| Leberer-Kamachungwa-coffee factory road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
3,941,891.12 |
Chepseon |
Feedback |
| Construction of 938- 938 Girls Road; Chepsir- Kipkeremwo Road; Monori- Sailo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,490,816.96 |
Chepseon |
Feedback |
| Construction of Culverts at 946 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
4,493,817.26 |
Kapkugerwet |
Feedback |
| Baregeiywet Dispensary Road (Twin 900mm Culvert 14M); Chepkembe B (7m, 900mm); Ainaptibik Culvert (7m, 900mm) Menjo River (7m 900mm) Arap Oriango (14m, 900mm) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,098,500.00 |
Soliat |
Feedback |
| Routine Maintenance of Kaplelartet chiefs' office-Tabaita center road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
|
2,996,699.92 |
Kaplelartet |
Feedback |
| Construction of Off B1-Kaitui bridge-kiptugumo pry sch Road; Kamasenga-Soliat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
3,695,760.00 |
Soliat |
Feedback |
| Segetet-Siranga Road (7m, 900MM); Chebirir-Sachangwan Road (7m, 600MM); Kaula-Kapsoton Road (14m, 600MM) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
616,804.48 |
Kipkelion |
Feedback |
| Supply, Delivery, And Installation Of Kivuno-Korori Road;Mugumoini-Centre Road;Subukia-Centre Road;Centre One -Gwitu Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
2,007,746.56 |
Tendeno/Sorget |
Feedback |
| Proposed Culverts Installation To Bosuben Junction-Tanguret Road,Kipteran-Kapsinendet Church Of Christ Road,Kap Petero-Kapsimbiri Dip Road,Kapsimbor-Kap Mosonik Shops,Arokyet Tinga-Kap Cape Town Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,900,928.54 |
Cheplanget |
Feedback |
| Supply,delivery and installation of culverts at Chebinyiny-Kenene rd,Mobet-tabut rd,mobet-keregut road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,847,972.80 |
Cheplanget |
Feedback |
| Routine Maintenance of Silva junction-Siongi-Kampala road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
On-Going
|
3,640,590.40 |
Tebesonik |
Feedback |
| Routine Maintenance of Salgaa-Kongeren river-Kaplaiba road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,206,407.28 |
Soliat |
Feedback |
| Construction of Kelunet-Kapkimoro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
500,010.45 |
Tebesonik |
Feedback |
| Excavation of Kalmelilo coffee farm-reresik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,051,453.00 |
Ainamoi |
Feedback |
| Construction of Koitabmat-Bondeni-Kiburet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,144,000.00 |
Ainamoi |
Feedback |
| Construction Of Chepsetyion Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,451,995.00 |
Kapkugerwet |
Feedback |
| Construction Of Karap Kitur-Sumeiyon-Victor Academy-Orison Annex Road 4.8Km,Arap Kitur-Ainapbelek-Chelogoi Road 0.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,755,115.00 |
Kapkugerwet |
Feedback |
| Construction Bondeni- Kerego Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,144,017.00 |
Kapkugerwet |
Feedback |
| Construction Of Arap Chepkoshom- Laibon Bridge- St. Joseph Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,791,139.00 |
Kapkugerwet |
Feedback |
| Chepsetyon Assorted Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,929,080.00 |
Kapkugerwet |
Feedback |
| Construction of Kisabei-Kenegut-Lemeiywet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,790,690.00 |
Kapsoit |
Feedback |
| Construction Of Karap Tegerei-Gabriel Road ,Tilitrap Malit-Kirongisyet Road,Kap Timothy-Chelule Road,Rugut-Chemoibei Road, Chemoibei Primary-Koitabai Road,Arap Kenei-Kiptetoon-Lemeiywet-Tunga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,500,004.00 |
Kapsoit |
Feedback |
| Costruction Of Samutet-Engineer Bett Road 3.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,189,997.00 |
Kapsoit |
Feedback |
| Construction Of Off C35-Kisabei Pry - Kenegut- Lemeiywet Road 3.5Km, Off C35- Cherire Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,197,834.00 |
Kapsoit |
Feedback |
| Constrution Of Ogirgir Sign Post-Ogirgir Tbc-Kisabei Road 2.9km,Off E222-Ketitui Pry-Ketitui Sec Sch Road 0.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,694,477.00 |
Kapsoit |
Feedback |
| Construction of Kenegut centre 1.4km-Kamorongo Road 2km, Kapmosit-Tembwab kenegut Road 2km, Karap Marindany-Cheptagum ROad 3km, Kamosit-Karap keino Road 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,813.00 |
Kapsoit |
Feedback |
| Construction of Kaboswa- Kiptenden- Cheptagum ROad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,725,073.00 |
Kapsoit |
Feedback |
| Construction Of Off B1- FGCK Samutet- Market Road 0.7km, Off B1- JoRoadan Junction Road 1Km, Salgaa-Muguiywet-Oriango Road 1.6Km, Kiget Shop- Sunrise Academy- Sugutek Pry- River Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,004,881.00 |
Kapsoit |
Feedback |
| Construction of Kenegut Centre- Lemeiywet Road 1.5Km; Kenegut AIC-Cherire Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,066,000.00 |
Kapsoit |
Feedback |
| Construction of Telanet girls - Kaboswa TBC rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,879,200.00 |
Kapsoit |
Feedback |
| Construction of Ogirgir sign post-Ogirgir tbc-kisabei Road 2.9km,Off E222-Ketitui pry-Ketitui sec sch Road 0.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,174,000.00 |
Kapsoit |
Feedback |
| Construction of NCPB- Mjini Road; Cereal BoaRoad- Owour Church- Nyagacho- Mjini Road, Slip Footh path-Church- River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,837,715.00 |
Kipchebor |
Feedback |
| Construction Of Jua Kali Rd,Mjini Hilands Rd,Kenya Highlands Roads,Kipchebor Pry Access Roads,Kimungen-Kamasian Agc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,152,100.00 |
Kipchebor |
Feedback |
| Proposed Construction of modern market and installation of high mast flood lights |
To construct a modern, organized, and accessible market facility that meets current safety, hygiene, and commercial standards. |
Lands, Housing and Physical Planning |
Completed
|
4,397,676.00 |
Kipchebor |
Feedback |
| Construction of NCPB Cereals- Nyagacho Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,650,000.00 |
Kipchebor |
Feedback |
| Munai-Kipsot-Toror factory-Kimeswan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,924,548.00 |
Kipchimchim |
Feedback |
| Construction Of Kabianga Tea Factory-Chepkutbei TBC 1.5Km, Tuiyobei Bridge-Kapchebet Agcroad 0.6Km,Kondamet AGC-Turkana Road 0.8Km,Arap Siele Mobego Primary 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
982,608.00 |
Kabianga |
Feedback |
| Construction Of Kaptumbo-Kipkeurit Road 1.6Km, Kibingei Girls-Ngainet Road 1.2Km,Kabianga-Market Road 0.6Km,Kaplong-Kamaso Primary School Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,455,079.68 |
Kabianga |
Feedback |
| Nyabangi Centre-Chesebet Road 1.9k ;itembe-stashine AGC-Link Kiptere Road 0.9km,Karap Cheriro-Kap D.O Road 1.3km;Sinonin-Itondo Bridge Road 2.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,839,344.80 |
Kabianga |
Feedback |
| Kiptule TBC-Kolonget tbc-kaphentry Road 2km, off momul factory-itindo AGC Chemamul SDA ROAD 2.8KM |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,208,281.68 |
Kabianga |
Feedback |
| Construction of Mereonik- Kigorwet- Chief’s Office- Cheboin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,972,551.04 |
Kapsuser |
Feedback |
| Construction of Seretut- Kamathayo- Chepngetuny- Pry- Arap Koech- Arap Mitei- Kap Oriango Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,692,341.47 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kuresiet-Happy church-kibaraa rd 1.5km,michilingwet TBC-chepngerer-mandela Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,202,516.48 |
Cheptororiet/Seretut |
Feedback |
| Construction Of Teldet-Menet Road 2.3Km, Milimani-Machorwa Road 2.1Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
876,889.00 |
Waldai |
Feedback |
| Construction of Sosiot Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,348,662.40 |
Waldai |
Feedback |
| Construction of Kipkoskei-Kapkolumbei Road, 0.5km, cheboin tbc-Kaprap joshua r 1.5km,arap koskei-Faith Church-Kapnyangai river-bot elijah corner tatu-Link Highway Road 2.7km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,193,841.00 |
Cheboin |
Feedback |
| Construction of Kenene Quarry- Kenene TBC Road 0.9km; Cheplanget Market Roads 0.3Km; Twoliot TBC- Kapsogeruk Bridge Road 1Km, Kaldit TBC- Matureti Road 1Km; Cheplanget Market- Kapsiongei Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
937,092.08 |
Cheplanget |
Feedback |
| Construction of Arap Kesoro-Tamboiyot Box Culvert Road 0.6Km,; Kap Petero-Kap Simbirir Dip Road 0.6Km, Kapsimbirir-Kap Mosonik Shop Road 1.1Km, Arokyet Tinga- Kap Cape Town Road 1.1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,448,076.80 |
Cheplanget |
Feedback |
| Construction of Mombwo Pry- Sugutek TBC Road 0.8Km; Arap Kesembe- Caterpillar Road 2km; Bosuben Junction- Tanguret Road 1.3Km; Kipteran-Kapsinendet Church of Chridst Road 1.3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,670,678.40 |
Cheplanget |
Feedback |
| Construction of Off Chesingoro TBC-Kapsumet TBC-Chililis-Morit bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,287,129.12 |
Chemosot |
Feedback |
| Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,975,268.96 |
Kisiara |
Feedback |
| Construction of Chemeteget- Molyolok-Kimulwo Deliverance- Off C23 Roads; OFC Church- Shallai- Chelilis Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,897,196.32 |
Chemosot |
Feedback |
| Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,730,644.64 |
Kisiara |
Feedback |
| Construction of Keregut-Taach Centre Road 1km,Tinga-Tulwap Kipsigis Road 0.3km,Misoi-Chebirribei-Aroron Road 0,85km,Mongoita-Chemamanik Road 0.4km,Sunset Junction-Chepkoiyo Road 1km, Kelelwa-Chepkoiyo Road 0.7km,Kasebet-Chepkembe Road 1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,496,709.00 |
Kisiara |
Feedback |
| Shiners-Temuge r 0.4km, Kaptirbet-koros-ngesumin Road 2.5km, Kapkatet mortuary-Cementry Road 0.4km, Kapkatet Factory-Nganaset Road 0.6km, cherandas-sewerer Road 0.3km, kapkatet-AIC Holy Harvest church Road 0.5km,Kap mp-cherus tbc Road 0.6km, Off main Road-arap chepkwony Road 0.6km,off main Road-dcs residence Road 0.2, off main road kiko Road 0.2km matunda Road 0.2km, 954east-kipkosil pry sch Road 0.5km,mabwaita Aic -Catholic church Road 1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,495,316.64 |
Kapkatet |
Feedback |
| KMTC Sigowet Extension Line |
To facilitate the installation of new water pipelines through systematic excavation, laying of pipes, jointing, and backfilling, ensuring proper alignment, depth, and protection of the water supply infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
2,272,993.00 |
Kaplelartet |
Feedback |
| Koiwa-Pefa church Road, chebagal tbc,ainapset river agc Road, Tendwet-Kaphilimon Road;Pefa Church-Cheptigit -Arap Maina Road, Kapkaren-Soet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,845,379.00 |
Litein |
Feedback |
| Lebekwet Water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,715,720.00 |
Kaplelartet |
Feedback |
| Construction Of Kamiwa- Kamotos 4.1Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,285,617.68 |
Chilchila |
Feedback |
| Kipsitet borehole water project |
To enhance sustainable access to safe and reliable water for domestic use through the development and equipping of borehole-based water infrastructure and distribution systems |
Water, Environment, Energy and Natural Resources |
Completed
|
1,574,046.00 |
Soin |
Feedback |
| Construction Of Kapwanja- Chebisom Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,026,752.00 |
Chilchila |
Feedback |
| Lelaitich IDP Camp Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,930,399.00 |
Soin |
Feedback |
| Construction Of Baseline Songonyet Kimandui Road , Rarinwet Sereng Road, Chegen Road Laboso Pry Siwot Factory Siwit Dispensary Road , Maarifa Pry Siwot Catle Dip Road, Museum Koiserem Pry Road, Leketetiot Road, Kapkures Road Laboso Academ Siwat Factory Siwot Dispesary Siwot Seconday Siwot Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,853,706.72 |
Chilchila |
Feedback |
| Kipsitet Dip water project |
To improve access to reliable and sustainable water supply for livestock by developing and rehabilitating key water infrastructure, thereby enhancing animal health, agricultural productivity, and livelihoods of the local community |
Water, Environment, Energy and Natural Resources |
Completed
|
5,263,732.00 |
Soin |
Feedback |
| Construction Of Kokwet Secondary School-Kapnguron-Kipsumei Road 2Km,Burutu Dip-Mugut Factory Road 1.6Km,Yala-Magire Secondary School-Teldet Road 2.8Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,479,771.52 |
Chilchila |
Feedback |
| Koitaburot Borehole water project |
To improve access to safe water for both domestic and livestock use through the development of essential water storage and distribution infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
4,252,782.00 |
Soin |
Feedback |
| Construction of Tendwet-Malinja-Magire dispesary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,946,746.88 |
Chilchila |
Feedback |
| Kebimbir water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
6,162,600.00 |
Soin |
Feedback |
| Gravelling of Tendwet-Malinja-Magire dispesary rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,190,255.20 |
Chilchila |
Feedback |
| Laitigo School water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
5,558,080.00 |
Soin |
Feedback |
| Factory-Chepkosa Road,Chepkosa-Legetiot Road,Legetiot-Chembek Road,Chumbek-Kiptenden Road,Sereng-Chepkendi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,005,386.00 |
Chilchila |
Feedback |
| Kapkatit water project |
To improve the safety, reliability, and accessibility of water supply by protecting the natural spring source, constructing a robust distribution pipeline, and establishing user-friendly water points for community access. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,860,032.00 |
Soin |
Feedback |
| Construction Of Seguton Santos Round-AIC Church Road 2.6Km,Pinus Tamarsang 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,154,624.64 |
Kipkelion |
Feedback |
| Kebimbir Water Project 2 |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
4,844,568.00 |
Soin |
Feedback |
| Construction of Off C35-Chebululu Road,Mocheisok-Mumetet Road,Chemamul-kobiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,419,604.56 |
Kipkelion |
Feedback |
| Koitabrot,Kaptalamwa,Kechiriet,Kamalabu & Kaptalamwa Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
7,631,668.00 |
Soin |
Feedback |
| Construction of Liloch Pry sch-Koisaet pry sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,673,199.12 |
Kamasian |
Feedback |
| Koyabei Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,472,000.00 |
Soin |
Feedback |
| Construction Of Bartera-Murero Road,Irengeti-Changee Road,Kawangware-Mtaragon Road,Kaptepengwa-Tinga Farm Road,Kaptepengwo-Bartera-Murera Road,Singoi Road,Kaptego-Borowet Road,Kuakali Road,Kaplaba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,475,605.00 |
Kamasian |
Feedback |
| Bargeiwet Water Project phase 1 |
To enhance water supply capacity, quality, and sustainability by restoring dam storage volume, improving water intake infrastructure, constructing a gravity-fed pipeline system, and protecting the dam area from environmental degradation and encroachment |
Water, Environment, Energy and Natural Resources |
Completed
|
2,624,586.00 |
Soliat |
Feedback |
| Construction Of Centre Juu-Kiringeti-Makanisa Road 4Km, Bartera-Centre Juu Road 1.5Km, Kapkures-Sirgoi Road 3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,434,386.40 |
Kamasian |
Feedback |
| Bargeiwet Water Project- Phase 2 |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,546,532.00 |
Soliat |
Feedback |
| Construction of Centre Juu - Kerengeti - Makanisa Road 4.0km , Bartera- Centre Juu Road 1.5km and Kapkures - Sirgoi Road 3.0km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,873,901.00 |
Kamasian |
Feedback |
| Kabokyek borehole water project |
To enhance sustainable access to safe and adequate water through the construction and installation of essential water infrastructure including storage, pumping, and distribution systems |
Water, Environment, Energy and Natural Resources |
Completed
|
2,651,808.00 |
Soliat |
Feedback |
| Chemosogon - Kipsegi - Kimologit rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,187,800.64 |
Kamasian |
Feedback |
| Kapsorok Water Project |
To rehabilitate and expand existing water supply infrastructure to ensure safe, adequate, and accessible water for both domestic and livestock use in the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
2,649,180.00 |
Soliat |
Feedback |
| Construction Of Njoro-Kapkoros Road 1.5km, Kapserem-Timbek Road 1.5Km, Tumoek-Kapkurin Road 2Km, Tumoek-Kabarak Road 3Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,998,381.92 |
Kunyak |
Feedback |
| Chesiche Water Project |
To improve sustainable access to clean water through spring protection, gravity-based conveyance, solar-powered pumping, and secure storage infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
3,027,560.00 |
Soliat |
Feedback |
| Construction of Kap DO - Njoro Kolonge Road 1.9km; Kapkwen - Kiptenden Road 8.5km; DO's - Kimoro Road 1km; Sireret - Mlango Road 8.6km; Kapis - Kamaragaa Road 1km - Kunyak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,021,708.32 |
Kunyak |
Feedback |
| Kabokyek Pipeline Extension water Project |
To enhance water access and optimize existing infrastructure through pipeline extension, construction of new water points, and strategic relocation of water storage tanks |
Water, Environment, Energy and Natural Resources |
Completed
|
6,557,540.00 |
Soliat |
Feedback |
| Construction of Cattle Dip- Ngepepo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,110,802.16 |
Kunyak |
Feedback |
| Kapkenyoloi-Kikechiyet Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
6,013,795.00 |
Soliat |
Feedback |
| Construction of Kapkilumben-Chagaranda road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,202,523.28 |
Kunyak |
Feedback |
| Regerego-Mogoriot Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
5,818,356.00 |
Soliat |
Feedback |
| Construction of Kapkurin- Kabirong- Chesonoi-Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,501,005.28 |
Kunyak |
Feedback |
| Rehabilitation of Kabokyek Borehole Water Project |
To restore the functionality and efficiency of the existing borehole system to ensure continuous access to clean and safe water |
Water, Environment, Energy and Natural Resources |
Completed
|
4,844,568.00 |
Soliat |
Feedback |
| Constuction Of Kigora-Mosonik Road 3.5Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,650,801.92 |
Chepseon |
Feedback |
| Sombicho Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
1,198,521.00 |
Soliat |
Feedback |
| Chepsir-Kipkeremwo Road 5.7km, Monori- Sailo Road 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,350,000.00 |
Chepseon |
Feedback |
| Chebilawa Spring Protection |
To enhance safe and sustainable access to clean spring water by protecting the water source and improving physical access through the construction of stairways |
Water, Environment, Energy and Natural Resources |
Completed
|
1,860,032.00 |
Soliat |
Feedback |
| Construction Of Kipkeremwo- Ngasura Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,040,978.32 |
Chepseon |
Feedback |
| Kererut Spring Protection |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,065,620.00 |
Soliat |
Feedback |
| Construction of Momoniat Centre- Cheboror Pry- Kap Cherotich- Karap Malel- Sigowet Road 5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,555,520.45 |
Chepseon |
Feedback |
| Kiplogoi Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,034,020.00 |
Soliat |
Feedback |
| Construction of AGC-Kobeiyot Road 0.5Km; Momoniat Pry Schl- Cllr Road 0.2Km, Kap Hezron Road 0.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,876,196.80 |
Chepseon |
Feedback |
| Kongeren Spring Protection |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,224,800.00 |
Soliat |
Feedback |
| Construction of Kapmachungwa-Mutanya road;Off Kamachungwa-Leberer cattle dip road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,098,633.00 |
Chepseon |
Feedback |
| Chepkeikei Water Project |
To enhance access to safe, reliable, and sustainable water supply for households and institutions within Chepkeikei community through the equipping and solarisation of spring protection, construction of sump, installation of UPVC tanks, rising main and distribution pipelines |
Water, Environment, Energy and Natural Resources |
Completed
|
4,437,140.00 |
Soliat |
Feedback |
| Kimigik water Project (Pipeline Extension) |
To enhance access to clean and sustainable water supply by constructing pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
4,298,670.00 |
Ainamoi |
Feedback |
| Construction of Chebitet- Kiletien Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,845,441.00 |
Chepseon |
Feedback |
| Construction of Kipkeremwo - Ngasura Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,562,309.50 |
Chepseon |
Feedback |
| Construction Of Deliverance-Ngatumek Road 3.4Km, Mathias- Kipyemit Road 1.2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,816,435.73 |
Kedowa/Kimugul |
Feedback |
| Construction of Kimugul-Kimoson Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,253,729.28 |
Kedowa/Kimugul |
Feedback |
| Construction of Free pentacost church-Kiprengwe-Kapchelule road; Cattle dip-Miti Moja road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,778.40 |
Kedowa/Kimugul |
Feedback |
| Construction of Off B1-Barkechechek River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,524,012.64 |
Kedowa/Kimugul |
Feedback |
| Construction Of Kwa Chumo Rd,Kipsigori-Agc Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,069,131.16 |
Kedowa/Kimugul |
Feedback |
| Construction Of Kapkondoo-Kapisoi Road 3.8Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,299,034.62 |
Londiani |
Feedback |
| Construction Of Kapkwen Pry School- Arap Kurgat Road 1.2Km, AIC Cheres- Kap Asariah Road 0.4km, Cheres Centre- Forest Road, Arap Choge- Ninja Road, SDA Cheres-Kap Zachariah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,677,463.36 |
Londiani |
Feedback |
| Construction of Kipsirichet-Boma-Jagoror Quarry Road 1.5km,Kapketin-Kigen-Academy Road 1.2km, Baba Noa -DC Road 1.1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,849,905.21 |
Londiani |
Feedback |
| Construction of Kapsenda quarry - Kipsotet Road 1.3km; Kapkondoo SB - Chebirir Road 2.0km and Kimout - Chepkoiyo Road 1.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,075,343.20 |
Londiani |
Feedback |
| Grading, gravelling and compaction of Lower Cheres Road, Kapkwen pry school - Arap Kurgat rd,AIC Cheres - Kap Asariah Road, Cheres Centre - Forestry Road; Arap Choge - Ninja Road; SDA Cheres -Kapzachariah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,762,126.85 |
Londiani |
Feedback |
| Construction of Barno-Kimout pry sch-Kimout centre rd 3km,Sudan Kapraplimo rd 0.3km, Kiplangat-Chepkoiyo-Kapkiondo rd 1.3km, Kapsenda Dispesary-Kerich -Kutu rd 1.7km,Marindany-Lalangbek pry sch rd 1.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,615,691.00 |
Londiani |
Feedback |
| Construction Of Independet- Kamwogo Road 4.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,889,408.00 |
Tendeno/Sorget |
Feedback |
| Grading Of Kaigai Road, Upc Road: 1km, Majani Sawmill- Awii Road: 1.2km,Amos- Saiz Road: 2.7km Independent Church- Dam Road: 1.2km, Ajaja Road:1.1km, Catholic- Main- Cherer Diversion Road: Madam Milka- Koigo Road: Cheres Road: Chebangang Road: Josh- Dam Road: 1.3km, Chane Road: 2km,Upendo Road:1.5km, Wakimani Road:1.1km Zakayo Road:1.2km, Mama Mike Road:1.2km, Mrs Langat- Forest Road: 1.3km, Botpla Road: 1.2km, Mama Wangari- Dam - Daniel Road: 2km, Speaker Kiprono Road:1.8km,Kwa Daniel Road:1.2km,Daniel - Forest Road:2km,Centaa Road: 3km,Kipkelion Works:2.1km, Barsiele Road:1.8km, Mau Road- Rowerr Road:00.8km,Towett-Guito Road:1.2km, Ngingo- Highway Road:1.8km,Peters- Gwitu Road:1.8km Bungoma Road- Isilii Road: Assembly Church Bridge- Cheres Road: Bridge Road: Assembly Church Bridge- Cheres -Bridge Road: Mama Chelimo- Al Shabaab Road: 0.8km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,373,212.26 |
Tendeno/Sorget |
Feedback |
| Construction Of Sorget Chief's Office-Sorget Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,699,633.01 |
Tendeno/Sorget |
Feedback |
| Construction Of Kakibe Primary-Chepkalo Coffee Factory-Catholic Church-Simotwet Primary-Tirita Bricks YaRoad Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,549,505.34 |
Sigowet |
Feedback |
| Construction Of Tabrasoi-Kiplogoi Pry-Saachangwan Road 3.6km,Sugutek-Tuiyobei Pry Sch Road 4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,810,000.00 |
Soliat |
Feedback |
| Construction of Siriat- Kamungesha Road; Moinget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,598,309.60 |
Soliat |
Feedback |
| Construction of Kabingok-Kongereen pry-Mirmiro Road 1.7km,Kapshiongiroi-Kaap Chepsengeny r 2.2.km;Seskaa-Ainap Itiik-Kapmathayo Road 1.4km Kapraptuei-Kamageso Road 1.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,613,813.89 |
Soliat |
Feedback |
| Construction of Soliat boys sec-chepkoson river rd, karobetKamasenga Quarry rd; Korabei-Chesunet-Kapsigowo rd;Cheramor-siriat rd;sesagaa-kapchelemei-Kongereen |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,008,437.76 |
Soliat |
Feedback |
| Construction of Kabokyek- Chesiche Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,270,053.84 |
Soliat |
Feedback |
| Construction of Kapkormom Junction- Chesino Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,769,728.48 |
Soin |
Feedback |
| Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,130,604.50 |
Soin |
Feedback |
| Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,590,290.40 |
Kapkugerwet |
Feedback |
| Proposed Construction of Off B2- Saoset TBC- Chemugusu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,826,637.19 |
Kapkugerwet |
Feedback |
| Proposed Construction of Mjini Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,007,910.00 |
Kipchebor |
Feedback |
| Construction of Koisagat- Chilchila Boundary Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,439,286.70 |
Chilchila |
Feedback |
| Proposed Construction of Chesingoro- Lalagin Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,402,532.80 |
Chemosot |
Feedback |
| Proposed Twin 900mm Cross Culverts to Cherara Bridge, Chebululu- Ng'erng'erwet Road and Kimugul- Ngainet TBC Road At Ngepchebyaat River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,834,996.18 |
Kisiara |
Feedback |
| Routine Maintenance Of Kap Josea-Kap Sakawa Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,350,955.84 |
Kipchimchim |
Feedback |
| Kericho Referral Hospital |
To improve patient comfort and service standards by renovating the existing ward. |
Health Services |
Completed
|
6,557,540.00 |
Kipchebor |
Feedback |
| Routine Maintenance of Cheptororiet-Arap Tonui road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
2,937,783.52 |
Kapsuser |
Feedback |
| Kimugen Dispensary |
To enhance outpatient service delivery by completing the OPD block. |
Health Services |
Completed
|
716,184.00 |
Kipchebor |
Feedback |
| Routine Maintenance of Kosachmwai-Chemoset road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
2,090,061.26 |
Cheptororiet/Seretut |
Feedback |
| Kimeswon Dispensary |
To increase access to healthcare by finalizing construction of Kimeswon Dispensary. |
Health Services |
Completed
|
1,549,354.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Chebitet-Kap Tebengwet road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,187,540.80 |
Kapkatet |
Feedback |
| Kapcheptoror Dispensary. |
To enhance diagnostic services through the construction of a laboratory facility. |
Health Services |
Completed
|
2,334,682.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Reresik-Kiprichait-Roret boys-Chebululu-Tulwet-Ngainet bridge |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,629,140.08 |
Kisiara |
Feedback |
| Construction of Kapkures Dispensary |
To enhance healthcare access within the community. |
Health Services |
Completed
|
2,764,898.00 |
Chilchila |
Feedback |
| Routine Maintenance of Kapkarin-Chesoen TBC road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,469,031.04 |
Litein |
Feedback |
| Construction of Magire Dispensary |
To expand primary healthcare infrastructure. |
Health Services |
Completed
|
4,655,260.00 |
Chilchila |
Feedback |
| Routine Maintenance of Ainapset A.I.C-kap Bomwo-Rungut primary-Chemsembe-Tenwet T.B.C road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,548,176.83 |
Litein |
Feedback |
| Extension of OPD at Makyolok Dispensary |
To improve patient handling capacity through OPD expansion. |
Health Services |
Completed
|
3,201,600.00 |
Chilchila |
Feedback |
| Routine Maintenance of Kibolgong-Tiriitab Eito road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,397,908.00 |
Tebesonik |
Feedback |
| Proposed water works at Makyolok Dispensary |
To ensure reliable water supply for facility operations. |
Health Services |
Completed
|
2,753,660.00 |
Chilchila |
Feedback |
| Routine Maintenance of Kibaranji-Karapngerer road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,162,824.00 |
Tebesonik |
Feedback |
| fencing of Makyolok Dispensary |
To enhance security and compound management. |
Health Services |
Completed
|
4,982,000.00 |
Chilchila |
Feedback |
| Routine Maintenance of Mutwot-Emdit road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,996,587.60 |
Kaplelartet |
Feedback |
| Proposed Completion of Staff House Makyolok Dispensary |
To improve housing for medical personnel. |
Health Services |
Completed
|
3,434,400.00 |
Chilchila |
Feedback |
| Proposed Laboratory Construction in Fort Tenan Hospital- Kericho County |
To expand diagnostic capacity through new lab infrastructure. |
Health Services |
Completed
|
3,800,000.00 |
Chilchila |
Feedback |
| Construction Of Kapkawa Bridge-Chemutian Dip Road 2Km, Chemutian-Kapjonathan Road 1.2Km, Kapkawa Bridge-Kapkongoni Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,615,691.00 |
Soliat |
Feedback |
| Supply, Delivery, Installation and Testing of Generator Cables at Fort Tenan Sub-County Hospital |
To enhance hospital power reliability and safety. |
Health Services |
Completed
|
2,810,349.00 |
Chilchila |
Feedback |
| Construction of Kaplengeny- Kiptugumo Road:2.6km, Tabrasin-Kiptugumo dispensary Road:2.2km, Kamaneesoi-Highway-Moretiik-Arap Tuei Road: 2.2km, Soliat Boys-Kongeren river-Kapchelemei Road:0.5km, Kongereen pry-Mirmiro Road:1.3km, Siriat-Kaosisrwo Road:1.2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,707,324.00 |
Soliat |
Feedback |
| Proposed Construction and Completion of Out-Patient Unit at Siwot Dispensary |
To improve outpatient services and access to healthcare. |
Health Services |
Completed
|
1,085,380.00 |
Chilchila |
Feedback |
| Construction of Soliat Boys- Soliat AGC-Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,389,868.00 |
Soliat |
Feedback |
| Proposed construction and completion of Out-patient unit at Koisagaat Dispensary. |
To strengthen healthcare service delivery at the dispensary level. |
Health Services |
Completed
|
1,293,900.00 |
Chilchila |
Feedback |
| Soliat primary-kamugesh-primary school Road 2.7km Kapnogiro-karapkeino Road 0.8km, salgaa-kaaplachelemei-kongereen dip Road 2.3 km ,kongeren river -kabingoi Road 0.8km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,496,880.51 |
Soliat |
Feedback |
| Proposed Completion and extension of Laboratory at Fort-Tenan Sub County Hospital |
To expand laboratory space for better diagnostic capacity. |
Health Services |
Completed
|
3,986,676.00 |
Chilchila |
Feedback |
| Gravelling For Kapsimba-Chesiche Church Road; Chesiche-Chesiche Ecd Road; Chesiche Ecd-Kaptala Road; Chesiche-Kabokyek Ecd-Kaptala Road;Chesiche-Kabokyek Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,214,963.00 |
Soliat |
Feedback |
| Proposed Completion of Surgical ward at Fort-Tenan Sub County Hospital |
To enhance surgical service capacity at the sub-county level. |
Health Services |
Completed
|
3,794,057.00 |
Chilchila |
Feedback |
| Construction of Chepsengeny-Kwandap Mosong road;Kwandap Mosong-Kaplelach Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,153,380.00 |
Soin |
Feedback |
| Proposed construction of four doors pit latrine with urinal at Songonyet Dispensary |
To improve sanitation standards for patients and staff. |
Health Services |
Completed
|
3,396,524.00 |
Chilchila |
Feedback |
| Proposed Construction of Twin 900mm Cross Culverts To Kapjonah - Bagao Road (5Km); Ainamoi bridge – Maseriat AGC Road (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,494,177.52 |
Ainamoi |
Feedback |
| Proposed Construction of Four door toilet at Sereng Dispensary |
To improve hygiene and sanitation within the health facility. |
Health Services |
Completed
|
560,000.00 |
Chilchila |
Feedback |
| Propsoed Construction of Kokwet Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,252,491.52 |
Chilchila |
Feedback |
| Proposed installation of an electrical panel at Fort Tenan subcounty Hospital and 3 dispensaries. |
To improve electrical distribution and safety in hospital facilities. |
Health Services |
Completed
|
2,160,000.00 |
Chilchila |
Feedback |
| Construction of Tingatella Dispensary |
To expand access to healthcare through establishment of a new dispensary. |
Health Services |
Completed
|
627,908.00 |
Kamasian |
Feedback |
| Completion of Lelu Dispensary |
To finalize pending works for full functionality. |
Health Services |
Completed
|
615,000.00 |
Kamasian |
Feedback |
| Proposed Construction of toilets at Tingatella Dispensary |
To enhance sanitation within the facility. |
Health Services |
Completed
|
4,095,000.00 |
Kamasian |
Feedback |
| Proposed Construction of toilets at Lelu Dispensary |
To improve sanitation and hygiene standards. |
Health Services |
Completed
|
3,345,079.00 |
Kamasian |
Feedback |
| Proposed Completion of OPD at Lelu Dispensary |
To improve outpatient service delivery through OPD completion. |
Health Services |
Completed
|
4,191,360.00 |
Kamasian |
Feedback |
| Routine Maintenance of Elite primary school-Chebangang road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,429,178.00 |
Londiani |
Feedback |
| Proposed completion of OPD at Tingatella Dispensary |
To operationalize the dispensary through OPD completion. |
Health Services |
Completed
|
1,680,000.00 |
Kamasian |
Feedback |
| Routine Maintenance of Barotion sawmill-Lelsotet road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
975,030.00 |
Londiani |
Feedback |
| Proposed completion of staff House at Kasheen Dispensary |
To improve staff accommodation and service availability. |
Health Services |
Completed
|
4,859,466.00 |
Kamasian |
Feedback |
| Routine Maintenance of Slaughter house-Towet bridge-Marindany forest road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,120,200.00 |
Tendeno/Sorget |
Feedback |
| Proposed Fencing and gate to Tingatella Dispensary |
To enhance compound security and access control. |
Health Services |
Completed
|
5,043,060.00 |
Kamasian |
Feedback |
| Routine Maintenance of Murau centre-Bakery road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,034,595.00 |
Kamasian |
Feedback |
| construction of Tuiyobei Dispensary |
To increase healthcare access for the local community. |
Health Services |
Completed
|
3,290,008.24 |
Kipkelion |
Feedback |
| Construction of Off 222- Munai Road 2.4Km, Off 222- Dairy- Kipsotet-Chumo Road 1.7Km, Chepnyonyo-Toror Factory-Boita PAG Church- E222 Road 2.9Km, Off E222- Sepet Pry School Road 0.5km, E222-Kimeswon Road 1.9km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
668,285.00 |
Kipchimchim |
Feedback |
| Construction of Surgical Kipkelion Surgical wards |
To improve surgical capacity and patient care in Kipkelion. |
Health Services |
Completed
|
980,000.00 |
Kipkelion |
Feedback |
| Construction of Kipchimchim- Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,507,786.00 |
Kipchimchim |
Feedback |
| Completion of staff house at Kapkwen Dispensary |
To improve health worker welfare through adequate housing. |
Health Services |
Completed
|
1,041,000.00 |
Kipkelion |
Feedback |
| Construction Of Kapsaino-Chebitet Road, Kapshifta-Chebitet Road, Kapchamgei-Koibarak Road, Chilichila-Koibarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,277,574.20 |
Chepseon |
Feedback |
| Construction of Kimologit Dispensary |
To provide primary healthcare access to underserved areas. |
Health Services |
Completed
|
1,465,692.00 |
Kipkelion |
Feedback |
| Construction of Toilets at Kalyet Dispensary |
To improve sanitation for patients and staff. |
Health Services |
Completed
|
1,503,401.00 |
Kipkelion |
Feedback |
| Proposed Completion of OPD at Kimologit Dispensary |
To enhance patient flow and service delivery through OPD completion. |
Health Services |
Completed
|
3,994,220.00 |
Kipkelion |
Feedback |
| Proposed Construction and completion of two doors pit latrine at Kalyet Dispensary |
To improve sanitation and hygiene for facility users. |
Health Services |
Completed
|
1,364,160.50 |
Kipkelion |
Feedback |
| Construction of Centre Juu Quarry- AGC- Kap Stephano- Kaptebe- Ngeno- Borchole Road 4.5Km, Bartera Pry Sch-Centre Juu Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,961,208.00 |
Kamasian |
Feedback |
| Kaminjeiwa |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,099,400.00 |
Tebesonik |
Feedback |
| Construction of a pit latrine at Kusumek ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,896,440.00 |
Chemosot |
Feedback |
| Construction of a pit latrine at Kamenjo ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,598,436.00 |
Tebesonik |
Feedback |
| Construction of a 3 door pit latrine at Kaptirbet ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,097,537.60 |
Kapkatet |
Feedback |
| Construction of a classroom at Kimugul ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,495,710.85 |
Kapkatet |
Feedback |
| Construction of a classroom at Chebagal ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,491,520.00 |
Litein |
Feedback |
| Construction of a classroom at Nyambolosa ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,499,752.48 |
Litein |
Feedback |
| Construction of pit latrine at Kelunet ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,097,880.00 |
Tebesonik |
Feedback |
| Kiboito |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,676,770.00 |
Kapsuser |
Feedback |