2020/2021 FINANCIAL YEAR PROJECTS

Ainamoi Sub County

- Completed Projects-
Go back

Project Department Status Budget(Kshs) Ward
Sitotwet Dispensary Health Services Completed 2,773,550.00 Kapsoit Feedback
Torsogeek Dispensary Health Services Completed 5,992,860.00 Kapsoit Feedback
Torsogeek Dispensary Health Services Completed 3,900,800.00 Kapsoit Feedback
Kericho County Referral hospital Health Services Completed 3,499,700.00 Kipchebor Feedback
Kericho County Referral hospital Health Services Completed 1,503,600.00 Kipchebor Feedback
Kericho County Referral hospital Health Services Completed 3,699,635.00 Kipchebor Feedback
Kericho County Referral hospital Health Services Completed 2,023,540.00 Kipchebor Feedback
Kericho County Referral hospital Health Services Completed 1,060,000.00 Kipchebor Feedback
Chesanga Dispensary Health Services Completed 2,421,720.00 Kipchebor Feedback
Kimungen Dispensary Health Services Completed 1,775,200.00 Kipchebor Feedback
Kericho County Referral hospital Health Services Completed 1,113,000.00 Kipchebor Feedback
Kimungen Dispensary Health Services Completed 1,272,000.00 Kipchebor Feedback
Chesanga Dispensary Health Services Completed 2,003,400.00 Kipchebor Feedback
Kericho County Referral hospital Health Services Completed 5,319,600.00 Kipchebor Feedback
County Referral Hospital Health Services Completed 2,353,600.00 Kipchebor Feedback
Sasuriet Water Project Water, Environment, Energy and Natural Resources Completed 6,549,900.00 Ainamoi Feedback
Itibet - Bagao- Deliverance Church Road Public Works, Roads and Transport Completed 10,338,300.00 Ainamoi Feedback
Kiburet- Factory- Yasomok Road Public Works, Roads and Transport Completed 1,205,220.00 Ainamoi Feedback
Kap Zakayo- Ainamoi Polythecnic Road Public Works, Roads and Transport Completed 3,307,200.00 Ainamoi Feedback
Nyinyitiet- Chemorir Road Public Works, Roads and Transport Completed 560,000.00 Ainamoi Feedback
Kiburet- Nyinyitiet Road Public Works, Roads and Transport Completed 420,000.00 Ainamoi Feedback
Duka Moja- Kiparao Road Public Works, Roads and Transport Completed 5,409,180.00 Kapkugerwet Feedback
Sumeiyon- Chelogoi Road Public Works, Roads and Transport Completed 1,038,000.00 Kapkugerwet Feedback
Kapriwet- Arap Nyige Public Works, Roads and Transport Completed 1,747,300.00 Kapsaos Feedback
Manyoror Sign Post- Manyoror Sec- Off Kapsaos Ainamoi Road Public Works, Roads and Transport Completed 1,316,250.00 Kapsaos Feedback
Torochgaa- Koigaron- Tegunot Road Public Works, Roads and Transport Completed 2,393,784.00 Kapsaos Feedback
Kosisit Primary- Kap Abinwas- Arap Rugut Public Works, Roads and Transport Completed 1,300,452.00 Kapsoit Feedback
Off B1- Chepsoo Pry School Road Public Works, Roads and Transport Completed 1,890,404.00 Kapsoit Feedback
Cherire - Kisabei Pry- Kiptegan Nursery Road Public Works, Roads and Transport Completed 1,880,704.00 Kapsoit Feedback
Kap Eli - Off B1 - Koiyet - Chesanga -Hass Petrol Station- Emanuels Agc Chucrh- Kiboko- Off B1 Road Public Works, Roads and Transport Completed 5,411,600.00 Kipchebor Feedback
Satelite - Matobo Primary-Nyagacho - Nursery Road Public Works, Roads and Transport Completed 911,900.00 Kipchebor Feedback
Baraka Kipsotet-Kimeswon Road Public Works, Roads and Transport Completed 566,575.00 Kipchimchim Feedback
Taiwet - Kipsutet Primary School Road Public Works, Roads and Transport Completed 140,000.00 Kipchimchim Feedback
Kap Joseah- Kipsakwa Road Public Works, Roads and Transport Completed 3,021,000.00 Kipchimchim Feedback
Kapango- Simotwet Road Public Works, Roads and Transport Completed 632,000.00 Kipchimchim Feedback
Routine Maintenance of Chesino- Kapkormom- Koiyabei Road Public Works, Roads and Transport Completed 2,420,720.00 Soin Feedback
Routine Maintenance of Kipsitet Cattle Dip- Asenwet-Kap Musar Road Public Works, Roads and Transport Completed 1,749,000.00 Soin Feedback
Routine Maintenance of Chemaluk- Gladys Canteen- Bokwo Road Public Works, Roads and Transport Completed 1,352,400.00 Soin Feedback
Routine Maintenance of Soliat Corner – Kaplengeny – Kiptugumo Road Public Works, Roads and Transport Completed 2,363,060.00 Soliat Feedback
Routine Maintenance of R47- Chebaran Road Public Works, Roads and Transport Completed 3,949,360.00 Soliat Feedback
Routine Maintenance of Cheramor Centre- Kipkerer Bridge- Arap Bore Road Public Works, Roads and Transport Completed 735,000.00 Soliat Feedback
Routine Maintenance of Tarajet- Baregeiwet Dispeensary- Karap Maina- Mungenik Road Public Works, Roads and Transport Completed 667,800.00 Soliat Feedback
Routine Maintenance of Salgaa- Kongeren River- Kap Laiba Road Public Works, Roads and Transport Completed 1,360,800.00 Soliat Feedback
Routine Maintenance of Kakibei- Kapchemirmir- Mutata- Chepkochun Road Public Works, Roads and Transport Completed 6,216,900.00 Sigowet Feedback
Routine Maintenance of Sisionik- Tumoyot Road Public Works, Roads and Transport Completed 4,600,412.00 Sigowet Feedback
Routine Maintenance of ML 10- Chebetet- Kalyongwet TBC Road Public Works, Roads and Transport Completed 3,503,850.00 Kaplelartet Feedback
Routine Maintenance of Mutwot - Emdit Road Public Works, Roads and Transport Completed 1,190,012.00 Kaplelartet Feedback
Routine Maintenance of Kaplelartet Chief’s Office- Tabaita Centre Road Public Works, Roads and Transport Completed 1,166,000.00 Kaplelartet Feedback
Construction of Kerego Box Culvert at Kwa Silvan- Kids home - Kerego Public Works, Roads and Transport Completed 2,082,900.00 Kapkugerwet Feedback
Construction of Ainapkosobin 3X900mm cross culvert Public Works, Roads and Transport Completed 1,441,600.00 Kapkugerwet Feedback
Construction of Twin 900mm cross culvert at Wema - Chemugusu Road Public Works, Roads and Transport Completed 2,179,800.00 Kapkugerwet Feedback
Construction of Torsogek Box Culvert Public Works, Roads and Transport Completed 3,794,800.00 Kapsoit Feedback
Construction of Jordan Box Culvert Public Works, Roads and Transport Completed 1,816,604.00 Kapsoit Feedback
Construction of Mjini Box Culvert Public Works, Roads and Transport Completed 2,609,944.00 Kipchebor Feedback
Construction of Gokul- Kamelilo Box Culvert Public Works, Roads and Transport Completed 4,264,692.00 Ainamoi Feedback
Installation of 10 lines of 600mm along Arap Cheruiyot- Maberiat AGC Church Road, Budalangi-Totlilet- Mureret Road Public Works, Roads and Transport Completed 1,015,000.00 Ainamoi Feedback
Construction of Koigaron Twin 900mm cross culvert Public Works, Roads and Transport Completed 1,251,860.00 Kapsaos Feedback
Construction of Buchenge Deck for Bridge Public Works, Roads and Transport Completed 4,696,800.00 Kapsaos Feedback
Construction of Kisabei Box Culvert Public Works, Roads and Transport Completed 1,124,500.00 Kapsoit Feedback
Construction of Sugutek Box Culvert Public Works, Roads and Transport Completed 391,680.00 Kapsoit Feedback
Construction of Kapsinei Mini Bridge Public Works, Roads and Transport Completed 2,120,000.00 Kapsoit Feedback
Construction of Kapsakwa Box Culvert Public Works, Roads and Transport Completed 4,028,000.00 Kipchimchim Feedback
Construction of Kimugen Box Culvert Public Works, Roads and Transport Completed 6,360,000.00 Kipchebor Feedback
Construction of Nunda Box Culvert Public Works, Roads and Transport Completed 2,158,400.00 Soin Feedback
Construction of Kapaiwo twin 900mm Culvert Public Works, Roads and Transport Completed 2,595,000.00 Soliat Feedback
Construction of Kongeren twin 900mm Culvert Public Works, Roads and Transport Completed 6,164,640.00 Soliat Feedback
Construction of Sombicho Twin 900mm Culverts Box Culvert Public Works, Roads and Transport Completed 5,117,200.00 Soliat Feedback
Construction of Orgony Box Culvert Public Works, Roads and Transport Completed 8,391,800.00 Sigowet Feedback
Construction of Sime Box Culvert Public Works, Roads and Transport Completed 1,608,900.00 Kaplelartet Feedback
Construction of School of Excellence Box Culvert Public Works, Roads and Transport Completed 2,650,000.00 Kaplelartet Feedback
Budalangi-Bechulelach-Kipchorian rd; Kaptongilo-Cheplit rd Public Works, Roads and Transport Completed 2,158,400.00 Ainamoi Feedback
Kiburet-Factory- Yasomok Road Public Works, Roads and Transport Completed 3,988,720.00 Ainamoi Feedback
Ketpyse rd;Kamelilo rd Public Works, Roads and Transport Completed 224,774,768.60 Ainamoi Feedback
Ainamoi Polytechnic - Kapsengerini rd (2Km); Ainamoi Sub County Hospital (0.5Km); Kapjonah - Bagao rd (5Km); Ainamoi bridge – Maseriat AGC Rd (2km) Public Works, Roads and Transport Completed 15,363,827.10 Ainamoi Feedback
Ainamoi Shopping centre- Ainamoi pry- Itibet road; Senetwet - Arap Cheruiyot - Maberiat FGC rd; Kamelilo coffee factory - Kamelilo pry - Arap Ngeny rd; Kamelilo pry - Koisirat rd Public Works, Roads and Transport Completed 46,884,040.00 Ainamoi Feedback
Lelechwet - Mureret rd; Ainamoi town Public Works, Roads and Transport Completed 8,941,017.66 Ainamoi Feedback
Ainamoi Market - Ainamoi pry - Itibet rd Public Works, Roads and Transport Completed 25,984,788.64 Ainamoi Feedback
Senetwet - Arap Cheruiyot - Maberiat FGK rd Public Works, Roads and Transport Completed 242,660.00 Ainamoi Feedback
Kakobirit - Karapbii rd; Kapkeregu - Budalangi - Kapcosmas - Sitini rd Public Works, Roads and Transport Completed 1,153,168.00 Ainamoi Feedback
Lelechwet - Arap cheboiyon rd; Kaptongilo - Kapchepngok rd Public Works, Roads and Transport Completed 2,058,746.00 Ainamoi Feedback
Kamelilo factory - Karapngeny rd; Kamelilo pry sch - Kapseremiot river rd; Kapkenat - Kapboniface Kilii rd Public Works, Roads and Transport Completed 6,914,380.00 Ainamoi Feedback
Ainamoi Centre rd/Bagao Public Works, Roads and Transport Completed 1,444,376.00 Ainamoi Feedback
Keongo Pry School ground leveling Public Works, Roads and Transport Completed 2,402,200.00 Kapkugerwet Feedback
Keongo-Kapsigong Road Public Works, Roads and Transport Completed 2,950,340.00 Kapkugerwet Feedback
Chemugusu rd; Laibon Town rds; Keongo - Sumeiyon Road Public Works, Roads and Transport Completed 7,309,772.00 Kapkugerwet Feedback
Roads at Kapkurgwet ward Public Works, Roads and Transport Completed 4,019,544.00 Kapkugerwet Feedback
Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km) Public Works, Roads and Transport Completed 4,231,788.00 Kapkugerwet Feedback
Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km); Keongo FGCK - Kapturungi rd (2km; Masengo - Laibon rd (2km); Kondamet - Agc - Ngororoga rd (2km); Nukiat - Catholic - Keongo rd (2km) Public Works, Roads and Transport Completed 1,272,892.00 Kapkugerwet Feedback
Keongo - Quentete - Sumeiyon Road Public Works, Roads and Transport Completed 712,320.00 Kapkugerwet Feedback
Chemugusu - Satelite rd; Tea point - Paksonrd; Eland Academy - Majengo - St. Patrick rd; Site and Service- Kericho Academy - Talai rd; Tea Hotel - Kimugu Treatment works rd; Quintete - Talai rd; Off B1 - Duka Moja Junction rd Public Works, Roads and Transport Completed 1,664,200.00 Kapkugerwet Feedback
Kapsilangwa-Ainapsosiot rd;Kapoldoit-Kaprewet rd;Chesumot rd;Binyiny rd ;Mureret rd Public Works, Roads and Transport Completed 600,600.00 Kapsaos Feedback
Kipsigori - Kapsaos Centte rd; Off C35 - Lamaiyat pry - Torochgaa brdige rd; Kapngetuny rd Public Works, Roads and Transport Completed 6,017,604.00 Kapsaos Feedback
Tabet-Koigaron-Mureret-Kipsigori-Kamuungei road Public Works, Roads and Transport Completed 1,293,900.00 Kapsaos Feedback
Kapsoit-Kaboswa- Kimasian-Kiboibei-Slaughter hse road Public Works, Roads and Transport Completed 4,135,256.00 Kapsoit Feedback
mongo- Chepkut rd; Kenegut-Chepkel TBC-Chesire rd; Kenegut MKT-Kisabei Pry-Kiptegan Nursery rd; Kapsoit- Kaboswa-Kimasian-Kiboibei-Slaughter rd; Off b1-Ngecherok AGC-Chepkurbet Pry road Public Works, Roads and Transport Completed 5,483,160.00 Kapsoit Feedback
Off B1-Chemobei rd;Off B1-Chepkurbet AGC;Off B1-Ngecherok AGC rd Public Works, Roads and Transport Completed 4,201,828.00 Kapsoit Feedback
off E222-Kaptoroi-Kiptenden rd;Muiwek-Tuiyobei rd Public Works, Roads and Transport Completed 2,034,020.00 Kapsoit Feedback
Kara Tegerei - Gabel rd; Tilrap Malit - Kirongisyet rd; John Bett - Kirongisyet rd; Kaptimothy - Chelule rd; Chemoibei pry - Koitabai rd; Arap Kenei - Kiptendon Rd; Kiptendon - Lemeiywet rd Public Works, Roads and Transport Completed 3,742,792.00 Kapsoit Feedback
Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd Public Works, Roads and Transport Completed 207,600.00 Kapsoit Feedback
Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd Public Works, Roads and Transport Completed 4,890,916.00 Kapsoit Feedback
Kichinjet - Kaboswa rd; Karap Tergei - Chepsoo rd; Kamundu rd; Samutet pry - Chemobei rd; Samutet - Kappeter rd; Karap Teregei rd; Tiles - Karap Barjwot rd; Toro - Kameshak rd; Sitotwet - Kirongishet rd; Koitabai rd; Karap Tererei - Gable rd Public Works, Roads and Transport Completed 1,320,760.00 Kapsoit Feedback
Kipsitet-Mbasa Road; Kipsitet bridge-Kaplabotwo Road; Ngeremwo-Kipsitet dip Road; Nunda-Kipteran Road; Kipteran-Nyaberi Road-Laitigo pry-Maemba Road; Laitigo pry- kapsermi Road; Kapsimingoi-Ndanyomare Road Public Works, Roads and Transport Completed 6,467,128.00 Soin Feedback
Kabore-Cheptililik Road; Cheptililik-Kapkatit Road Public Works, Roads and Transport Completed 5,882,330.00 Soin Feedback
Ngeremwo-Chebotot Road; Maemba Road; Mbasa Road; Asenwet Road; Cheptagum Road; Laitigo primary Road; Koitaburot Road; Kapkatit Road; Cheptililik Road; Cheptororwo Road; - kipteran-Chepsengeny Sch; ndonyomare Road Public Works, Roads and Transport Completed 5,145,134.00 Soin Feedback
Tobentai-Kipyoren-Kapkormom Road;Moetik-Tobentai;Kap Macharia-Kipyoren Road,Kap Gravel-Chemaluk Road;Kaplelach-Kwondop Morsong-kaplelach Bridge -Chepsengeny Road Public Works, Roads and Transport Completed N/A Soin Feedback
Ngeremwo-Chebotot Road (6km) and Kwa Michael -Laitigo (4km) Public Works, Roads and Transport Completed 1,989,046.20 Soin Feedback
Kapkormom Pry - Kapkormom Dispensary Road - Kejiryet - Kaplaboitwa- Sideways - Kapchoge - Laitigo-Ngeremwo Road Public Works, Roads and Transport Completed 1,588,980.00 Soin Feedback
Kongeren river- Birirbei-Kapchelemei Road; Arap Chebochok-Arap Chepkoit; Kongeren pry Road; Kap Ingok-Birirbei Road; Chepkoson Road; Chepkoson-Kapsigilai Road; Kapchesilim-Kabokyek cattle dip road; Arap Seronik-sesgaa Road-Sesgaa-Kapsegut Road Public Works, Roads and Transport Completed 4,043,160.00 Soliat Feedback
Soliat corner-Kiptugumo pry Road Public Works, Roads and Transport Completed N/A Soliat Feedback
Kaplaba-kiptare-Kapcheptoo Road-kapkenyele Road;Kurabei-koyabeyon Road;Kurabei-Chesunut-Kapsigowo Road;Kapsigowo-Malanylem Road;Chesunut-Kapcherinyit Road Public Works, Roads and Transport Completed 6,572,000.00 Soliat Feedback
Tabrason-Kiptugumo Road Public Works, Roads and Transport Completed 6,459,424.00 Soliat Feedback
Kaboykek cattle dip - Kimugul Road; Kimugul koi Barak Road; kapsiongori - Arap ngeny Road; jolydab academy - kaprero Road; Arap Chepsengeny - Chemaluk Road; Chemaluk - Cheptembe Road; Kap injelio - Kap George Road Public Works, Roads and Transport Completed 3,443,664.00 Soliat Feedback
Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road Public Works, Roads and Transport Completed 5,471,400.00 Soliat Feedback
Kurabei - Mogonjet ; Kurabei/Arap Ngeno - Chepkoson; Soliat Dispensary/boys -Chepkoson Road; Soliat Boys Sec School -Soliat AGC road Public Works, Roads and Transport Completed 7,529,400.00 Soliat Feedback
AGC Chesunet - Kapchesengeny Road; Motero pry - Kapkitandyus Road; Kapcherunyit - Kurabei Road Public Works, Roads and Transport Completed 3,724,052.00 Soliat Feedback
Kapingok-Kapchepkaigat -Kurabei road; Arap Chebochok-Arap chepkoit road: Kapchelemei-Kongeren river-Salgaa road: Soliat Boys Sec School-Turguito bridge road: Kongeren pry – Mirmiro: Kapshongiroi - Arap Ngeny: Kaboykek cattle dip - Kapchesilim - Kapsigilai Road : Kaptelo – Chelogong Road Public Works, Roads and Transport Completed 1,352,400.00 Soliat Feedback
Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road Public Works, Roads and Transport Completed 3,211,800.00 Soliat Feedback
Kapnyakitari Centre - Kiptugumo Dispensary Road Public Works, Roads and Transport Completed 5,893,600.00 Soliat Feedback
Kaplengeny - Kiptugumo Road; Tabrasin - Kiptugumo dispensary Road; Kapneesoi - Highway - Moretik - Arap Tuei Road; Soliat Boys - Kongeren river- Kapchelemei Road; Kongeren pry - Mirmiro Road; Siriat – Kapsisirwo Road Public Works, Roads and Transport Completed 1,384,000.00 Soliat Feedback
Shauri Yako - Kapkenyelo - Kipcheiyet Road; Kapkara - Karap Cheruiyot Road; Kapchesengeny - Chepyegon - Kapchepchilat Road Public Works, Roads and Transport Completed 4,969,156.00 Soliat Feedback
Extension Kenya 1 - Cattle dip - Quarry Road Public Works, Roads and Transport Completed 5,182,888.00 Soliat Feedback
Kapchemirmir TBC - Cherire TBC - Kapsewe Road Public Works, Roads and Transport Completed 3,696,476.00 Sigowet Feedback
Kapchanga - Taiwet - Centre Juu Road Public Works, Roads and Transport Completed 3,520,910.00 Sigowet Feedback
Kapchemirmir TBC - Cherire TBC - Kapsewe Road Public Works, Roads and Transport Completed 822,094.32 Sigowet Feedback
Kakibei-KMC - Kuche - Kiptenden - Rwandit - Kapchanga Road Public Works, Roads and Transport Completed 2,616,416.00 Sigowet Feedback
Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) Public Works, Roads and Transport Completed 1,080,000.00 Sigowet Feedback
Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) Public Works, Roads and Transport Completed 2,337,300.00 Sigowet Feedback
Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road Public Works, Roads and Transport Completed 3,030,540.00 Sigowet Feedback
Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road Public Works, Roads and Transport Completed 2,918,972.00 Sigowet Feedback
Sinendet Cherire TBC Road; Kapchemirmir Road; Centre juu - Taiywet - Kapchanga Road; Kiptere market Roads. Public Works, Roads and Transport Completed 5,528,300.00 Sigowet Feedback
Sisionik - Chemegong - Kapndege Road Public Works, Roads and Transport Completed 6,434,200.00 Sigowet Feedback
Kaplelartet-Tililbei Road;Chepkemel-Sumeek Road; Sumeek-Tililbei Road. Public Works, Roads and Transport Completed 2,958,163.00 Kaplelartet Feedback
Mutwot - Kokwasoi - Emdit Road Public Works, Roads and Transport Completed 6,645,260.00 Kaplelartet Feedback
Chepkemel Centre - Arap Cheruiyot - Sumeek Road Public Works, Roads and Transport Completed 6,633,960.00 Kaplelartet Feedback
Kaplelartet - Arap Cheruiyot - Sumeek Road Public Works, Roads and Transport Completed 6,553,340.00 Kaplelartet Feedback
Mutwot - Kokwasoi - Emdit Road; Chepkemel Center - Karap Cheruiyot Road; Kapmorok - Chepkemel TBC - Centre Road; Chepchelalemit - Sime Road Public Works, Roads and Transport Completed 2,014,000.00 Kaplelartet Feedback
Mutwot - Kapkawa- Kiplekwa pry School Road Public Works, Roads and Transport Completed 3,498,000.00 Kaplelartet Feedback
Kaplelartet - Kapsomboch Primary School Road Public Works, Roads and Transport Completed 2,753,400.00 Kaplelartet Feedback
Kona Sita - Sumeek Road Public Works, Roads and Transport Completed 3,975,000.00 Kaplelartet Feedback
Rehabilitation and Construction of Lelagoi- Yanja- Karap Maina Road 4.5Km Public Works, Roads and Transport Completed 8,578,680.00 Sigowet Feedback
Routine Maintenance of Kap Ezekiel Centre- Kipkwes Pry School-Kipchorian River- Kipchorian Bridge Road Public Works, Roads and Transport Completed 1,113,000.00 Ainamoi Feedback
Routine Maintenance of Yasomok-Kamelilo Coffee Factory-Kiburet Pry School Road Public Works, Roads and Transport Completed 1,324,708.00 Ainamoi Feedback
Ainamoi centre-berea AIC Church-Pakao-Delivarance-Kap Jona Public Works, Roads and Transport Completed 1,281,920.00 Ainamoi Feedback
Grading Of Kipchimchim Sec-Kabotris Road, Kabotris-Kondamet Road,Kapcheptoror-Sirimdo Road Public Works, Roads and Transport Completed 2,455,700.00 Kipchimchim Feedback
Routine Maintenance of Darajet-Barekeiwet dinspensary-Arap Maina-Mungenik road Public Works, Roads and Transport Completed 6,423,960.00 Soliat Feedback
Construction of 28m of 600mm and twin 900mm Cross Culvert at Chepkemel Cetre- Arap Cheruiyot- Sumeek Road Public Works, Roads and Transport Completed 7,602,908.00 Kaplelartet Feedback
Acquisition of land for expansion of water treatment works Lands, Housing and Physical Planning Completed 1,641,160.00 Kapkugerwet Feedback
Consultancy services for the preparation of Local Physical and Land Use Development plans Lands, Housing and Physical Planning Completed 801,360.00 Kapkugerwet Feedback