| Sitotwet Dispensary |
To increase access to primary healthcare services for Sitotwet community by establishing a new dispensary. |
Health Services |
Completed
|
2,773,550.00 |
Kapsoit |
Feedback |
| Torsogeek Dispensary |
To enhance service delivery by completing the outpatient block for improved patient flow and healthcare access. |
Health Services |
Completed
|
5,992,860.00 |
Kapsoit |
Feedback |
| Torsogeek Dispensary |
To improve sanitation facilities and enhance drug management through construction of toilets and pharmacy shelving. |
Health Services |
Completed
|
3,900,800.00 |
Kapsoit |
Feedback |
| Kericho County Referral hospital |
To improve storage organization, security, and client comfort at the County Drug Store. |
Health Services |
Completed
|
3,499,700.00 |
Kipchebor |
Feedback |
| Kericho County Referral hospital |
To enhance security and safety of public health and blood bank premises. |
Health Services |
Completed
|
1,503,600.00 |
Kipchebor |
Feedback |
| Kericho County Referral hospital |
To provide adequate and safe electrical connections for the new Comprehensive Care Centre (CCC) block. |
Health Services |
Completed
|
3,699,635.00 |
Kipchebor |
Feedback |
| Kericho County Referral hospital |
To enhance functionality and usability of the CCC block through interior finishing works. |
Health Services |
Completed
|
2,023,540.00 |
Kipchebor |
Feedback |
| Kericho County Referral hospital |
To enhance functionality and usability of the CCC block through interior finishing works. |
Health Services |
Completed
|
1,060,000.00 |
Kipchebor |
Feedback |
| Chesanga Dispensary |
To improve stormwater management and environmental hygiene through proper drainage installation. |
Health Services |
Completed
|
2,421,720.00 |
Kipchebor |
Feedback |
| Kimungen Dispensary |
To improve the physical environment and accessibility of Kimungen Dispensary through landscaping works. |
Health Services |
Completed
|
1,775,200.00 |
Kipchebor |
Feedback |
| Kericho County Referral hospital |
To finalize construction and operationalize the comprehensive care clinic and administration block. |
Health Services |
Completed
|
1,113,000.00 |
Kipchebor |
Feedback |
| Kimungen Dispensary |
To improve sanitation standards by providing adequate toilet facilities for patients. |
Health Services |
Completed
|
1,272,000.00 |
Kipchebor |
Feedback |
| Chesanga Dispensary |
To enhance security and protect health infrastructure by constructing a perimeter wall |
Health Services |
Completed
|
2,003,400.00 |
Kipchebor |
Feedback |
| Kericho County Referral hospital |
To strengthen infection prevention and control by converting an existing ward into a dedicated isolation unit. |
Health Services |
Completed
|
5,319,600.00 |
Kipchebor |
Feedback |
| County Referral Hospital |
To improve testing and sample handling capacity through construction of a designated COVID-19 sample collection area. |
Health Services |
Completed
|
2,353,600.00 |
Kipchebor |
Feedback |
| Proposed water tank base and water collection at Kiletien Dispensary |
To provide a reliable water harvesting and supply system. |
Health Services |
Completed
|
1,918,600.00 |
Chepseon |
Feedback |
| Facelift to Londiani Hospital |
To modernize the hospital environment and improve patient experience. |
Health Services |
Completed
|
2,224,800.00 |
Kedowa/Kimugul |
Feedback |
| Extension of laboratory blocks at Kapkatet and Londiani County Hospitals |
To strengthen diagnostic capacity by expanding laboratory facilities. |
Health Services |
Completed
|
2,764,850.00 |
Kedowa/Kimugul |
Feedback |
| Proposed construction of laboratory at Londiani Hospital |
To enhance diagnostic and testing services through new lab construction. |
Health Services |
Completed
|
3,954,800.00 |
Kedowa/Kimugul |
Feedback |
| Proposed construction of medical store at Londiani Hospital |
To improve medical storage and logistics efficiency. |
Health Services |
Completed
|
2,003,400.00 |
Kedowa/Kimugul |
Feedback |
| Construction of laboratory at Kedowa Health Center |
To improve laboratory capacity for patient testing and diagnostics. |
Health Services |
Completed
|
8,070,480.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Testai Dispensary |
To expand primary healthcare coverage through new dispensary construction. |
Health Services |
Completed
|
2,843,800.00 |
Kedowa/Kimugul |
Feedback |
| Proposed Completion of OPD/shelving of pharmacy and Construction of Four Door Toilets at Testai Dispensary |
To improve patient access and sanitation facilities within the dispensary. |
Health Services |
Completed
|
553,600.00 |
Kedowa/Kimugul |
Feedback |
| Proposed completion of medical drug store at Londiani Sub County Hospital |
To strengthen drug management and supply chain efficiency. |
Health Services |
Completed
|
1,176,400.00 |
Kedowa/Kimugul |
Feedback |
| Construction of OPD at Setek Hills Dispensary |
To improve healthcare access through the construction of a new OPD block. |
Health Services |
Completed
|
2,646,300.00 |
Londiani |
Feedback |
| construction of united Dispensary |
To expand access to healthcare services by constructing a new dispensary. |
Health Services |
Completed
|
1,425,700.00 |
Londiani |
Feedback |
| Proposed Completion of OPD /Shelving of pharmacy and Construction of Four Door Toilets for Patients at United Dispensary |
To enhance outpatient services, pharmaceutical storage, and patient sanitation facilities. |
Health Services |
Completed
|
2,120,000.00 |
Londiani |
Feedback |
| Proposed Completion OPD at Setek Hills Dispensary |
To improve patient flow and operational capacity through OPD completion. |
Health Services |
Completed
|
2,350,560.00 |
Londiani |
Feedback |
| Proposed completion of Laboratory at Londiani Sub County Hospital |
To strengthen diagnostic capacity by completing the laboratory block. |
Health Services |
Completed
|
1,590,000.00 |
Londiani |
Feedback |
| Proposed construction of two doors at Kimaut Dispensary |
To improve sanitation for patients and staff. |
Health Services |
Completed
|
2,573,680.00 |
Londiani |
Feedback |
| Proposed completion of OPD, fencing and gate at United Dispensary |
To enhance service delivery and security through OPD completion and perimeter fencing. |
Health Services |
Completed
|
807,910.00 |
Londiani |
Feedback |
| Proposed construction of 4 door pit latrine at Masaita Dispensary |
To improve sanitation and hygiene within the health facility. |
Health Services |
Completed
|
2,583,200.00 |
Tendeno/Sorget |
Feedback |
| Proposed construction of Kitchen at Kamwingi Dispensary |
To improve nutrition and patient meal preparation capacity. |
Health Services |
Completed
|
4,273,920.00 |
Tendeno/Sorget |
Feedback |
| Proposed completion of Mugumoini Dispensary |
To finalize construction and operationalize the dispensary. |
Health Services |
Completed
|
1,001,700.00 |
Tendeno/Sorget |
Feedback |
| Renovation of Masaita Dispensary |
To restore and modernize the dispensary for improved service delivery. |
Health Services |
Completed
|
4,161,555.00 |
Tendeno/Sorget |
Feedback |
| Proposed Completion of Staff house at Subukia Dispensary |
To improve staff accommodation and retention. |
Health Services |
Completed
|
986,860.00 |
Tendeno/Sorget |
Feedback |
| Renovation /completion of maternity block at Kamwingi Dispensary |
To enhance maternal and newborn health services. |
Health Services |
Completed
|
5,854,097.00 |
Tendeno/Sorget |
Feedback |
| Construction of generator house at Fort Ternan Hospital. |
To provide secure housing for power backup systems. |
Health Services |
Completed
|
4,999,650.00 |
Chilchila |
Feedback |
| Construction of Kipsinende Dispensary |
To expand access to healthcare services. |
Health Services |
Completed
|
2,502,800.00 |
Chilchila |
Feedback |
| Kipsegi Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,715,070.00 |
Kamasian |
Feedback |
| Lelu Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
560,000.00 |
Kamasian |
Feedback |
| Borowet Water Project |
To enhance water distribution efficiency and expand access through the Supply, Delivery, Excavation, and Laying of a Distribution Pipeline. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,599,900.00 |
Kamasian |
Feedback |
| Centa Juu Borehole Water Project |
To establish a sustainable and secure water supply system through the Supply and Delivery of Drilling Materials, Installation and Solarization of a Submersible Pump, Construction of a 50 m Masonry Tank, Rising Pipeline, Distribution Pipeline, and Fencing of the Borehole and Tank Area. |
Water, Environment, Energy and Natural Resources |
Completed
|
1,001,700.00 |
Kamasian |
Feedback |
| Kipsegi Borehole Water Project |
To establish a sustainable and secure water supply system through the Installation of a Solar System, Equipping of Borehole, Construction of a Control House, Rising Main, Elevated Storage Tank, Distribution Pipeline, Communal Water Points, and Fencing of the Solar Structure Area. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,904,400.00 |
Kamasian |
Feedback |
| Kipkelion Water Supply |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
3,285,585.00 |
Kipkelion |
Feedback |
| Kipkelion Pipeline Extension |
To enhance water distribution infrastructure by ensuring the supply and delivery of pipes and fittings for the following water projects:Kapkia Water Project,Jambo Kenya Siret Water Project,Maji Mazuri Water Project,Soil Conservation Line,Cherotuk Line,Kalyet Borehole Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
4,883,150.00 |
Kipkelion |
Feedback |
| Lelechwet Water Peroject |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
5,513,900.00 |
Kipkelion |
Feedback |
| Maji Mazuri Pan |
Protect and sustain the water source (spring),Expand and improve water distribution to the community,Promote public health and environmental hygiene |
Water, Environment, Energy and Natural Resources |
Completed
|
2,731,400.00 |
Kipkelion |
Feedback |
| Ngendalel Borehole Water Project |
To enhance water extraction and distribution efficiency through the Supply, Delivery, Installation, and Commissioning of a Multi-Stage Centrifugal Borehole Pump and Pipework. |
Water, Environment, Energy and Natural Resources |
Completed
|
4,598,010.00 |
Kipkelion |
Feedback |
| Siret Pipeline |
to improve water conveyance efficiency and reliability through the design, and construction of a Rising Main for enhanced water supply to storage tanks or distribution points. |
Water, Environment, Energy and Natural Resources |
Completed
|
2,237,290.00 |
Kipkelion |
Feedback |
| Kalyet Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
3,800,856.00 |
Kipkelion |
Feedback |
| Masibun Water Project |
To establish a sustainable and secure water supply system through the Installation of a Solar System, Equipping of Borehole, Construction of a Control House, Rising Main, Elevated Storage Tank, Distribution Pipeline, Communal Water Points, and Fencing of the Solar Structure Area. |
Water, Environment, Energy and Natural Resources |
Completed
|
3,988,767.30 |
Kipkelion |
Feedback |
| Simchorwet Water Project |
To enhance access to clean and sustainable water supply by constructing pipelines, , and associated fittings, ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
7,251,100.00 |
Kipkelion |
Feedback |
| Chesonoi Water Project |
to enhance access to safe and reliable water for the target community through the construction, rehabilitation, and installation of critical water supply infrastructure,to improve water conveyance and storage by constructing a gravity main pipeline and a 100m³ ground-level masonry storage tank |
Water, Environment, Energy and Natural Resources |
Completed
|
2,277,400.00 |
Kunyak |
Feedback |
| Tendwet water Project |
to enhance access to safe and reliable water for the target community through the construction, rehabilitation, and installation of critical water supply infrastructure,to improve water conveyance and storage by constructing a gravity main pipeline and a 101m³ ground-level masonry storage tank |
Water, Environment, Energy and Natural Resources |
Completed
|
4,536,000.00 |
Kunyak |
Feedback |
| Timbilil Water Project |
To enhance access to safe and reliable water supply for the community by upgrading the existing water infrastructure, including the replacement of the gravity main, construction of a new distribution pipeline, and installation of water storage facilities, with a specific focus on improving service delivery to key institutions such as the local dispensary |
Water, Environment, Energy and Natural Resources |
Completed
|
1,441,600.00 |
Kunyak |
Feedback |
| Timbilil Phase II |
To strengthen the community's water supply infrastructure through the construction of supportive tank platforms and valve chambers, and the installation of plastic water storage tanks and distribution pipework, ensuring reliable water access for domestic and institutional use |
Water, Environment, Energy and Natural Resources |
Completed
|
3,010,400.00 |
Kunyak |
Feedback |
| Chepngosos Borehole Water Project |
To procure and deliver high-quality drilling materials that meet the technical and operational requirements of the project. |
Water, Environment, Energy and Natural Resources |
Completed
|
902,195.00 |
Kunyak |
Feedback |
| Kichawir Water Project |
To improve access to safe, sustainable, and reliable water supply for the community through the protection and development of a spring source, construction of essential water infrastructure, and installation of adequate storage and distribution systems |
Water, Environment, Energy and Natural Resources |
Completed
|
1,533,200.00 |
Kunyak |
Feedback |
| Manyatta Water Project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
6,013,800.00 |
Kunyak |
Feedback |
| Chepkemel primary water project |
To expand and improve the existing water supply system through the extension of the distribution pipeline and rehabilitation of existing storage infrastructure, ensuring increased water access and reliability for the target population |
Water, Environment, Energy and Natural Resources |
Completed
|
2,713,500.00 |
Kaplelartet |
Feedback |
| Kameme water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
3,635,450.00 |
Kaplelartet |
Feedback |
| Kwa Benjamin water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
4,309,500.00 |
Kaplelartet |
Feedback |
| Tabaita water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
4,199,852.00 |
Kaplelartet |
Feedback |
| Upper Kautet Spring Protection |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
2,276,680.00 |
Kaplelartet |
Feedback |
| Sigowet Water Project |
To enhance the reliability, safety, and sustainability of the community water supply system by upgrading key infrastructure components, protecting the water source, and ensuring efficient water distribution to end-users |
Water, Environment, Energy and Natural Resources |
Completed
|
3,498,000.00 |
Kaplelartet |
Feedback |
| Chepoptaa water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
6,191,460.00 |
Kaplelartet |
Feedback |
| Kamaget water project |
To develop and protect a sustainable water source for both human and livestock use by implementing spring/intake development, constructing essential water collection and delivery infrastructure, and promoting environmental conservation through fencing and tree planting |
Water, Environment, Energy and Natural Resources |
Completed
|
3,964,450.00 |
Kaplelartet |
Feedback |
| Ketigoi Water project |
To improve access to clean and reliable water for the target population by extending the water distribution network and rehabilitating existing water storage infrastructure |
Water, Environment, Energy and Natural Resources |
Completed
|
5,169,820.00 |
Kaplelartet |
Feedback |
| Sasuriet Water Project |
To enhance access to clean and sustainable water supply by constructing spring protection pipelines, water tanks & associated fittings ensuring reliable water delivery to the target community |
Water, Environment, Energy and Natural Resources |
Completed
|
6,549,900.00 |
Ainamoi |
Feedback |
| Itibet - Bagao- Deliverance Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
10,338,300.00 |
Ainamoi |
Feedback |
| Kiburet- Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,205,220.00 |
Ainamoi |
Feedback |
| Kap Zakayo- Ainamoi Polythecnic Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,307,200.00 |
Ainamoi |
Feedback |
| Nyinyitiet- Chemorir Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Ainamoi |
Feedback |
| Kiburet- Nyinyitiet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
420,000.00 |
Ainamoi |
Feedback |
| Duka Moja- Kiparao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,409,180.00 |
Kapkugerwet |
Feedback |
| Sumeiyon- Chelogoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,038,000.00 |
Kapkugerwet |
Feedback |
| Kapriwet- Arap Nyige |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,747,300.00 |
Kapsaos |
Feedback |
| Manyoror Sign Post- Manyoror Sec- Off Kapsaos Ainamoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,316,250.00 |
Kapsaos |
Feedback |
| Torochgaa- Koigaron- Tegunot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,393,784.00 |
Kapsaos |
Feedback |
| Kosisit Primary- Kap Abinwas- Arap Rugut |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,300,452.00 |
Kapsoit |
Feedback |
| Off B1- Chepsoo Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,890,404.00 |
Kapsoit |
Feedback |
| Cherire - Kisabei Pry- Kiptegan Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,880,704.00 |
Kapsoit |
Feedback |
| Kap Eli - Off B1 - Koiyet - Chesanga -Hass Petrol Station- Emanuels Agc Chucrh- Kiboko- Off B1 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,411,600.00 |
Kipchebor |
Feedback |
| Satelite - Matobo Primary-Nyagacho - Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
911,900.00 |
Kipchebor |
Feedback |
| Baraka Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
566,575.00 |
Kipchimchim |
Feedback |
| Taiwet - Kipsutet Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
140,000.00 |
Kipchimchim |
Feedback |
| Kap Joseah- Kipsakwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,021,000.00 |
Kipchimchim |
Feedback |
| Kapango- Simotwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
632,000.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Kapsegut- Jerusalem Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,645,020.00 |
Cheboin |
Feedback |
| Routine Maintenance of Ngororga 08 tbc- cheptigit- Sahangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,671,200.00 |
Cheboin |
Feedback |
| Routine Maintenance of Maburo- Malinja- Bakoiyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Cheboin |
Feedback |
| Routine Maintenance of Off C23- ChemosIt- Chebarema- Kabitungu TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,607,424.00 |
Chemosot |
Feedback |
| Routine Maintenance of Off C23- Chemosot Centre- Arap Irongi- Chebulu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,920,000.00 |
Chemosot |
Feedback |
| Routine Maintenance of Off C23- Kaminjeiwet- Chebulu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,279,000.00 |
Chemosot |
Feedback |
| Routine Maintenance of Nairobi Ndogo- Kimauto Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
910,000.00 |
Cheplanget |
Feedback |
| Routine Maintenance of Tabaita- Kap Johna Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,598,400.00 |
Cheplanget |
Feedback |
| Routine Maintenance of Twoliot- Church Of Christ- Tangit- Sebetet- Ainapkarik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,800,000.00 |
Cheplanget |
Feedback |
| Routine Maintenance of Nuru- Meturi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
865,000.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Chebitet- Kap Tebengwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,183,180.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Chebitet Sign Post- Sachangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,650,000.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Sachangwan- Mabasi TBC- Ketingoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,987,000.00 |
Kisiara |
Feedback |
| Routine Maintenance of Keregut- Sikongo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,964,800.00 |
Kisiara |
Feedback |
| Routine Maintenance of Machorwa- Chomisian- Charera |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,730,000.00 |
Kisiara |
Feedback |
| Routine Maintenance of Kelelwa- Kimugul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,672,480.00 |
Kisiara |
Feedback |
| Routine Maintenance of Reresik Pry- Kiprichait- Roret Boys- Chebululu- Tulwet- Ngainet Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,608,880.00 |
Kisiara |
Feedback |
| Routine Maintenance of America- Sinendet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,151,160.00 |
Litein |
Feedback |
| Routine Maintenance of Bushmouth- Samuget- Kap Brown - TTC Valley Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,646,520.00 |
Litein |
Feedback |
| Routine Maintenance of Kapkarin- Chesoen TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,503,600.00 |
Litein |
Feedback |
| Routine Maintenance of Ainapset AIC- Kapbomwo- Rungut Pry- Chepsembe- Tendwet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,704,050.00 |
Litein |
Feedback |
| Routine Maintenance of Chepkitach- Kipsagetet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,279,860.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Kibaranji- Karapngerer Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,434,628.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Kibolgong-Tiritab Eito Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,326,050.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Silva Junction- Siongi- Kampala Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,697,305.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Chebirirbei Centre- Chepnagai Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,603,520.00 |
Kabianga |
Feedback |
| Routine Maintenance of Kapsisiywa Pry- Kipseger TBC- Sinonin Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,359,540.00 |
Kabianga |
Feedback |
| Routine Maintenance of Mobego B TBC- Nyabangi Sec. School- Kolonget Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,951,040.00 |
Kabianga |
Feedback |
| Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,503,600.00 |
Kabianga |
Feedback |
| Routine Maintenance of Bot Musa- Cheboin- Kimolwet- SBI- Kugerwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,882,712.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Cheptororiet- Arap Tanui Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,167,040.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Kamungwana- Bae-kaplemeywet- Kapnandet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,037,140.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Changoi Road- Boito- Kapburkei- Mlimani Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,251,970.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Cheswerta AGC- Chepkutbei Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,149,890.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Kipsolu pry- Soweto TBC- Michingilwet- Cherigat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,551,740.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Kosachmwai- Chemoset Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,098,550.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Cheptenye Sign post- Off Sosiot- Keben Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,801,748.00 |
Waldai |
Feedback |
| Routine Maintenance of Mark Peter- Off Kabianga- Chemumbe- Kaborok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
11,192,013.00 |
Waldai |
Feedback |
| Routine Maintenance of Off Cheribo- Ngariet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
350,000.00 |
Waldai |
Feedback |
| Routine Maintenance of Off D314- Mutanya Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,794,100.00 |
Chepseon |
Feedback |
| Routine Maintenance of 938 - Central Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,420,780.00 |
Chepseon |
Feedback |
| Routine Maintenance of Kipyobob Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,214,000.00 |
Chepseon |
Feedback |
| Routine Maintenance of Chesinende Catholic- Koibarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,596,712.00 |
Chepseon |
Feedback |
| Routine Maintenance of D314- 938 Girls Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Chepseon |
Feedback |
| Routine Maintenance of Off B1- Ewat Kap Maxwel - Catholic- Kiplekwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,438,000.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Off C35- Ndiwa Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,194,000.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Slaughter House- Towet Bridge- Maridany Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,422,100.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Kapkondoo Centre- Silibwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
717,950.00 |
Londiani |
Feedback |
| Routine Maintenance of Kapcheplanga Centre- Martina Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,114,000.00 |
Londiani |
Feedback |
| Routine Maintenance of Elite Primary School- Chebangang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,288,730.00 |
Londiani |
Feedback |
| Routine Maintenance of Sachangwan- Kap Tilia Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,883,590.00 |
Londiani |
Feedback |
| Routine Maintenance of Barotion- Sawmill- Lelsotet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,724,750.00 |
Londiani |
Feedback |
| Routine Maintenance of Burutu- Kamiwa- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,210,500.00 |
Chilchila |
Feedback |
| Routine Maintenance of Factory Junction- Kamiwa- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,642,380.00 |
Chilchila |
Feedback |
| Routine Maintenance of Tunnel- Chumbeek Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,783,630.00 |
Chilchila |
Feedback |
| Routine Maintenance of Mutai- Lelei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,314,020.00 |
Kamasian |
Feedback |
| Routine Maintenance of Nyairobi- Songonyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,627,540.00 |
Kamasian |
Feedback |
| Routine Maintenance of Murau Centre- Bakery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,101,700.00 |
Kamasian |
Feedback |
| Routine Maintenance of Off C35- Segetet- Murau Brige Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,180,000.00 |
Kipkelion |
Feedback |
| Routine Maintenance of Kamore- Kap Sephania Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,268,400.00 |
Kipkelion |
Feedback |
| Routine Maintenance of Kap Onyango-Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,423,800.00 |
Kunyak |
Feedback |
| Routine Maintenance of Sachangwan- Mariwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,211,800.00 |
Kunyak |
Feedback |
| Routine Maintenance of Chesino- Kapkormom- Koiyabei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,420,720.00 |
Soin |
Feedback |
| Routine Maintenance of Kipsitet Cattle Dip- Asenwet-Kap Musar Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,749,000.00 |
Soin |
Feedback |
| Routine Maintenance of Chemaluk- Gladys Canteen- Bokwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,352,400.00 |
Soin |
Feedback |
| Routine Maintenance of Soliat Corner – Kaplengeny – Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,363,060.00 |
Soliat |
Feedback |
| Routine Maintenance of R47- Chebaran Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,949,360.00 |
Soliat |
Feedback |
| Routine Maintenance of Cheramor Centre- Kipkerer Bridge- Arap Bore Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
735,000.00 |
Soliat |
Feedback |
| Routine Maintenance of Tarajet- Baregeiwet Dispeensary- Karap Maina- Mungenik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
667,800.00 |
Soliat |
Feedback |
| Routine Maintenance of Salgaa- Kongeren River- Kap Laiba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,360,800.00 |
Soliat |
Feedback |
| Routine Maintenance of Kakibei- Kapchemirmir- Mutata- Chepkochun Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,216,900.00 |
Sigowet |
Feedback |
| Routine Maintenance of Sisionik- Tumoyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,600,412.00 |
Sigowet |
Feedback |
| Routine Maintenance of ML 10- Chebetet- Kalyongwet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,503,850.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Mutwot - Emdit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,190,012.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kaplelartet Chief’s Office- Tabaita Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,166,000.00 |
Kaplelartet |
Feedback |
| Construction of Kerego Box Culvert at Kwa Silvan- Kids home - Kerego |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,082,900.00 |
Kapkugerwet |
Feedback |
| Construction of Ainapkosobin 3X900mm cross culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,441,600.00 |
Kapkugerwet |
Feedback |
| Construction of Twin 900mm cross culvert at Wema - Chemugusu Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,179,800.00 |
Kapkugerwet |
Feedback |
| Construction of Torsogek Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,794,800.00 |
Kapsoit |
Feedback |
| Construction of Jordan Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,816,604.00 |
Kapsoit |
Feedback |
| Construction of Mjini Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,609,944.00 |
Kipchebor |
Feedback |
| Construction of Gokul- Kamelilo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,264,692.00 |
Ainamoi |
Feedback |
| Installation of 10 lines of 600mm along Arap Cheruiyot- Maberiat AGC Church Road, Budalangi-Totlilet- Mureret Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,015,000.00 |
Ainamoi |
Feedback |
| Construction of Koigaron Twin 900mm cross culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,251,860.00 |
Kapsaos |
Feedback |
| Construction of Buchenge Deck for Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,696,800.00 |
Kapsaos |
Feedback |
| Construction of Kisabei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,124,500.00 |
Kapsoit |
Feedback |
| Construction of Sugutek Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
391,680.00 |
Kapsoit |
Feedback |
| Construction of Kapsinei Mini Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,120,000.00 |
Kapsoit |
Feedback |
| Construction of Kapsakwa Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,028,000.00 |
Kipchimchim |
Feedback |
| Construction of Kimugen Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,360,000.00 |
Kipchebor |
Feedback |
| Construction of 600mm cross culvert to Kaborus - Chabasta road 2km |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,006,800.00 |
Cheboin |
Feedback |
| Construction of 600mm cross culvert to Koitamat - Cheptenteniet road 3km |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,900,000.00 |
Cheboin |
Feedback |
| Construction of Machorwa- Kapcheluch Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,256,960.00 |
Kisiara |
Feedback |
| Construction of Senetwet Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
8,492,300.00 |
Cheplanget |
Feedback |
| Construction of Kisiara -Kap nyongo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,300,900.00 |
Chemosot |
Feedback |
| Construction of Kaptebengwet - Cheptangulgei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,347,060.00 |
Kapkatet |
Feedback |
| Construction of Chematich-Kaptirbet Twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Kapkatet |
Feedback |
| Construction of Kabusienduk Twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,197,600.00 |
Tebesonik |
Feedback |
| Construction of Chesebet Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,308,360.00 |
Kabianga |
Feedback |
| Construction of Nyabangi Road Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,216,040.00 |
Kabianga |
Feedback |
| Construction of twin 900mm cross Culvert at Arap Kitur - Arap Serem Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,701,830.00 |
Kapsuser |
Feedback |
| Construction of Twin 900mm cross Culvert at Cheboin river |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,503,150.00 |
Kapsuser |
Feedback |
| Construction of Twin 900mm cross Culvert at Arap Samityuk - Kap Christopher Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,226,000.00 |
Kapsuser |
Feedback |
| Construction of Chepkutbei Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,249,000.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kipkeremwo twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
5,992,400.00 |
Chepseon |
Feedback |
| Construction of twin 900mm cross culvert at 938 dip Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,428,720.00 |
Chepseon |
Feedback |
| Construction of Silibonik-Kiplekwa Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
10,526,200.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Off B1 - Lembel Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
7,120,904.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Cross Culverts to Chebitet- Kipyemit Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,590,000.00 |
Kedowa/Kimugul |
Feedback |
| Construction of precast culvertsat Nairobi - Saramek Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,969,330.00 |
Londiani |
Feedback |
| Construction of precast culvert to Chelalang - Kondamet Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,731,680.00 |
Londiani |
Feedback |
| Construction of precast culverts to Kafinch - Sotik Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,204,800.00 |
Londiani |
Feedback |
| Construction of Lelsotet Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,632,400.00 |
Londiani |
Feedback |
| Construction of Koisagat - Chilchila Boundary Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,460,060.00 |
Chilchila |
Feedback |
| Construction of Segetet - Kitobe Twin twin 900mm cross Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,325,250.00 |
Kipkelion |
Feedback |
| Construction of Mogire Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
7,624,000.00 |
Chilchila |
Feedback |
| Construction of Soi Mingin - Blue Hills Cattle Dip Twin 900mm Cross Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,791,300.00 |
Kipkelion |
Feedback |
| Construction of Minihaha Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
743,900.00 |
Kunyak |
Feedback |
| Construction of Nunda Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,158,400.00 |
Soin |
Feedback |
| Construction of Kapaiwo twin 900mm Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,595,000.00 |
Soliat |
Feedback |
| Construction of Kongeren twin 900mm Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,164,640.00 |
Soliat |
Feedback |
| Construction of Sombicho Twin 900mm Culverts Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
5,117,200.00 |
Soliat |
Feedback |
| Construction of Orgony Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
8,391,800.00 |
Sigowet |
Feedback |
| Construction of Sime Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,608,900.00 |
Kaplelartet |
Feedback |
| Construction of School of Excellence Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,650,000.00 |
Kaplelartet |
Feedback |
| Budalangi-Bechulelach-Kipchorian rd; Kaptongilo-Cheplit rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,158,400.00 |
Ainamoi |
Feedback |
| Kiburet-Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,988,720.00 |
Ainamoi |
Feedback |
| Ketpyse rd;Kamelilo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
224,774,768.60 |
Ainamoi |
Feedback |
| Ainamoi Polytechnic - Kapsengerini rd (2Km); Ainamoi Sub County Hospital (0.5Km); Kapjonah - Bagao rd (5Km); Ainamoi bridge – Maseriat AGC Rd (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
15,363,827.10 |
Ainamoi |
Feedback |
| Ainamoi Shopping centre- Ainamoi pry- Itibet road; Senetwet - Arap Cheruiyot - Maberiat FGC rd; Kamelilo coffee factory - Kamelilo pry - Arap Ngeny rd; Kamelilo pry - Koisirat rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
46,884,040.00 |
Ainamoi |
Feedback |
| Lelechwet - Mureret rd; Ainamoi town |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,941,017.66 |
Ainamoi |
Feedback |
| Ainamoi Market - Ainamoi pry - Itibet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
25,984,788.64 |
Ainamoi |
Feedback |
| Senetwet - Arap Cheruiyot - Maberiat FGK rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
242,660.00 |
Ainamoi |
Feedback |
| Kakobirit - Karapbii rd; Kapkeregu - Budalangi - Kapcosmas - Sitini rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,153,168.00 |
Ainamoi |
Feedback |
| Lelechwet - Arap cheboiyon rd; Kaptongilo - Kapchepngok rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,058,746.00 |
Ainamoi |
Feedback |
| Kamelilo factory - Karapngeny rd; Kamelilo pry sch - Kapseremiot river rd; Kapkenat - Kapboniface Kilii rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,914,380.00 |
Ainamoi |
Feedback |
| Ainamoi Centre rd/Bagao |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,444,376.00 |
Ainamoi |
Feedback |
| Keongo Pry School ground leveling |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,402,200.00 |
Kapkugerwet |
Feedback |
| Keongo-Kapsigong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,950,340.00 |
Kapkugerwet |
Feedback |
| Chemugusu rd; Laibon Town rds; Keongo - Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,309,772.00 |
Kapkugerwet |
Feedback |
| Roads at Kapkurgwet ward |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,019,544.00 |
Kapkugerwet |
Feedback |
| Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,231,788.00 |
Kapkugerwet |
Feedback |
| Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km); Keongo FGCK - Kapturungi rd (2km; Masengo - Laibon rd (2km); Kondamet - Agc - Ngororoga rd (2km); Nukiat - Catholic - Keongo rd (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,892.00 |
Kapkugerwet |
Feedback |
| Keongo - Quentete - Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
712,320.00 |
Kapkugerwet |
Feedback |
| Chemugusu - Satelite rd; Tea point - Paksonrd; Eland Academy - Majengo - St. Patrick rd; Site and Service- Kericho Academy - Talai rd; Tea Hotel - Kimugu Treatment works rd; Quintete - Talai rd; Off B1 - Duka Moja Junction rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,664,200.00 |
Kapkugerwet |
Feedback |
| Kapsilangwa-Ainapsosiot rd;Kapoldoit-Kaprewet rd;Chesumot rd;Binyiny rd ;Mureret rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
600,600.00 |
Kapsaos |
Feedback |
| Kipsigori - Kapsaos Centte rd; Off C35 - Lamaiyat pry - Torochgaa brdige rd; Kapngetuny rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,017,604.00 |
Kapsaos |
Feedback |
| Tabet-Koigaron-Mureret-Kipsigori-Kamuungei road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,293,900.00 |
Kapsaos |
Feedback |
| Kapsoit-Kaboswa- Kimasian-Kiboibei-Slaughter hse road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,135,256.00 |
Kapsoit |
Feedback |
| mongo- Chepkut rd; Kenegut-Chepkel TBC-Chesire rd; Kenegut MKT-Kisabei Pry-Kiptegan Nursery rd; Kapsoit- Kaboswa-Kimasian-Kiboibei-Slaughter rd; Off b1-Ngecherok AGC-Chepkurbet Pry road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,483,160.00 |
Kapsoit |
Feedback |
| Off B1-Chemobei rd;Off B1-Chepkurbet AGC;Off B1-Ngecherok AGC rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,201,828.00 |
Kapsoit |
Feedback |
| off E222-Kaptoroi-Kiptenden rd;Muiwek-Tuiyobei rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,034,020.00 |
Kapsoit |
Feedback |
| Kara Tegerei - Gabel rd; Tilrap Malit - Kirongisyet rd; John Bett - Kirongisyet rd; Kaptimothy - Chelule rd; Chemoibei pry - Koitabai rd; Arap Kenei - Kiptendon Rd; Kiptendon - Lemeiywet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,742,792.00 |
Kapsoit |
Feedback |
| Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
207,600.00 |
Kapsoit |
Feedback |
| Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,890,916.00 |
Kapsoit |
Feedback |
| Kichinjet - Kaboswa rd; Karap Tergei - Chepsoo rd; Kamundu rd; Samutet pry - Chemobei rd; Samutet - Kappeter rd; Karap Teregei rd; Tiles - Karap Barjwot rd; Toro - Kameshak rd; Sitotwet - Kirongishet rd; Koitabai rd; Karap Tererei - Gable rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,320,760.00 |
Kapsoit |
Feedback |
| Sailo-Chepcholiet Road; Chesumei-Tugunon Road; Sebere-Chesumei Road; Kapsegut- Nyambuko Road; Cherendet-Kiptenden Road. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,048,400.00 |
Chepseon |
Feedback |
| Mandera-Kipketes Road; Chepcholiet-Tugunon Road; Leberer-Mile Tano; Kamachungwa-Factory Road; Momoniat-Chepchabai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,236,820.00 |
Chepseon |
Feedback |
| Kiptenden - Kamarus Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,320,760.00 |
Chepseon |
Feedback |
| Kaptenet - Chebwareng - Kipchorian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,433,480.00 |
Chepseon |
Feedback |
| Kaptenet - Fredrick Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,761,840.00 |
Chepseon |
Feedback |
| Kapsokwe - De;iverance - Kipyoptop Road; Kaptenet - Fredrick - Scheme Road; Kapeli - Tilito - Kaisugu Road; Kapfredrick - Ketienya - Chebochok Road; Kapketungor - Maseti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,758,660.00 |
Chepseon |
Feedback |
| Off B1 Wima Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,924,540.00 |
Chepseon |
Feedback |
| Tenbwet - Complex Road; Kiprengwe - Miti mbali Road; Kipsigori - Kiprengwe corner Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
742,000.00 |
Chepseon |
Feedback |
| Siwot - Motanya; Cheboror;Kondamet/ Mutanya - Kapkawa Road ; C woRoad - Ka[somting - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,520,940.00 |
Chepseon |
Feedback |
| Siwot Motanya |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,434,480.00 |
Chepseon |
Feedback |
| B1-Kedowa-Ewat road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,371,330.00 |
Kedowa/Kimugul |
Feedback |
| Kedowa River farm-Kimaut-Barngoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,313,920.00 |
Kedowa/Kimugul |
Feedback |
| Ewat - Forest Road; Ndarugu - Kapchebotibiot - Timbilet Road; Kiprengwe - Miti moja - Kapmabwai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,313,920.00 |
Kedowa/Kimugul |
Feedback |
| Kipyemit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,524,060.00 |
Kedowa/Kimugul |
Feedback |
| Off B1 - Tulwap Road; Road Unit - Kolonget Road; Nyakinywa Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,702,561.00 |
Kedowa/Kimugul |
Feedback |
| Kaap Nashon - Kipkoiyo pry (3km); Off C35 - Wispers - Kiptenden Road (2.5km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,099,500.00 |
Kedowa/Kimugul |
Feedback |
| Lembel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
830,400.00 |
Londiani |
Feedback |
| Jagoror center- Kerembe road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,162,200.00 |
Londiani |
Feedback |
| Jagoror center-Cypress Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,727,576.00 |
Londiani |
Feedback |
| Off C35 - AIC 936 Academy-Lolongbei Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,000.00 |
Londiani |
Feedback |
| off C35 -Engineer Rotich-Nukiat-Link 35 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,639,820.00 |
Londiani |
Feedback |
| Kabarak ECDE - Sachangwan Road 2.8km; Off D 254 -Gishorio Road 1.5km; Kapsenda - Lolonbbei Road 1.3km; Kapchepkorio - Quarry Road0.4km; Kapsenda Dispensary - Chebaraa Road 1.7km; Satek - Langat Road 1.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,541,324.00 |
Londiani |
Feedback |
| Barotion pry - Lelsotet Road; Barotion pry - Arap Chief Road; Kaptien - Sorget Road; Miti mingi - Kwa DC - Kaptich Road; |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,913,048.00 |
Londiani |
Feedback |
| Sirako - Jerusalem Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,163,400.00 |
Londiani |
Feedback |
| Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,814,156.00 |
Londiani |
Feedback |
| Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,589,548.00 |
Londiani |
Feedback |
| Tegat - Lelsotet Road; Dr Ngeno-Roadunit |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,520,400.00 |
Londiani |
Feedback |
| Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,252,418.00 |
Tendeno/Sorget |
Feedback |
| Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,815,400.00 |
Tendeno/Sorget |
Feedback |
| Tendeno dip-Kariuki Road;Tumaini sec-Kericho boRoader-Nominated MCA Road;Kienyere Road-Ndoiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,601,180.00 |
Tendeno/Sorget |
Feedback |
| Centre one-Cheborge Road;CheborgeMarsin Road;Miti tatu-Lovito-Kolonget Road;Kongoni dispensary-Chepkok Road;Singoi-Gwitu pry Road;Ayondi-Atiokigit river Road;Chabaya-Kichagi Road;Chabaya-KiMuremi Munga Road;Leltae-Kosigu-Captain Road;Towet-Kimager Road;Cheriro-wokter-mokiolok Road; E254-kk-Mwano-Muoroto-Siangatia Road;Chege-Wamutu-Wamagi Road;Zakao-kag church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,578,400.00 |
Tendeno/Sorget |
Feedback |
| Kapsabet-Bagdad Road;Muikamba-David Mtaro Road;Emmanuel-PCA Road-Kaburi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,602,720.00 |
Tendeno/Sorget |
Feedback |
| Tendeno-SubukiaRoad;Subukia-Wambare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,807,140.00 |
Tendeno/Sorget |
Feedback |
| Miti - tatu - Benditai Road; Chebusit main road - JXN road; Chemororen - Kamau Nubery Road; Rajab - CHEMWOKTER ROAD; Chebaibai - Kapkimoi nRoad; Kimoi - Kamaua; Rajab - Busara Road; Chebaibai - Ximboiyo Road; Cheborgei - Seronei Road; Seronei - Benditai BoaRoader Road; Mikingo - Bridge Road; Maritim - Kimoi Road; Sach 4 - Barno Road; Bitok - Yegen Selim -KAcheyat Road; KAptembwo - Forest Road; Maranget - Chemwokter Road; Chebubto - Cheriro Road ; Chebaibai - Louito Road and Simboiyon Sach 4 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,999,960.00 |
Tendeno/Sorget |
Feedback |
| Kahuho Road; Tumaini Road; Kaigemi Ak foRoad Road; Wangare- MCA Road; Mukamba - mulkaroubo Road; Mahinga - Borchek Road; Subukia - Independent Road; Mburu - Dave Road; Independent - Isili - Tendeno pry Road; Nginga - Kamwingi Road; Independent church - Nginga Jxn Road; Micheal JXN- Mwangi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,175,040.00 |
Tendeno/Sorget |
Feedback |
| Construction of Kamwingi II - Kiangundo Road;Kamwingi pry - KIMARI - Singati Road; Centre 1 - Majani Road; Taarifa corner Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,575,028.00 |
Chilchila |
Feedback |
| Kaigai Road; UPC raod; Majani sawmil Awii; Amos Saiz Road; Independent church - Dam Road; Catholic main -Cherer diversion Road; Macam Milka - Koigo Road; Cheres Road; Chebangang Road; Josh dam Road; Chane rs; Upendo Road; Akimani Road; Zakayo Road; Mama Mike Road; Mrs Langat - Forest Road; Botpla Road; Mama wangari cam Daniel Road; Speaker Kipronon Road; Kwa Daniel Road; Daniel Forest Road; Centaa Roads; Kipkelion works; Barsiele Road; Mau Road; Power Road; owet Guito Road; Ngingo - highway Road; Peters - gwitu Road; Bungowma - Roisili Road; Assembly Church Bridge - Bridge cheres Road; Bridge Road; Assembly Church - bridge Road; Cheres - Bridge Road; Mama chelimo Al shabaab Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,473,400.00 |
Chilchila |
Feedback |
| Kwa Chief-Jagoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,363,196.00 |
Chilchila |
Feedback |
| Kokwet-Toroton-Kipsasur Road;Bomore-Kap Chapati Road;Kokwet Centre Road;Momugut-Kapinguron;Chemunyala-Store Road;Sachangwan-Kapchorua Road;Burutu-Kapkesee Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,847,512.00 |
Chilchila |
Feedback |
| Off Chilchila Sch.-Kapedo Road-Chepkendi Dispensary-Railway Chemunyala Factory-Nyanza Road;Chepkendi-Kapkures Road;Cherara-Kamaget-Murgut Road;Kaplelit-Kishara-Kamatos Road;Kaplelit-Tegat-Timbil Road;Yala-Teldet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,942,132.00 |
Chilchila |
Feedback |
| Ndubusat-Kaburenik Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,102,860.00 |
Chilchila |
Feedback |
| Murgut Pry Sch.- Nyanza Boundary Road (1.3km); Off E 250 - Karap Murel Road (0.6km); Koisagat - Kapchebere - Morombit Road (0.8km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,670,580.00 |
Chilchila |
Feedback |
| Morombit - Morombinyik |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,082,780.00 |
Chilchila |
Feedback |
| Tendwet - Yalla - Kipteres Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,147,363.00 |
Chilchila |
Feedback |
| Teldet Centre - Kortende - Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,426,690.00 |
Chilchila |
Feedback |
| Chepkechei - Kaplekwa - Kipteris FGIK Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,872,280.00 |
Chilchila |
Feedback |
| Chepkitar Centre - Toroton Boundary - Yalla Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,251,040.00 |
Chilchila |
Feedback |
| Toroton - Tulwapmoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,282,200.00 |
Chilchila |
Feedback |
| Chilchila Quarry(Tinderet Forest Road) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,007,926.00 |
Kamasian |
Feedback |
| Tendwet - Malinja - Magire Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,942,712.00 |
Kamasian |
Feedback |
| Misoi-Chumba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,191,360.00 |
Kamasian |
Feedback |
| Kipsongol-Kap Luso-Chemongen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,952,704.00 |
Kamasian |
Feedback |
| Kasheen-Morao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,459,964.00 |
Kamasian |
Feedback |
| Kimeto-Kaplaba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,704,032.00 |
Kamasian |
Feedback |
| Kasheen-Borowet-Murau Pry Sch. Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,241.00 |
Kamasian |
Feedback |
| Muharate-Nyairobi-Jagoror Road;Jagoror-Some Road;Jagoror-Kap Sharack Road;Makutano-Nyairobi Sec Road-Kiplaba-Kimologitbridge Road-Kap Sugurup-Greenland Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kamasian |
Feedback |
| Lelu Centre-Corner Junction Road 3.7KM;Kamtego-Monastry Road 1.2km;Of D312 -Lelu Dispensary Road 15km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,116,050.00 |
Kipkelion |
Feedback |
| Kapsugurup - Greenland - Kichagi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,450,064.00 |
Kipkelion |
Feedback |
| Siret Centre-Siret Quarry; Chemager Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,241.00 |
Kipkelion |
Feedback |
| AGC-Machilil Road; Tuiyobei- Arap Ngeno-Tilolwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kipkelion |
Feedback |
| Faith Church-Arap Moi Road;Chepkei-Chepkolon Road;Chepkiber-Kaplekwa-Kapkiyao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,069,688.00 |
Kipkelion |
Feedback |
| Quarry -Fuko Coffee Society Road; Quarry - KitobenRoad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,242,810.00 |
Kipkelion |
Feedback |
| AGC - Kipchorian - Machilil Road; Tuiyobei - Arap Ngeno - Tilolwet Road; Barsiele Centre - Chorwet Pry - Sugutek Road; Trailor - Kapsoheria Road; Cereal - Magunia Road; Sachwangan - Belsoi Road; Katepia - Mama Major Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,618,532.00 |
Kipkelion |
Feedback |
| Kobiro-Macheisok Road 5km;Miti Moja-Blue Hills Dip Road 3km; Kimologit-Blus Hilss Road 5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,217,234.00 |
Kipkelion |
Feedback |
| Agc - Kipchorian - Machilil |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,614,693.00 |
Kipkelion |
Feedback |
| Tuiyobei - Arap Ngeno - Tilolwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kipkelion |
Feedback |
| Barsiele Centre – Kipchorian – Machilil Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,493,844.00 |
Kunyak |
Feedback |
| Off Main Road - Chemagel Road; Siret Centre Coffee Factory Road; Kimologit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,763,520.00 |
Kunyak |
Feedback |
| Kiptenden Kapkurin Road; Kapkurin-Kamiron Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,561,740.00 |
Kunyak |
Feedback |
| Nyanza- Girimori - Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,071,160.00 |
Kunyak |
Feedback |
| Kapkwen - Chesonoi - Kabirong - Kapkurin - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,086,463.00 |
Kunyak |
Feedback |
| Minihaha - Sirgoi Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,438,585.00 |
Kunyak |
Feedback |
| Dip - Kolonget - Ngebebo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,210,708.00 |
Kunyak |
Feedback |
| Kotetni - Chemunyala - Cherara Road 4.5km; Chepsii - Kapsale Pry - Chemunyala Road 3.2km; Chelalo - Kilengel Road 3.1km; Timbilil - Ngola Road 2km; Kabirong - Kapkwen Road 3.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,630,143.00 |
Kunyak |
Feedback |
| Kipsitet-Mbasa Road; Kipsitet bridge-Kaplabotwo Road; Ngeremwo-Kipsitet dip Road; Nunda-Kipteran Road; Kipteran-Nyaberi Road-Laitigo pry-Maemba Road; Laitigo pry- kapsermi Road; Kapsimingoi-Ndanyomare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,467,128.00 |
Soin |
Feedback |
| Kabore-Cheptililik Road; Cheptililik-Kapkatit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,882,330.00 |
Soin |
Feedback |
| Ngeremwo-Chebotot Road; Maemba Road; Mbasa Road; Asenwet Road; Cheptagum Road; Laitigo primary Road; Koitaburot Road; Kapkatit Road; Cheptililik Road; Cheptororwo Road; - kipteran-Chepsengeny Sch; ndonyomare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,145,134.00 |
Soin |
Feedback |
| Tobentai-Kipyoren-Kapkormom Road;Moetik-Tobentai;Kap Macharia-Kipyoren Road,Kap Gravel-Chemaluk Road;Kaplelach-Kwondop Morsong-kaplelach Bridge -Chepsengeny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soin |
Feedback |
| Ngeremwo-Chebotot Road (6km) and Kwa Michael -Laitigo (4km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,989,046.20 |
Soin |
Feedback |
| Kapkormom Pry - Kapkormom Dispensary Road - Kejiryet - Kaplaboitwa- Sideways - Kapchoge - Laitigo-Ngeremwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,588,980.00 |
Soin |
Feedback |
| Kongeren river- Birirbei-Kapchelemei Road; Arap Chebochok-Arap Chepkoit; Kongeren pry Road; Kap Ingok-Birirbei Road; Chepkoson Road; Chepkoson-Kapsigilai Road; Kapchesilim-Kabokyek cattle dip road; Arap Seronik-sesgaa Road-Sesgaa-Kapsegut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,043,160.00 |
Soliat |
Feedback |
| Soliat corner-Kiptugumo pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soliat |
Feedback |
| Kaplaba-kiptare-Kapcheptoo Road-kapkenyele Road;Kurabei-koyabeyon Road;Kurabei-Chesunut-Kapsigowo Road;Kapsigowo-Malanylem Road;Chesunut-Kapcherinyit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,572,000.00 |
Soliat |
Feedback |
| Tabrason-Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,459,424.00 |
Soliat |
Feedback |
| Kaboykek cattle dip - Kimugul Road; Kimugul koi Barak Road; kapsiongori - Arap ngeny Road; jolydab academy - kaprero Road; Arap Chepsengeny - Chemaluk Road; Chemaluk - Cheptembe Road; Kap injelio - Kap George Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,443,664.00 |
Soliat |
Feedback |
| Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,471,400.00 |
Soliat |
Feedback |
| Kurabei - Mogonjet ; Kurabei/Arap Ngeno - Chepkoson; Soliat Dispensary/boys -Chepkoson Road; Soliat Boys Sec School -Soliat AGC road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,529,400.00 |
Soliat |
Feedback |
| AGC Chesunet - Kapchesengeny Road; Motero pry - Kapkitandyus Road; Kapcherunyit - Kurabei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,724,052.00 |
Soliat |
Feedback |
| Kapingok-Kapchepkaigat -Kurabei road; Arap Chebochok-Arap chepkoit road: Kapchelemei-Kongeren river-Salgaa road: Soliat Boys Sec School-Turguito bridge road: Kongeren pry – Mirmiro: Kapshongiroi - Arap Ngeny: Kaboykek cattle dip - Kapchesilim - Kapsigilai Road : Kaptelo – Chelogong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,352,400.00 |
Soliat |
Feedback |
| Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,211,800.00 |
Soliat |
Feedback |
| Kapnyakitari Centre - Kiptugumo Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,893,600.00 |
Soliat |
Feedback |
| Kaplengeny - Kiptugumo Road; Tabrasin - Kiptugumo dispensary Road; Kapneesoi - Highway - Moretik - Arap Tuei Road; Soliat Boys - Kongeren river- Kapchelemei Road; Kongeren pry - Mirmiro Road; Siriat – Kapsisirwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,384,000.00 |
Soliat |
Feedback |
| Shauri Yako - Kapkenyelo - Kipcheiyet Road; Kapkara - Karap Cheruiyot Road; Kapchesengeny - Chepyegon - Kapchepchilat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,969,156.00 |
Soliat |
Feedback |
| Extension Kenya 1 - Cattle dip - Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,182,888.00 |
Soliat |
Feedback |
| Kapchemirmir TBC - Cherire TBC - Kapsewe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,696,476.00 |
Sigowet |
Feedback |
| Kapchanga - Taiwet - Centre Juu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,520,910.00 |
Sigowet |
Feedback |
| Kapchemirmir TBC - Cherire TBC - Kapsewe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
822,094.32 |
Sigowet |
Feedback |
| Kakibei-KMC - Kuche - Kiptenden - Rwandit - Kapchanga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,616,416.00 |
Sigowet |
Feedback |
| Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,080,000.00 |
Sigowet |
Feedback |
| Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,337,300.00 |
Sigowet |
Feedback |
| Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,030,540.00 |
Sigowet |
Feedback |
| Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,918,972.00 |
Sigowet |
Feedback |
| Sinendet Cherire TBC Road; Kapchemirmir Road; Centre juu - Taiywet - Kapchanga Road; Kiptere market Roads. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,528,300.00 |
Sigowet |
Feedback |
| Sisionik - Chemegong - Kapndege Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,434,200.00 |
Sigowet |
Feedback |
| Kaplelartet-Tililbei Road;Chepkemel-Sumeek Road; Sumeek-Tililbei Road. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,958,163.00 |
Kaplelartet |
Feedback |
| Mutwot - Kokwasoi - Emdit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,645,260.00 |
Kaplelartet |
Feedback |
| Chepkemel Centre - Arap Cheruiyot - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,633,960.00 |
Kaplelartet |
Feedback |
| Kaplelartet - Arap Cheruiyot - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,340.00 |
Kaplelartet |
Feedback |
| Mutwot - Kokwasoi - Emdit Road; Chepkemel Center - Karap Cheruiyot Road; Kapmorok - Chepkemel TBC - Centre Road; Chepchelalemit - Sime Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,014,000.00 |
Kaplelartet |
Feedback |
| Mutwot - Kapkawa- Kiplekwa pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,498,000.00 |
Kaplelartet |
Feedback |
| Kaplelartet - Kapsomboch Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,753,400.00 |
Kaplelartet |
Feedback |
| Kona Sita - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,975,000.00 |
Kaplelartet |
Feedback |
| Rehabilitation and Construction of Lelagoi- Yanja- Karap Maina Road 4.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,578,680.00 |
Sigowet |
Feedback |
| Rehabilitation of Drainage Structures and access roads in Kapkatet Market |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,614,856.00 |
Kapkatet |
Feedback |
| Rehabilitation and Construction of Kapias- Timbilil-Kamotos Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,457,528.00 |
Kunyak |
Feedback |
| Routine Maintenance of Kap Ezekiel Centre- Kipkwes Pry School-Kipchorian River- Kipchorian Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,113,000.00 |
Ainamoi |
Feedback |
| Routine Maintenance of Yasomok-Kamelilo Coffee Factory-Kiburet Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,324,708.00 |
Ainamoi |
Feedback |
| Ainamoi centre-berea AIC Church-Pakao-Delivarance-Kap Jona |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,281,920.00 |
Ainamoi |
Feedback |
| Grading Of Kipchimchim Sec-Kabotris Road, Kabotris-Kondamet Road,Kapcheptoror-Sirimdo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,455,700.00 |
Kipchimchim |
Feedback |
| Construction of Kiptabo TBC-Chepkosilen sec-Ainap Isirek-Bondeni road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,329,016.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Chomisian- Ngariet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,629,200.00 |
Kisiara |
Feedback |
| Construction Of Chepkitar Centre- Toroton Boundary- Yalla Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,516,740.00 |
Chilchila |
Feedback |
| Grading of Chilchila- Murgut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,484,640.00 |
Chilchila |
Feedback |
| Kisumu Ndogo-TBC-Melit r, Kapsamba-Kamasian Road, Kimungen Road,Dispensary-KamasianRoad, maso Market-Maso sch Road; Maso Shopping -Maso Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,656,736.00 |
Kamasian |
Feedback |
| Kiprengwe Pry School- Miti Moja Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,189,694.00 |
Kedowa/Kimugul |
Feedback |
| Masaita - Itoik - 936 farmers Road 5.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,078,550.00 |
Londiani |
Feedback |
| Construction of Kaprongori- -Kaproret Road; Tulwet-Ngianet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,925,328.00 |
Kisiara |
Feedback |
| Routine Maintenance of Darajet-Barekeiwet dinspensary-Arap Maina-Mungenik road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
6,423,960.00 |
Soliat |
Feedback |
| Routine Maintenance of Off D312-938 Girls Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,288,392.00 |
Chepseon |
Feedback |
| Rehabilitation and Construction Drainage Strutures and Tarmacking of 936 Town |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,700,240.00 |
Kedowa/Kimugul |
Feedback |
| Construction of 28m of 600mm and twin 900mm Cross Culvert at Chepkemel Cetre- Arap Cheruiyot- Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,602,908.00 |
Kaplelartet |
Feedback |
| Kabusienduk |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,348,608.00 |
Tebesonik |
Feedback |
| Kenene |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,739,032.00 |
Tebesonik |
Feedback |
| Construction of an ECDE classroom at Chepkong'ony ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,231,788.00 |
Chemosot |
Feedback |
| Construction of Pit latrine at Bargiro ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
8,172,396.00 |
Chemosot |
Feedback |
| Construction of pit latrine at Kabartegan ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
1,865,596.00 |
Chemosot |
Feedback |
| Construction of a pit latrine at Kapkusum ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
6,905,292.00 |
Chemosot |
Feedback |
| Construction of a toilet at Nyambolosa ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,229,712.00 |
Litein |
Feedback |
| Construction of a classroom at Kapsogeruk ECDE centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,724,750.00 |
Litein |
Feedback |
| Construction of a pit latrine at Kibolgong Ecde Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,229,712.00 |
Tebesonik |
Feedback |
| Koisegem ECDE |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
3,064,048.00 |
Chilchila |
Feedback |
| Toroton Polytechnic (1 Workshop) |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
544,460.00 |
Chilchila |
Feedback |
| Workshop Kipsimbol Polytechnic |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,572,995.00 |
Kipkelion |
Feedback |
| Construction of an ECDE classroom and pit latrine at Magire ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,654,708.00 |
Chilchila |
Feedback |
| Construction of Toilet at Murao/ Kapluso ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,015,955.00 |
Kamasian |
Feedback |
| Construction of an ECDE classroom and at Chebitet ECDE Centre |
Improve access, quality of learning and care in ecde centers |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,189,313.00 |
Kamasian |
Feedback |
| Construction of twin workshop at Kiptere VTC Phase I |
To provide accessible, practical, and industry-relevant technical education and vocational training. |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
4,457,140.00 |
Kaplelartet |
Feedback |
| Siritiet |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,391,476.00 |
Tebesonik |
Feedback |
| Construction of a toilet at Tiriitab Eito ECDE Centre |
Ensure Hygiene and Sanitation, Promote Health and Disease Prevention |
Education, Youth Affairs, Sports, Culture and Social Services |
Completed
|
2,168,937.00 |
Tebesonik |
Feedback |
| Acquisition of land for expansion of water treatment works |
Increase Water Treatment Capacity, Secure Adequate Space for Infrastructure Expansion |
Lands, Housing and Physical Planning |
Completed
|
1,641,160.00 |
Kapkugerwet |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To come up with plan to guide development and acquisition of ownership documents |
Lands, Housing and Physical Planning |
Completed
|
801,360.00 |
Kapkugerwet |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
4,233,372.00 |
Kapsuser |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
2,234,452.00 |
Cheboin |
Feedback |
| Consultancy services for the preparation of Local Physical and Land Use Development plans |
To guide orderly physical development through rational allocation of land for various uses |
Lands, Housing and Physical Planning |
Completed
|
5,455,764.00 |
Kisiara |
Feedback |