,Kejiriet Dip-Cheptililik Pry;Asenetwet-Judo-Kipsitet-Dip Bridge Road,Cheptililik Pry-Kipsitetet Ngerermwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,080.80 Soin Feedback
Bokwo - Kapchebwai Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,986,676.00 Soin Feedback
Cheptilili-Chebotot-Ngeremwo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,810,349.20 Soin Feedback
Kipkombich-Kaptalamwa Road;Cheptagum-Chebirech Road;Chepterwo-Chebirech Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,400,000.00 Soin Feedback
Kaplengeny - Sachangwan - Kiplogoi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,045,772.16 Soliat Feedback
Kapsegut Quarry For Gravelling Kapsimba - Chesiche Road; Chesiche - Kabokyek Road; Chesiche - Tuiyobei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,432,128.00 Soliat Feedback
Chesiche-Kabokyek Cattle Dip, Tuiyobei Pry-Kapsimba Road,Kaprero-Chesiche Pry Road,Kaptala-Chesiche Academy Road, Kap Elisha-Tenduet- Tuiyobei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,492,554.16 Soliat Feedback
Soko Huru Kapsogut Road, Shauri-Kinoyo Road, Posta-Chemutian Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,870,815.50 Soliat Feedback
Tuiyobei Bridge-Soliat-JoRoadan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed N/A Soliat Feedback
Chesiche Pri-Kamugut Road;Soko Ndizi-Kapchebungei Road,Kapchangarie- Kaplengei Road,Sombicho-Kipkecheiyet Road,Sombicho-Samutet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,900,037.16 Soliat Feedback
Kabokyek-Chesiche-Tuiyobei-Motero-Kiptenten Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,352,380.00 Soliat Feedback
Kaitui Center-Birirbei-Chemutian Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 937,535.20 Soliat Feedback
Arap Ngeny-Brendashop Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,089,611.20 Soliat Feedback
Shauri Yako-Kaitui Mkt Road,Kaitui Bridge-Coffee Factory Road,Sombicho Highway-Brenda Shop Road,Ngeny Road,Sombicho Pry-Samutet Road,Sombicho Pry - Kipkecheiyet Road,Kapchangarie-Kaplengei Road,Chesiche- Kapsimba Road,Chesiche -AGC Road,Chesiche-Kabokyek Road,Chesiche -Tuiyobei Road., To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,500,000.00 Soliat Feedback
Keteswa-Mwebe-Chepngoror Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,299,969.86 Sigowet Feedback
Kipranye-Kabasweti-Mindililwet Road;Cheptuiyet Centre-Chemanget Road;Cheptuiyet Girls-Kululut River Road ;Kapeli Pry-Sigowet KMTC ROAD;Lutheran Church -Sigowet-Cheptembe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,002,379.24 Sigowet Feedback
Cherote - Kigomba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,859,466.20 Sigowet Feedback
Chepkemel Shopping Centre - Arap Cheruiyot- Chepkwer- Sumeek Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,781,416.00 Kaplelartet Feedback
Cherote-Obot Recho-Kap Kapkamano-Cherote Sondu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 936,463.12 Kaplelartet Feedback
Gravelling of Simbi Box Culvert and Simbi Pry Sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,403,551.86 Soin Feedback
Construction of Off Kabore- Kipsitet Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,500,000.00 Soin Feedback
Masaita Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,503,401.20 Londiani Feedback
Jambo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,098,788.00 Tendeno/Sorget Feedback
Londiani farmers Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,465,692.48 Londiani Feedback
Kabarak Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,676,037.48 Londiani Feedback
Chepcholiet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,922,478.60 Chepseon Feedback
Cheboror Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,871,238.20 Chepseon Feedback
Irerma Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Kedowa/Kimugul Feedback
Tiriita Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kedowa/Kimugul Feedback
Ngatumek Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kedowa/Kimugul Feedback
Tumaini Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Tendeno/Sorget Feedback
Mugumoine Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Tendeno/Sorget Feedback
Kamuogo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Tendeno/Sorget Feedback
Kapkondoo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Londiani Feedback
Chepkongony ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kedowa/Kimugul Feedback
Tulwap Kiplekwa ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,912,000.00 Kedowa/Kimugul Feedback
Ngatumek ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Kedowa/Kimugul Feedback
Sailo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chepseon Feedback
Chepchabai ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chepseon Feedback
Jambo ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 896,000.00 Tendeno/Sorget Feedback
Construction of a Classroom at Leberer ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chepseon Feedback
Construction of an Administration Block and Library at 938 VTC Strengthen Institutional Management and Operations Education, Youth Affairs, Sports, Culture and Social Services Completed 2,912,000.00 Chepseon Feedback
Construction of pit latrine at Chesinende ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 672,000.00 Chepseon Feedback
Construction of pit latrine at Kapchemusian ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chepseon Feedback
Construction of pit latrine at Kaptaragon ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 448,000.00 Chepseon Feedback
Construction of pit latrine at Lamaiyat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chepseon Feedback
Construction of a pit latrine at Kimasian ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed N/A Kedowa/Kimugul Feedback
Construction of 2 Classrooms at Londiani Vocational Training Centre Education, Youth Affairs, Sports, Culture and Social Services Completed 672,000.00 Londiani Feedback
Construction of ECDE classroom at Kapkwen ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,136,000.00 Londiani Feedback
Construction of a classroom at Kapsinendet ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 560,000.00 Londiani Feedback
Construction of ECDE classroom at Jambo ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Tendeno/Sorget Feedback
Construction of a classroom at Kamuogo ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Tendeno/Sorget Feedback
Completion and Renovation of ECDE classrooms at Chebaibai and Kamaua ECDE Centres Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Tendeno/Sorget Feedback
Construction of a 3 door pit latrine at Sorget ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Tendeno/Sorget Feedback
Kokwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Chilchila Feedback
Kabirong/Kiptenden Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kunyak Feedback
Chesoen Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Centre Juu Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kamasian Feedback
Ndubusat Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Samolel Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Korosiot Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Tuiyobei Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Barsiele Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Tachasis Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Maronget/lemeywet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipkelion Feedback
Kapias Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kunyak Feedback
Chepngosos/sirgoi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kunyak Feedback
Lesonet/sirgoi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kunyak Feedback
Koisegem Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Chilchila Feedback
Tulwapmoi Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Chilchila Feedback
Chepkendi Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Milimani Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Imbaragai Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kunyak Feedback
Talai farm Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Kunyak Feedback
Lelechwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipkelion Feedback
Chebirir Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Borowet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kamasian Feedback
Centre juu Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kamasian Feedback
Laliat Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kamasian Feedback
Ndubusat Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Samolel Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Korosiot Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Chilchila Feedback
Cherara Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Chilchila Feedback
Tuiyobei Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Barsiele Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipkelion Feedback
Maronget/lemeiywet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Kapias Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kunyak Feedback
Chepngosos/ koru farm Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kunyak Feedback
Leldet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Kamasian Feedback
Borowet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kamasian Feedback
Milimani ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,040,000.00 Chilchila Feedback
Chepkendi ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,280,000.00 Chilchila Feedback
Tulwap-Moi ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Chilchila Feedback
Chebirir ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Lelechwet ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipkelion Feedback
Imbaragai ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kunyak Feedback
Kotetni ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kunyak Feedback
Talai Farm ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 6,720,000.00 Kunyak Feedback
Kilengel ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kunyak Feedback
Tabaita ECDE Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Ainamoi Feedback
Chebigen Polytechnic To provide accessible, practical, and industry-relevant technical education and vocational training. Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Ainamoi Feedback
Construction of ECDE Classroom at Barsayan ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Ainamoi Feedback
Construction of a 6 door Pit Latrine at Poiywek ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Ainamoi Feedback
Construction of a Classroom at Chepkoiyo ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Ainamoi Feedback
Construction of a classroom at Annex Prison ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,480,000.00 Kapkugerwet Feedback
Construction of a Classroom at Tabain ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kapsaos Feedback
Construction of an ECDE Toilet at Kosisit ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kapsaos Feedback
Construction of ECDE Classroom at Buchenge ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 6,720,000.00 Kapsaos Feedback
Construction of an ECDE classroom and 2 door pit latrine at Koibeiyot ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Kapsaos Feedback
Construction of a 3 door pit latrine at Cheplel ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kapsoit Feedback
Construction of a classroom at Cheplel ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,680,000.00 Kapsoit Feedback
Construction of a classroom at Kisabei ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kapsoit Feedback
Construction of a classroom at Kinyose ECDE centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Kipchimchim Feedback
Construction of a pit latrine at Kerego ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Kipchimchim Feedback
Construction of ECDE classroom at Kipsotet ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Kipchimchim Feedback
Ochi Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,600,000.00 Tebesonik Feedback
Ainamoi/Shinners Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,360,000.00 Chemosot Feedback
Tegat Junior Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 6,496,000.00 Cheplanget Feedback
Chebakal Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,016,000.00 Litein Feedback
Kiptenden Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Litein Feedback
Nyambolosa Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,240,000.00 Litein Feedback
Kisutuk/tepkutwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Cheboin Feedback
Kimolwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,120,000.00 Cheboin Feedback
Kapsogut Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,800,000.00 Cheboin Feedback
Kamachumo Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 7,840,000.00 Kapkatet Feedback
Chematich Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 994,750.00 Kapkatet Feedback
Kaptebengwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 504,560.00 Kapkatet Feedback
Kaptebengwet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,669,700.00 Kapkatet Feedback
Roronya Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,353,625.00 Kapkatet Feedback
Ketigoi/charera Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,003,400.00 Kisiara Feedback
Ngainet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,495,250.00 Kisiara Feedback
Kolonget Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 5,395,400.00 Kisiara Feedback
Chelelaibei Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,636,000.00 Chemosot Feedback
Cheborema Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 3,483,800.00 Chemosot Feedback
Chesingoro Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,001,700.00 Chemosot Feedback
Siritiet Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,003,400.00 Tebesonik Feedback
Litiik Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 4,114,970.00 Tebesonik Feedback
Kenene Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 2,731,500.00 Tebesonik Feedback
Kamugenik/tiriitabmoita Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,113,000.00 Tebesonik Feedback
Kaminjeiwa Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,020,600.00 Tebesonik Feedback
Ochi pry Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,112,400.00 Tebesonik Feedback
Lalwat ecde Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,020,600.00 Kisiara Feedback
Ngesumin Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 560,000.00 Litein Feedback
Rwandet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,217,100.00 Kisiara Feedback
Kapnyagoba/tetile Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,254,200.00 Cheboin Feedback
Ochi Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,323,100.00 Tebesonik Feedback
Ainamoi/shinners Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,264,445.00 Chemosot Feedback
Tegat junior Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,788,371.00 Tebesonik Feedback
Chebakal Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,853,243.00 Litein Feedback
Kiptenden Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,773,882.00 Litein Feedback
Kimolwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,311,220.00 Cheboin Feedback
Kapsogut Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,786,045.00 Cheboin Feedback
Kamachumo Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,583,000.00 Kapkatet Feedback
Chematich Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,786,700.00 Kapkatet Feedback
Roronya Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,425,028.00 Kapkatet Feedback
Ketigoi/tulwet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,537,000.00 Kisiara Feedback
Ngainet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 700,000.00 Kisiara Feedback
Kolonget Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,593,180.00 Kisiara Feedback
Chelelaibei Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 2,060,640.00 Chemosot Feedback
Cheborema Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 7,001,400.00 Chemosot Feedback
Chesingoro Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,370,580.00 Chemosot Feedback
Geterwetecdetoilet Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,752,420.00 Chemosot Feedback
Construction of a toilet at Ririat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 969,900.00 Cheboin Feedback
Construction of ECDE classroom at Tuiyobei ECDE Centre Improve access, quality of learning and care in ecde centers Education, Youth Affairs, Sports, Culture and Social Services Completed 1,344,080.00 Cheboin Feedback
Construction of a twin Workshop at Chemosot VTC Phase I Expand Practical Training Capacity. Support Youth Empowerment and Employability Education, Youth Affairs, Sports, Culture and Social Services Completed 1,647,240.00 Chemosot Feedback
Construction of a pit latrine at Nganaset ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 4,107,220.00 Kapkatet Feedback
Construction of a 3 door pit latrine at Lalwat ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 1,810,500.00 Kisiara Feedback
Construction of a 3 door pit latrine with urinal at Cheptagum ECDE Centre Ensure Hygiene and Sanitation, Promote Health and Disease Prevention Education, Youth Affairs, Sports, Culture and Social Services Completed 3,999,900.00 Tebesonik Feedback
Proposed construction of non-motorized transport facilities To provide for parking and paths for safe movement by pedestrians within town Lands, Housing and Physical Planning Completed 3,000,000.00 Kapkugerwet Feedback
Beautification of Uhuru gardens and construction of fire station Enhance Aesthetic Appeal, Improve Usability and Comfort Lands, Housing and Physical Planning Completed 4,739,902.68 Kapkugerwet Feedback
Refurbishment of the Deputy Governors' office Enhance Aesthetic Appeal, Improve Usability and Comfort Lands, Housing and Physical Planning Completed 1,350,054.12 Kipchebor Feedback
Proposed Construction perimeter wall To provide physical protection for the premises by preventing unauthorized access and reducing theft, vandalism, or encroachment. Lands, Housing and Physical Planning Completed 3,341,340.00 Kipchebor Feedback
Proposed construction of storm water drainage facilities (Phase 1 – World Bank Funded) To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. Lands, Housing and Physical Planning Completed 3,564,424.32 Kapkugerwet Feedback