| Ap Line- Jogoo- Market Road |
Public Works, Roads and Transport |
|
N/A |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Off E22- Kabarus Road |
Public Works, Roads and Transport |
Completed
|
1,122,741.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Bundalangi-
Bechulelach Road |
Public Works, Roads and Transport |
Completed
|
1,302,700.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Ainapsosiot- Binyiny Road |
Public Works, Roads and Transport |
Completed
|
177,040.00 |
Kapsaos |
Feedback |
| Proposed Construction and Rehabilitation of Muiywek- Kipsamoi Pry- Kiptegan Pry School Road |
Public Works, Roads and Transport |
Completed
|
1,504,206.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of Kenegut Market- Cheplel Pry-
Cherire Road |
Public Works, Roads and Transport |
Completed
|
1,231,298.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of Kipchimchim Sec School- Kipsakwa Road |
Public Works, Roads and Transport |
Completed
|
1,502,113.00 |
Kipchimchim |
Feedback |
| Proposed Construction and Rehabilitation of Kimungen Bridge-
Kamasian AGC Road |
Public Works, Roads and Transport |
Completed
|
1,495,043.00 |
Kipchebor |
Feedback |
| Proposed Construction and Rehabilitation of Kwa Zablon- Kipchebor Pry
School Road |
Public Works, Roads and Transport |
Completed
|
1,188,246.00 |
Kipchebor |
Feedback |
| Proposed Construction and Rehabilitation of Annex Prison- Kwa Silvan Road |
Public Works, Roads and Transport |
Completed
|
1,252,030.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Mangweni Academy-
Satelight Road |
Public Works, Roads and Transport |
Completed
|
1,427,190.00 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of AGC Chepkemel- Chepkemel Pry- Ormarichok-
Tililbei TBC ML 50B-
Kapkendu Centre Road |
Public Works, Roads and Transport |
Completed
|
N/A |
Kaplelartet |
Feedback |
| Proposed Construction and Rehabilitation of Kapkongoni Pry- Nyaberi Primary School
-Kapkisai Pry School Road |
Public Works, Roads and Transport |
Completed
|
1,495,043.00 |
Soin |
Feedback |
| Proposed Construction and Rehabilitation of Kapsigowo- Koibaino ECDE Centre- Koibaino FPPK- Chebaran Dip Road |
Public Works, Roads and Transport |
Completed
|
1,289,060.00 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Baregeiywet FPPK- Motonyi Believers
Church- Corner C Road |
Public Works, Roads and Transport |
Completed
|
1,252,030.00 |
Soliat |
Feedback |
| Proposed Construction and Rehabilitation of Kebeneti- Mwebe SDA- Cheplosgei Dispensary- Tamboiyot
Road |
Public Works, Roads and Transport |
Completed
|
1,299,306.00 |
Sigowet |
Feedback |
| Kamelilo- Yasomok Road |
Public Works, Roads and Transport |
Completed
|
1,802,524.00 |
Ainamoi |
Feedback |
| Ainamoi Pry- Chemila- Kapsigilai-Kap Zakayo Junction Road |
Public Works, Roads and Transport |
Completed
|
1,494,130.00 |
Ainamoi |
Feedback |
| Kap Thomas- Tabet Pry- Samoei Road |
Public Works, Roads and Transport |
Completed
|
1,170,000.00 |
Kapsaos |
Feedback |
| Chesumot- Kamukek- Kapkiam Seconadry Road |
Public Works, Roads and Transport |
Completed
|
1,082,020.00 |
Kapsaos |
Feedback |
| Kipsamungut- Telanet Pry- Grassland Road |
Public Works, Roads and Transport |
Completed
|
1,175,024.00 |
Kapsoit |
Feedback |
| Kenegut Quarry- Lemeiywet- Kenegut Market Road |
Public Works, Roads and Transport |
Completed
|
1,116,001.00 |
Kapsoit |
Feedback |
| Arap Tegere – Kwa biwot – Korosek Road |
Public Works, Roads and Transport |
Completed
|
883,966.00 |
Kapsoit |
Feedback |
| Kenegut Centre- Lemeiywet Pry School - Worlwide Church Road |
Public Works, Roads and Transport |
Completed
|
1,183,200.00 |
Kapsoit |
Feedback |
| Sebetet- Kamatwere - Itibet Road |
Public Works, Roads and Transport |
Completed
|
1,200,000.00 |
Kipchimchim |
Feedback |
| Boito- Kapcheptoror Road |
Public Works, Roads and Transport |
Completed
|
1,294,304.00 |
Kipchimchim |
Feedback |
| Off B1- Green Square Mall - Kericho Golf Club- Kericho Pry- Mortgage Road |
Public Works, Roads and Transport |
Completed
|
1,289,591.00 |
Kipchebor |
Feedback |
| Satelite- Matobo Pry School - Barabara Mpya- Taa Road |
Public Works, Roads and Transport |
Completed
|
1,499,938.00 |
Kipchebor |
Feedback |
| Kwa Reuben- Cherote- Kimugen Dispensay- Kamasian Pry School Road |
Public Works, Roads and Transport |
Completed
|
1,249,000.00 |
Kipchebor |
Feedback |
| Chemugusu Junction- Chemugusu Pry-Kondamet- Satelight Road |
Public Works, Roads and Transport |
Completed
|
1,249,535.00 |
Kapkugerwet |
Feedback |
| Proposed repair and redecoration works at Mama Ngina Estate Phase II |
Lands, Housing and Physical Planning |
Completed
|
987,000.00 |
Kapkugerwet |
Feedback |
| Proposed roof renovation at the Governor's office block |
Lands, Housing and Physical Planning |
Completed
|
987,000.00 |
Kipchebor |
Feedback |
| Sumeiyon- Chelogoi Road |
Public Works, Roads and Transport |
Completed
|
540,908.00 |
Kapkugerwet |
Feedback |
| Proposed refurbishment of County Court |
Lands, Housing and Physical Planning |
Completed
|
1,308,945.00 |
Kipchebor |
Feedback |
| Chelogoi - Chepsetyon Road |
Public Works, Roads and Transport |
Completed
|
540,094.00 |
Kapkugerwet |
Feedback |
| Proposed repairs and redecoration to County houses at Belgut estate |
Lands, Housing and Physical Planning |
Completed
|
3,284,036.69 |
Kapkugerwet |
Feedback |
| Installation of cabro works at the County Government head quarters |
Lands, Housing and Physical Planning |
Completed
|
3,209,073.59 |
Kipchebor |
Feedback |
| Renovation works at the LHPP head quarters |
Lands, Housing and Physical Planning |
Completed
|
3,196,994.65 |
Kipchebor |
Feedback |
| Kimoson Dispensary- Sumeek Pry- Sumeek TBC Road |
Public Works, Roads and Transport |
Completed
|
535,750.00 |
Kaplelartet |
Feedback |
| Kaplelartet SDA Church- Emdit Pry School Road |
Public Works, Roads and Transport |
Completed
|
25,725.00 |
Kaplelartet |
Feedback |
| Seronik TBC-Seronik Pry- Chepkitwal TBC- Musaria Pry School Road |
Public Works, Roads and Transport |
Completed
|
536,850.00 |
Kaplelartet |
Feedback |
| Kipsitet Primary- Karap Tele- Muhuroni Junction Road |
Public Works, Roads and Transport |
Completed
|
463,478.00 |
Soin |
Feedback |
| Kamusar- Kipkombich- Kaptalamwa Pry School Road |
Public Works, Roads and Transport |
Completed
|
558,728.90 |
Soin |
Feedback |
| Cheptuiyet ML 018-Kap John- Nduma Junction- Lelagoi Pry- Lelagoi
Junction Road |
Public Works, Roads and Transport |
Completed
|
580,000.00 |
Sigowet |
Feedback |
| Kuche-Rwandit Dip- Kapkeburu Pry School Road |
Public Works, Roads and Transport |
Completed
|
797,100.00 |
Sigowet |
Feedback |
| ML 018-
Kululut River- Coffee Factory- Cattle Dip Road |
Public Works, Roads and Transport |
Completed
|
598,995.00 |
Sigowet |
Feedback |
| Kongeren SDA- Kimugul SDA- Kimugul Junction Road |
Public Works, Roads and Transport |
Completed
|
491,364.00 |
Soliat |
Feedback |
| Motero- Mongojet Road |
Public Works, Roads and Transport |
Completed
|
558,041.20 |
Soliat |
Feedback |
| Ainabon water project in Kipchebor ward |
Water, Environment, Energy and Natural Resources |
Completed
|
1,488,973.00 |
Kipchebor |
Feedback |
| Nyinyitiet - Kapkwen Pry School Road |
Public Works, Roads and Transport |
Completed
|
773,762.00 |
Ainamoi |
Feedback |
| Off Highway - Kabuloin Secondary School Road |
Public Works, Roads and Transport |
Completed
|
551,980.00 |
Kapsaos |
Feedback |
| Cheptarit AGC
- Ngariet bridge
- Kalyongwet Pry School Road |
Public Works, Roads and Transport |
Completed
|
798,150.00 |
Kaplelartet |
Feedback |
| Sachangwan - Kipkeiyo TBC - KapChanga TBC Road |
Public Works, Roads and Transport |
Completed
|
793,672.00 |
Sigowet |
Feedback |
| Kipsitet Pry School - Kipsitet Dip - Kap Jeremiah Road |
Public Works, Roads and Transport |
Completed
|
793,672.00 |
Soin |
Feedback |
| Nyaberi bridge- Kap Pastor Road |
Public Works, Roads and Transport |
Completed
|
841,561.00 |
Soin |
Feedback |
| Salgaa - Arap Chebochok - Arap Bilo Road |
Public Works, Roads and Transport |
Completed
|
510,515.00 |
Soliat |
Feedback |
| Maso-Kewasco Lastmile Connectivity Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,080,000.00 |
Kapkugerwet |
Feedback |
| Kamasega SDA
- Kamasega Central ECDE Road |
Public Works, Roads and Transport |
Completed
|
853,890.00 |
Soliat |
Feedback |
| Matobo Kewasco Water Supply Project Last Mile Connectivity |
Water, Environment, Energy and Natural Resources |
Completed
|
2,500,000.00 |
Kipchebor |
Feedback |
| Sasuriet Water Project Last Mile Connectivity |
Water, Environment, Energy and Natural Resources |
Completed
|
1,100,000.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Mogo – Itibet – Chepkuk – Cheplel Pry
School Road |
Public Works, Roads and Transport |
Completed
|
691,650.00 |
Kapsoit |
Feedback |
| Chepngobob-Kiptegan Water Project last Mile Connectivity |
Water, Environment, Energy and Natural Resources |
Completed
|
1,800,000.00 |
Kapsaos |
Feedback |
| Proposed Construction and Rehabilitation of Off B1 – Chepkolon Green Highlands School –
Kipkeles Road |
Public Works, Roads and Transport |
Completed
|
720,328.00 |
Kipchebor |
Feedback |
| Taiwet Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,370,993.00 |
Kipchimchim |
Feedback |
| Proposed Construction and Rehabilitation of Ormorijok – Kapsomboch Pry School
Road |
Public Works, Roads and Transport |
Completed
|
729,814.00 |
Kaplelartet |
Feedback |
| Proposed Maintenance of Itibet-Ngeny Bare-Bagao- Deliverance Road |
Public Works, Roads and Transport |
Completed
|
515,650.00 |
Ainamoi |
Feedback |
| Samoei Academy-Kap Martin Road |
Public Works, Roads and Transport |
Completed
|
507,012.00 |
Kapsaos |
Feedback |
| Kenegut-Koisagat Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,408,270.00 |
Kapsoit |
Feedback |
| Proposed Construction of Itibet-Cheptang Road |
Public Works, Roads and Transport |
Completed
|
777,850.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of Baraka-Kap Maina Road |
Public Works, Roads and Transport |
Completed
|
581,137.00 |
Kipchimchim |
Feedback |
| Ainabon Water Project Phase 11 |
Water, Environment, Energy and Natural Resources |
Completed
|
1,846,760.00 |
Kipchebor |
Feedback |
| Kamaget Dispensary- Tamboiyot Pry- Kapchanga Road |
Public Works, Roads and Transport |
Completed
|
537,063.00 |
Sigowet |
Feedback |
| Proposed Maintenance of Chepsoo- Quarry- Kapkawa Road |
Public Works, Roads and Transport |
Completed
|
710,152.00 |
Soliat |
Feedback |
| Proposed Mintenance of Kimugul- Kabokyek Junction - Chelogong- Chemaluk Church of Christ -Sesgaa Road |
Public Works, Roads and Transport |
Completed
|
1,237,455.00 |
Soliat |
Feedback |
| Proposed Maintenance of Kurabei- Kiptenden - Mogonjet Road |
Public Works, Roads and Transport |
Completed
|
507,268.00 |
Soliat |
Feedback |
| Proposed Maintenance of Kurabei- Koibeyon- Kamaseka
Quarry Road |
Public Works, Roads and Transport |
Completed
|
764,550.00 |
Soliat |
Feedback |
| Proposed Construction of Soko Ndizi-Kap Simba-Off B1- Chesiche Pri.Junction Road |
Public Works, Roads and Transport |
Completed
|
497,704.00 |
Soliat |
Feedback |
| Proposed Construction of 21m of 900mm Cross Culverts and 7m of 600mm to Kamelilo- Koisirat- Tembwet Road |
Public Works, Roads and Transport |
Completed
|
549,177.93 |
Ainamoi |
Feedback |
| Proposed Construction of 600mm culverts at Quintete – Site and Service Road |
Public Works, Roads and Transport |
Completed
|
594,650.00 |
Kapkugerwet |
Feedback |
| Proposed Construction of 600mm culverts at Kipchimchim-Kipsakwa – Kipchimchim Sec -Baraka – Kapcherongos -Kimeswon Road |
Public Works, Roads and Transport |
Completed
|
765,693.00 |
Kipchimchim |
Feedback |
| Otui Borehole Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Kapsaos |
Feedback |
| Sullivan/Annex Spring Protection |
Water, Environment, Energy and Natural Resources |
Completed
|
1,225,000.00 |
Kapkugerwet |
Feedback |
| Proposed Construction of 24m of 900mm Cross Culvert to Simbi- Emitiot Road |
Public Works, Roads and Transport |
Completed
|
850,850.00 |
Soin |
Feedback |
| Proposed Construction andRehabilitation of Samutet Dispensary
-Kaptungu Road |
Public Works, Roads and Transport |
Completed
|
1,132,630.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of Chemabei Pry- Samutet Dispensary Road |
Public Works, Roads and Transport |
Completed
|
1,300,000.00 |
Kapsoit |
Feedback |
| Chesilot Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
946,699.20 |
Kapsoit |
Feedback |
| Proposed Maintenance of Kap Frank - Sachangwan Road |
Public Works, Roads and Transport |
Completed
|
1,299,200.00 |
Kaplelartet |
Feedback |
| Chepsoo - Kapsasur water project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,333,490.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of Off B1-Nunda River-
Kipteran ECDE- Ndonyomare Pry-Off B1 Road |
Public Works, Roads and Transport |
Completed
|
933,628.50 |
Soin |
Feedback |
| Proposed Construction and Rehabilitation of Chemaluk-Gladys Canteen Road |
Public Works, Roads and Transport |
Completed
|
1,070,688.00 |
Soin |
Feedback |
| Reresik Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,590,592.00 |
Ainamoi |
Feedback |
| Proposed Construction and Rehabilitation of Chebigen Sec- Samaria Nursery School Road |
Public Works, Roads and Transport |
Completed
|
938,440.00 |
Kapsaos |
Feedback |
| Chepkoinik Kirukto Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,495,550.00 |
Kapsoit |
Feedback |
| Rehabilitation of Kericho Town Dumpsite |
Water, Environment, Energy and Natural Resources |
Completed
|
886,379.00 |
Kipchebor |
Feedback |
| Victors Academy – Sumeiyon – Boito Road |
Public Works, Roads and Transport |
Completed
|
1,496,331.27 |
Kapkugerwet |
Feedback |
| Proposed Construction and Rehabilitation of Sachangwan- Ainapptibik-
Kaplegeny- Kapsegut Road |
Public Works, Roads and Transport |
Completed
|
1,493,940.00 |
Soliat |
Feedback |
| Kericho Town Dumpsite weighbridge offices |
Water, Environment, Energy and Natural Resources |
Completed
|
N/A |
Kipchebor |
Feedback |
| Mjini/Kisima Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,494,920.00 |
Kipchebor |
Feedback |
| Birirbei Water Project Phase II |
Water, Environment, Energy and Natural Resources |
Completed
|
1,411,987.00 |
Kipchebor |
Feedback |
| Proposed construction of twin 900mm pipe culvert to Kondamet- Jordan road |
Public Works, Roads and Transport |
Completed
|
1,499,699.00 |
Kapsoit |
Feedback |
| Proposed Construction and Rehabilitation of 600mm culverts to Ngororga Treatment Works - Chepngobob Pry-Maso centre road in 949 |
Public Works, Roads and Transport |
Completed
|
936,550.00 |
Kapsaos |
Feedback |
| Proposed Construction and Rehabilitation of 600mm culverts to Cereal-Mjini-Kwa Reuben-Cherote-Kipkeles- Nyagacho road in 947 |
Public Works, Roads and Transport |
Completed
|
600,000.00 |
Kipchebor |
Feedback |
| Chepkurbet – Kewasco Lastmile Connectivity Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,178,864.00 |
Kapsoit |
Feedback |
| Chepkoiyo Water Project |
Water, Environment, Energy and Natural Resources |
Completed
|
1,511,890.00 |
Ainamoi |
Feedback |
| Rehabilitation of Chepkurbet Water Supply |
Water, Environment, Energy and Natural Resources |
Completed
|
1,297,940.00 |
Kapsoit |
Feedback |
| Last mile Connectivity in Ainamoi ward |
Water, Environment, Energy and Natural Resources |
Completed
|
1,504,550.00 |
Ainamoi |
Feedback |