| Cherire - Kisabei Pry- Kiptegan Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,880,704.00 |
Kapsoit |
Feedback |
| Extension Kenya 1 - Cattle dip - Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,182,888.00 |
Soliat |
Feedback |
| Kap Eli - Off B1 - Koiyet - Chesanga -Hass Petrol Station- Emanuels Agc Chucrh- Kiboko- Off B1 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,411,600.00 |
Kipchebor |
Feedback |
| Kapchemirmir TBC - Cherire TBC - Kapsewe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,696,476.00 |
Sigowet |
Feedback |
| Satelite - Matobo Primary-Nyagacho - Nursery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
911,900.00 |
Kipchebor |
Feedback |
| Kapchanga - Taiwet - Centre Juu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,520,910.00 |
Sigowet |
Feedback |
| Baraka Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
566,575.00 |
Kipchimchim |
Feedback |
| Kapchemirmir TBC - Cherire TBC - Kapsewe Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
822,094.32 |
Sigowet |
Feedback |
| Taiwet - Kipsutet Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
140,000.00 |
Kipchimchim |
Feedback |
| Kakibei-KMC - Kuche - Kiptenden - Rwandit - Kapchanga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,616,416.00 |
Sigowet |
Feedback |
| Kap Joseah- Kipsakwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,021,000.00 |
Kipchimchim |
Feedback |
| Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,080,000.00 |
Sigowet |
Feedback |
| Kapango- Simotwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
632,000.00 |
Kipchimchim |
Feedback |
| Sigowet - Kaplieli - Sisionik (3Km); Cherote - Kigomba Road (4.1km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,337,300.00 |
Sigowet |
Feedback |
| Routine Maintenance of Kapsegut- Jerusalem Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,645,020.00 |
Cheboin |
Feedback |
| Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,030,540.00 |
Sigowet |
Feedback |
| Routine Maintenance of Ngororga 08 tbc- cheptigit- Sahangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,671,200.00 |
Cheboin |
Feedback |
| Orgong - Kaplieli - Kalelbusienduk - Kapchanga Road; Tamboiyot - Kitenden - Kebeneti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,918,972.00 |
Sigowet |
Feedback |
| Routine Maintenance of Maburo- Malinja- Bakoiyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Cheboin |
Feedback |
| Sinendet Cherire TBC Road; Kapchemirmir Road; Centre juu - Taiywet - Kapchanga Road; Kiptere market Roads. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,528,300.00 |
Sigowet |
Feedback |
| Routine Maintenance of Off C23- ChemosIt- Chebarema- Kabitungu TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,607,424.00 |
Chemosot |
Feedback |
| Sisionik - Chemegong - Kapndege Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,434,200.00 |
Sigowet |
Feedback |
| Routine Maintenance of Off C23- Chemosot Centre- Arap Irongi- Chebulu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,920,000.00 |
Chemosot |
Feedback |
| Kaplelartet-Tililbei Road;Chepkemel-Sumeek Road; Sumeek-Tililbei Road. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,958,163.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Off C23- Kaminjeiwet- Chebulu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,279,000.00 |
Chemosot |
Feedback |
| Mutwot - Kokwasoi - Emdit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,645,260.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Nairobi Ndogo- Kimauto Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
910,000.00 |
Cheplanget |
Feedback |
| Chepkemel Centre - Arap Cheruiyot - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,633,960.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Tabaita- Kap Johna Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,598,400.00 |
Cheplanget |
Feedback |
| Kaplelartet - Arap Cheruiyot - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,340.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Twoliot- Church Of Christ- Tangit- Sebetet- Ainapkarik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,800,000.00 |
Cheplanget |
Feedback |
| Mutwot - Kokwasoi - Emdit Road; Chepkemel Center - Karap Cheruiyot Road; Kapmorok - Chepkemel TBC - Centre Road; Chepchelalemit - Sime Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,014,000.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Nuru- Meturi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
865,000.00 |
Kapkatet |
Feedback |
| Mutwot - Kapkawa- Kiplekwa pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,498,000.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Chebitet- Kap Tebengwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,183,180.00 |
Kapkatet |
Feedback |
| Kaplelartet - Kapsomboch Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,753,400.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Chebitet Sign Post- Sachangwan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,650,000.00 |
Kapkatet |
Feedback |
| Kona Sita - Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,975,000.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Sachangwan- Mabasi TBC- Ketingoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,987,000.00 |
Kisiara |
Feedback |
| Rehabilitation and Construction of Lelagoi- Yanja- Karap Maina Road 4.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,578,680.00 |
Sigowet |
Feedback |
| Routine Maintenance of Keregut- Sikongo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,964,800.00 |
Kisiara |
Feedback |
| Rehabilitation of Drainage Structures and access roads in Kapkatet Market |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,614,856.00 |
Kapkatet |
Feedback |
| Routine Maintenance of Machorwa- Chomisian- Charera |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,730,000.00 |
Kisiara |
Feedback |
| Rehabilitation and Construction of Kapias- Timbilil-Kamotos Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,457,528.00 |
Kunyak |
Feedback |
| Routine Maintenance of Kelelwa- Kimugul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,672,480.00 |
Kisiara |
Feedback |
| Routine Maintenance of Kap Ezekiel Centre- Kipkwes Pry School-Kipchorian River- Kipchorian Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,113,000.00 |
Ainamoi |
Feedback |
| Routine Maintenance of Reresik Pry- Kiprichait- Roret Boys- Chebululu- Tulwet- Ngainet Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,608,880.00 |
Kisiara |
Feedback |
| Routine Maintenance of Yasomok-Kamelilo Coffee Factory-Kiburet Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,324,708.00 |
Ainamoi |
Feedback |
| Routine Maintenance of America- Sinendet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,151,160.00 |
Litein |
Feedback |
| Ainamoi centre-berea AIC Church-Pakao-Delivarance-Kap Jona |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,281,920.00 |
Ainamoi |
Feedback |
| Routine Maintenance of Bushmouth- Samuget- Kap Brown - TTC Valley Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,646,520.00 |
Litein |
Feedback |
| Grading Of Kipchimchim Sec-Kabotris Road, Kabotris-Kondamet Road,Kapcheptoror-Sirimdo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,455,700.00 |
Kipchimchim |
Feedback |
| Routine Maintenance of Kapkarin- Chesoen TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,503,600.00 |
Litein |
Feedback |
| Construction of Kiptabo TBC-Chepkosilen sec-Ainap Isirek-Bondeni road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,329,016.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Ainapset AIC- Kapbomwo- Rungut Pry- Chepsembe- Tendwet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,704,050.00 |
Litein |
Feedback |
| Construction of Chomisian- Ngariet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,629,200.00 |
Kisiara |
Feedback |
| Routine Maintenance of Chepkitach- Kipsagetet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,279,860.00 |
Tebesonik |
Feedback |
| Construction Of Chepkitar Centre- Toroton Boundary- Yalla Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,516,740.00 |
Chilchila |
Feedback |
| Routine Maintenance of Kibaranji- Karapngerer Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,434,628.00 |
Tebesonik |
Feedback |
| Grading of Chilchila- Murgut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,484,640.00 |
Chilchila |
Feedback |
| Routine Maintenance of Kibolgong-Tiritab Eito Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,326,050.00 |
Tebesonik |
Feedback |
| Kisumu Ndogo-TBC-Melit r, Kapsamba-Kamasian Road, Kimungen Road,Dispensary-KamasianRoad, maso Market-Maso sch Road; Maso Shopping -Maso Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,656,736.00 |
Kamasian |
Feedback |
| Routine Maintenance of Silva Junction- Siongi- Kampala Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,697,305.00 |
Tebesonik |
Feedback |
| Kiprengwe Pry School- Miti Moja Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,189,694.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Chebirirbei Centre- Chepnagai Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,603,520.00 |
Kabianga |
Feedback |
| Masaita - Itoik - 936 farmers Road 5.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,078,550.00 |
Londiani |
Feedback |
| Routine Maintenance of Kapsisiywa Pry- Kipseger TBC- Sinonin Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,359,540.00 |
Kabianga |
Feedback |
| Routine Maintenance of Mobego B TBC- Nyabangi Sec. School- Kolonget Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,951,040.00 |
Kabianga |
Feedback |
| Routine Maintenance of Kaplutiet- Kiptuigo- Ainabisarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,503,600.00 |
Kabianga |
Feedback |
| Routine Maintenance of Bot Musa- Cheboin- Kimolwet- SBI- Kugerwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,882,712.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Cheptororiet- Arap Tanui Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,167,040.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Kamungwana- Bae-kaplemeywet- Kapnandet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,037,140.00 |
Kapsuser |
Feedback |
| Routine Maintenance of Changoi Road- Boito- Kapburkei- Mlimani Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,251,970.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Cheswerta AGC- Chepkutbei Bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,149,890.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kaprongori- -Kaproret Road; Tulwet-Ngianet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,925,328.00 |
Kisiara |
Feedback |
| Routine Maintenance of Kipsolu pry- Soweto TBC- Michingilwet- Cherigat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,551,740.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Darajet-Barekeiwet dinspensary-Arap Maina-Mungenik road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
6,423,960.00 |
Soliat |
Feedback |
| Routine Maintenance of Kosachmwai- Chemoset Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,098,550.00 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Off D312-938 Girls Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,288,392.00 |
Chepseon |
Feedback |
| Routine Maintenance of Cheptenye Sign post- Off Sosiot- Keben Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,801,748.00 |
Waldai |
Feedback |
| Routine Maintenance of Mark Peter- Off Kabianga- Chemumbe- Kaborok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
11,192,013.00 |
Waldai |
Feedback |
| Routine Maintenance of Off Cheribo- Ngariet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
350,000.00 |
Waldai |
Feedback |
| Routine Maintenance of Off D314- Mutanya Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,794,100.00 |
Chepseon |
Feedback |
| Routine Maintenance of 938 - Central Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,420,780.00 |
Chepseon |
Feedback |
| Routine Maintenance of Kipyobob Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,214,000.00 |
Chepseon |
Feedback |
| Routine Maintenance of Chesinende Catholic- Koibarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,596,712.00 |
Chepseon |
Feedback |
| Routine Maintenance of D314- 938 Girls Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Chepseon |
Feedback |
| Routine Maintenance of Off B1- Ewat Kap Maxwel - Catholic- Kiplekwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,438,000.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Off C35- Ndiwa Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,194,000.00 |
Kedowa/Kimugul |
Feedback |
| Routine Maintenance of Slaughter House- Towet Bridge- Maridany Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,422,100.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Kapkondoo Centre- Silibwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
717,950.00 |
Londiani |
Feedback |
| Routine Maintenance of Kapcheplanga Centre- Martina Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,114,000.00 |
Londiani |
Feedback |
| Routine Maintenance of Elite Primary School- Chebangang Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,288,730.00 |
Londiani |
Feedback |
| Routine Maintenance of Sachangwan- Kap Tilia Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,883,590.00 |
Londiani |
Feedback |
| Routine Maintenance of Barotion- Sawmill- Lelsotet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,724,750.00 |
Londiani |
Feedback |
| Routine Maintenance of Burutu- Kamiwa- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,210,500.00 |
Chilchila |
Feedback |
| Routine Maintenance of Factory Junction- Kamiwa- Kapkese Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,642,380.00 |
Chilchila |
Feedback |
| Routine Maintenance of Tunnel- Chumbeek Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,783,630.00 |
Chilchila |
Feedback |
| Routine Maintenance of Mutai- Lelei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,314,020.00 |
Kamasian |
Feedback |
| Routine Maintenance of Nyairobi- Songonyet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,627,540.00 |
Kamasian |
Feedback |
| Routine Maintenance of Murau Centre- Bakery Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,101,700.00 |
Kamasian |
Feedback |
| Routine Maintenance of Off C35- Segetet- Murau Brige Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,180,000.00 |
Kipkelion |
Feedback |
| Routine Maintenance of Kamore- Kap Sephania Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,268,400.00 |
Kipkelion |
Feedback |
| Routine Maintenance of Kap Onyango-Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,423,800.00 |
Kunyak |
Feedback |
| Routine Maintenance of Sachangwan- Mariwa Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,211,800.00 |
Kunyak |
Feedback |
| Routine Maintenance of Chesino- Kapkormom- Koiyabei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,420,720.00 |
Soin |
Feedback |
| Routine Maintenance of Kipsitet Cattle Dip- Asenwet-Kap Musar Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,749,000.00 |
Soin |
Feedback |
| Routine Maintenance of Chemaluk- Gladys Canteen- Bokwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,352,400.00 |
Soin |
Feedback |
| Routine Maintenance of Soliat Corner – Kaplengeny – Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,363,060.00 |
Soliat |
Feedback |
| Routine Maintenance of R47- Chebaran Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,949,360.00 |
Soliat |
Feedback |
| Routine Maintenance of Cheramor Centre- Kipkerer Bridge- Arap Bore Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
735,000.00 |
Soliat |
Feedback |
| Routine Maintenance of Tarajet- Baregeiwet Dispeensary- Karap Maina- Mungenik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
667,800.00 |
Soliat |
Feedback |
| Routine Maintenance of Salgaa- Kongeren River- Kap Laiba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,360,800.00 |
Soliat |
Feedback |
| Routine Maintenance of Kakibei- Kapchemirmir- Mutata- Chepkochun Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,216,900.00 |
Sigowet |
Feedback |
| Routine Maintenance of Sisionik- Tumoyot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,600,412.00 |
Sigowet |
Feedback |
| Routine Maintenance of ML 10- Chebetet- Kalyongwet TBC Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,503,850.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Mutwot - Emdit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,190,012.00 |
Kaplelartet |
Feedback |
| Routine Maintenance of Kaplelartet Chief’s Office- Tabaita Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,166,000.00 |
Kaplelartet |
Feedback |
| Construction of Kerego Box Culvert at Kwa Silvan- Kids home - Kerego |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,082,900.00 |
Kapkugerwet |
Feedback |
| Construction of Ainapkosobin 3X900mm cross culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,441,600.00 |
Kapkugerwet |
Feedback |
| Construction of Twin 900mm cross culvert at Wema - Chemugusu Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,179,800.00 |
Kapkugerwet |
Feedback |
| Construction of Torsogek Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,794,800.00 |
Kapsoit |
Feedback |
| Construction of Jordan Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,816,604.00 |
Kapsoit |
Feedback |
| Construction of Mjini Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,609,944.00 |
Kipchebor |
Feedback |
| Construction of Gokul- Kamelilo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,264,692.00 |
Ainamoi |
Feedback |
| Installation of 10 lines of 600mm along Arap Cheruiyot- Maberiat AGC Church Road, Budalangi-Totlilet- Mureret Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,015,000.00 |
Ainamoi |
Feedback |
| Construction of Koigaron Twin 900mm cross culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,251,860.00 |
Kapsaos |
Feedback |
| Construction of Buchenge Deck for Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,696,800.00 |
Kapsaos |
Feedback |
| Construction of Kisabei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,124,500.00 |
Kapsoit |
Feedback |
| Construction of Sugutek Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
391,680.00 |
Kapsoit |
Feedback |
| Construction of Kapsinei Mini Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,120,000.00 |
Kapsoit |
Feedback |
| Construction of Kapsakwa Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,028,000.00 |
Kipchimchim |
Feedback |
| Construction of Kimugen Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,360,000.00 |
Kipchebor |
Feedback |
| Construction of 600mm cross culvert to Kaborus - Chabasta road 2km |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,006,800.00 |
Cheboin |
Feedback |
| Construction of 600mm cross culvert to Koitamat - Cheptenteniet road 3km |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,900,000.00 |
Cheboin |
Feedback |
| Construction of Machorwa- Kapcheluch Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,256,960.00 |
Kisiara |
Feedback |
| Construction of Senetwet Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
8,492,300.00 |
Cheplanget |
Feedback |
| Construction of Kisiara -Kap nyongo Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,300,900.00 |
Chemosot |
Feedback |
| Construction of Kaptebengwet - Cheptangulgei Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,347,060.00 |
Kapkatet |
Feedback |
| Construction of Chematich-Kaptirbet Twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Kapkatet |
Feedback |
| Construction of Kabusienduk Twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,197,600.00 |
Tebesonik |
Feedback |
| Construction of Chesebet Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,308,360.00 |
Kabianga |
Feedback |
| Construction of Nyabangi Road Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,216,040.00 |
Kabianga |
Feedback |
| Construction of twin 900mm cross Culvert at Arap Kitur - Arap Serem Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,701,830.00 |
Kapsuser |
Feedback |
| Construction of Twin 900mm cross Culvert at Cheboin river |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,503,150.00 |
Kapsuser |
Feedback |
| Construction of Twin 900mm cross Culvert at Arap Samityuk - Kap Christopher Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,226,000.00 |
Kapsuser |
Feedback |
| Construction of Chepkutbei Pipe Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,249,000.00 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kipkeremwo twin 900mm Cross Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
5,992,400.00 |
Chepseon |
Feedback |
| Construction of twin 900mm cross culvert at 938 dip Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,428,720.00 |
Chepseon |
Feedback |
| Construction of Silibonik-Kiplekwa Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
10,526,200.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Off B1 - Lembel Culverts |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
7,120,904.00 |
Kedowa/Kimugul |
Feedback |
| Construction of Cross Culverts to Chebitet- Kipyemit Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,590,000.00 |
Kedowa/Kimugul |
Feedback |
| Construction of precast culvertsat Nairobi - Saramek Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,969,330.00 |
Londiani |
Feedback |
| Construction of precast culvert to Chelalang - Kondamet Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,731,680.00 |
Londiani |
Feedback |
| Construction of precast culverts to Kafinch - Sotik Road |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,204,800.00 |
Londiani |
Feedback |
| Construction of Lelsotet Bridge |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,632,400.00 |
Londiani |
Feedback |
| Construction of Koisagat - Chilchila Boundary Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,460,060.00 |
Chilchila |
Feedback |
| Construction of Segetet - Kitobe Twin twin 900mm cross Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
3,325,250.00 |
Kipkelion |
Feedback |
| Construction of Mogire Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
7,624,000.00 |
Chilchila |
Feedback |
| Construction of Soi Mingin - Blue Hills Cattle Dip Twin 900mm Cross Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
4,791,300.00 |
Kipkelion |
Feedback |
| Construction of Minihaha Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
743,900.00 |
Kunyak |
Feedback |
| Construction of Nunda Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,158,400.00 |
Soin |
Feedback |
| Construction of Kapaiwo twin 900mm Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,595,000.00 |
Soliat |
Feedback |
| Construction of Kongeren twin 900mm Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
6,164,640.00 |
Soliat |
Feedback |
| Construction of Sombicho Twin 900mm Culverts Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
5,117,200.00 |
Soliat |
Feedback |
| Construction of Orgony Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
8,391,800.00 |
Sigowet |
Feedback |
| Construction of Sime Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
1,608,900.00 |
Kaplelartet |
Feedback |
| Construction of School of Excellence Box Culvert |
To improve road safety and accessibility |
Public Works, Roads and Transport |
Completed
|
2,650,000.00 |
Kaplelartet |
Feedback |
| Budalangi-Bechulelach-Kipchorian rd; Kaptongilo-Cheplit rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,158,400.00 |
Ainamoi |
Feedback |
| Kiburet-Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,988,720.00 |
Ainamoi |
Feedback |
| Ketpyse rd;Kamelilo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
224,774,768.60 |
Ainamoi |
Feedback |
| Ainamoi Polytechnic - Kapsengerini rd (2Km); Ainamoi Sub County Hospital (0.5Km); Kapjonah - Bagao rd (5Km); Ainamoi bridge – Maseriat AGC Rd (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
15,363,827.10 |
Ainamoi |
Feedback |
| Ainamoi Shopping centre- Ainamoi pry- Itibet road; Senetwet - Arap Cheruiyot - Maberiat FGC rd; Kamelilo coffee factory - Kamelilo pry - Arap Ngeny rd; Kamelilo pry - Koisirat rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
46,884,040.00 |
Ainamoi |
Feedback |
| Lelechwet - Mureret rd; Ainamoi town |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
8,941,017.66 |
Ainamoi |
Feedback |
| Ainamoi Market - Ainamoi pry - Itibet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
25,984,788.64 |
Ainamoi |
Feedback |
| Senetwet - Arap Cheruiyot - Maberiat FGK rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
242,660.00 |
Ainamoi |
Feedback |
| Kakobirit - Karapbii rd; Kapkeregu - Budalangi - Kapcosmas - Sitini rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,153,168.00 |
Ainamoi |
Feedback |
| Lelechwet - Arap cheboiyon rd; Kaptongilo - Kapchepngok rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,058,746.00 |
Ainamoi |
Feedback |
| Kamelilo factory - Karapngeny rd; Kamelilo pry sch - Kapseremiot river rd; Kapkenat - Kapboniface Kilii rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,914,380.00 |
Ainamoi |
Feedback |
| Ainamoi Centre rd/Bagao |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,444,376.00 |
Ainamoi |
Feedback |
| Keongo Pry School ground leveling |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,402,200.00 |
Kapkugerwet |
Feedback |
| Keongo-Kapsigong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,950,340.00 |
Kapkugerwet |
Feedback |
| Chemugusu rd; Laibon Town rds; Keongo - Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,309,772.00 |
Kapkugerwet |
Feedback |
| Roads at Kapkurgwet ward |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,019,544.00 |
Kapkugerwet |
Feedback |
| Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,231,788.00 |
Kapkugerwet |
Feedback |
| Arap Bii - Chemugusu Rd (2km); TG 12TBC - Kapgregory (2km); Keongo FGCK - Kapturungi rd (2km; Masengo - Laibon rd (2km); Kondamet - Agc - Ngororoga rd (2km); Nukiat - Catholic - Keongo rd (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,892.00 |
Kapkugerwet |
Feedback |
| Keongo - Quentete - Sumeiyon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
712,320.00 |
Kapkugerwet |
Feedback |
| Chemugusu - Satelite rd; Tea point - Paksonrd; Eland Academy - Majengo - St. Patrick rd; Site and Service- Kericho Academy - Talai rd; Tea Hotel - Kimugu Treatment works rd; Quintete - Talai rd; Off B1 - Duka Moja Junction rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,664,200.00 |
Kapkugerwet |
Feedback |
| Kapsilangwa-Ainapsosiot rd;Kapoldoit-Kaprewet rd;Chesumot rd;Binyiny rd ;Mureret rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
600,600.00 |
Kapsaos |
Feedback |
| Kipsigori - Kapsaos Centte rd; Off C35 - Lamaiyat pry - Torochgaa brdige rd; Kapngetuny rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,017,604.00 |
Kapsaos |
Feedback |
| Tabet-Koigaron-Mureret-Kipsigori-Kamuungei road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,293,900.00 |
Kapsaos |
Feedback |
| Kapsoit-Kaboswa- Kimasian-Kiboibei-Slaughter hse road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,135,256.00 |
Kapsoit |
Feedback |
| mongo- Chepkut rd; Kenegut-Chepkel TBC-Chesire rd; Kenegut MKT-Kisabei Pry-Kiptegan Nursery rd; Kapsoit- Kaboswa-Kimasian-Kiboibei-Slaughter rd; Off b1-Ngecherok AGC-Chepkurbet Pry road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,483,160.00 |
Kapsoit |
Feedback |
| Off B1-Chemobei rd;Off B1-Chepkurbet AGC;Off B1-Ngecherok AGC rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,201,828.00 |
Kapsoit |
Feedback |
| off E222-Kaptoroi-Kiptenden rd;Muiwek-Tuiyobei rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,034,020.00 |
Kapsoit |
Feedback |
| Kara Tegerei - Gabel rd; Tilrap Malit - Kirongisyet rd; John Bett - Kirongisyet rd; Kaptimothy - Chelule rd; Chemoibei pry - Koitabai rd; Arap Kenei - Kiptendon Rd; Kiptendon - Lemeiywet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,742,792.00 |
Kapsoit |
Feedback |
| Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
207,600.00 |
Kapsoit |
Feedback |
| Water tank - Sachangwan - Ngecherok AGC - Off B1 - Sachangwan - Chepkubet pry sch; Off B1 - Full Gospel Church - Samutet central; Off B1 - Kongosiet - Siitotwet; Sitotwet - Jordan rd; Off B1 - Chepsoo rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,890,916.00 |
Kapsoit |
Feedback |
| Kichinjet - Kaboswa rd; Karap Tergei - Chepsoo rd; Kamundu rd; Samutet pry - Chemobei rd; Samutet - Kappeter rd; Karap Teregei rd; Tiles - Karap Barjwot rd; Toro - Kameshak rd; Sitotwet - Kirongishet rd; Koitabai rd; Karap Tererei - Gable rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,320,760.00 |
Kapsoit |
Feedback |
| Sailo-Chepcholiet Road; Chesumei-Tugunon Road; Sebere-Chesumei Road; Kapsegut- Nyambuko Road; Cherendet-Kiptenden Road. |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,048,400.00 |
Chepseon |
Feedback |
| Mandera-Kipketes Road; Chepcholiet-Tugunon Road; Leberer-Mile Tano; Kamachungwa-Factory Road; Momoniat-Chepchabai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,236,820.00 |
Chepseon |
Feedback |
| Kiptenden - Kamarus Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,320,760.00 |
Chepseon |
Feedback |
| Kaptenet - Chebwareng - Kipchorian Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,433,480.00 |
Chepseon |
Feedback |
| Kaptenet - Fredrick Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,761,840.00 |
Chepseon |
Feedback |
| Kapsokwe - De;iverance - Kipyoptop Road; Kaptenet - Fredrick - Scheme Road; Kapeli - Tilito - Kaisugu Road; Kapfredrick - Ketienya - Chebochok Road; Kapketungor - Maseti Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,758,660.00 |
Chepseon |
Feedback |
| Off B1 Wima Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,924,540.00 |
Chepseon |
Feedback |
| Tenbwet - Complex Road; Kiprengwe - Miti mbali Road; Kipsigori - Kiprengwe corner Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
742,000.00 |
Chepseon |
Feedback |
| Siwot - Motanya; Cheboror;Kondamet/ Mutanya - Kapkawa Road ; C woRoad - Ka[somting - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,520,940.00 |
Chepseon |
Feedback |
| Siwot Motanya |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,434,480.00 |
Chepseon |
Feedback |
| B1-Kedowa-Ewat road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,371,330.00 |
Kedowa/Kimugul |
Feedback |
| Kedowa River farm-Kimaut-Barngoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,313,920.00 |
Kedowa/Kimugul |
Feedback |
| Ewat - Forest Road; Ndarugu - Kapchebotibiot - Timbilet Road; Kiprengwe - Miti moja - Kapmabwai Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,313,920.00 |
Kedowa/Kimugul |
Feedback |
| Kipyemit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,524,060.00 |
Kedowa/Kimugul |
Feedback |
| Off B1 - Tulwap Road; Road Unit - Kolonget Road; Nyakinywa Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,702,561.00 |
Kedowa/Kimugul |
Feedback |
| Kaap Nashon - Kipkoiyo pry (3km); Off C35 - Wispers - Kiptenden Road (2.5km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,099,500.00 |
Kedowa/Kimugul |
Feedback |
| Rehabilitation and Construction Drainage Strutures and Tarmacking of 936 Town |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,700,240.00 |
Kedowa/Kimugul |
Feedback |
| Lembel Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
830,400.00 |
Londiani |
Feedback |
| Jagoror center- Kerembe road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,162,200.00 |
Londiani |
Feedback |
| Jagoror center-Cypress Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,727,576.00 |
Londiani |
Feedback |
| Off C35 - AIC 936 Academy-Lolongbei Pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,272,000.00 |
Londiani |
Feedback |
| off C35 -Engineer Rotich-Nukiat-Link 35 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,639,820.00 |
Londiani |
Feedback |
| Construction of 28m of 600mm and twin 900mm Cross Culvert at Chepkemel Cetre- Arap Cheruiyot- Sumeek Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,602,908.00 |
Kaplelartet |
Feedback |
| Kabarak ECDE - Sachangwan Road 2.8km; Off D 254 -Gishorio Road 1.5km; Kapsenda - Lolonbbei Road 1.3km; Kapchepkorio - Quarry Road0.4km; Kapsenda Dispensary - Chebaraa Road 1.7km; Satek - Langat Road 1.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,541,324.00 |
Londiani |
Feedback |
| Barotion pry - Lelsotet Road; Barotion pry - Arap Chief Road; Kaptien - Sorget Road; Miti mingi - Kwa DC - Kaptich Road; |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,913,048.00 |
Londiani |
Feedback |
| Sirako - Jerusalem Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,163,400.00 |
Londiani |
Feedback |
| Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,814,156.00 |
Londiani |
Feedback |
| Chinese - Kapsegut Road; Lalanggbei Road; Kapjunior - Kiplangat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,589,548.00 |
Londiani |
Feedback |
| Tegat - Lelsotet Road; Dr Ngeno-Roadunit |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,520,400.00 |
Londiani |
Feedback |
| Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,252,418.00 |
Tendeno/Sorget |
Feedback |
| Turienga - Barotion boRoader Road; Off Lemotit Road - Njia Mpya - Link C35 Road; Kapcheplanga sec sch - Kapcheplanga pry - Kap Musa - Good luck Academy Road; Kap matthew - Kamaritim Road; Kapkondoo Junction - Kapcentre quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,815,400.00 |
Tendeno/Sorget |
Feedback |
| Tendeno dip-Kariuki Road;Tumaini sec-Kericho boRoader-Nominated MCA Road;Kienyere Road-Ndoiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,601,180.00 |
Tendeno/Sorget |
Feedback |
| Centre one-Cheborge Road;CheborgeMarsin Road;Miti tatu-Lovito-Kolonget Road;Kongoni dispensary-Chepkok Road;Singoi-Gwitu pry Road;Ayondi-Atiokigit river Road;Chabaya-Kichagi Road;Chabaya-KiMuremi Munga Road;Leltae-Kosigu-Captain Road;Towet-Kimager Road;Cheriro-wokter-mokiolok Road; E254-kk-Mwano-Muoroto-Siangatia Road;Chege-Wamutu-Wamagi Road;Zakao-kag church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,578,400.00 |
Tendeno/Sorget |
Feedback |
| Kapsabet-Bagdad Road;Muikamba-David Mtaro Road;Emmanuel-PCA Road-Kaburi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,602,720.00 |
Tendeno/Sorget |
Feedback |
| Tendeno-SubukiaRoad;Subukia-Wambare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,807,140.00 |
Tendeno/Sorget |
Feedback |
| Miti - tatu - Benditai Road; Chebusit main road - JXN road; Chemororen - Kamau Nubery Road; Rajab - CHEMWOKTER ROAD; Chebaibai - Kapkimoi nRoad; Kimoi - Kamaua; Rajab - Busara Road; Chebaibai - Ximboiyo Road; Cheborgei - Seronei Road; Seronei - Benditai BoaRoader Road; Mikingo - Bridge Road; Maritim - Kimoi Road; Sach 4 - Barno Road; Bitok - Yegen Selim -KAcheyat Road; KAptembwo - Forest Road; Maranget - Chemwokter Road; Chebubto - Cheriro Road ; Chebaibai - Louito Road and Simboiyon Sach 4 Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,999,960.00 |
Tendeno/Sorget |
Feedback |
| Kahuho Road; Tumaini Road; Kaigemi Ak foRoad Road; Wangare- MCA Road; Mukamba - mulkaroubo Road; Mahinga - Borchek Road; Subukia - Independent Road; Mburu - Dave Road; Independent - Isili - Tendeno pry Road; Nginga - Kamwingi Road; Independent church - Nginga Jxn Road; Micheal JXN- Mwangi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,175,040.00 |
Tendeno/Sorget |
Feedback |
| Construction of Kamwingi II - Kiangundo Road;Kamwingi pry - KIMARI - Singati Road; Centre 1 - Majani Road; Taarifa corner Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,575,028.00 |
Chilchila |
Feedback |
| Kaigai Road; UPC raod; Majani sawmil Awii; Amos Saiz Road; Independent church - Dam Road; Catholic main -Cherer diversion Road; Macam Milka - Koigo Road; Cheres Road; Chebangang Road; Josh dam Road; Chane rs; Upendo Road; Akimani Road; Zakayo Road; Mama Mike Road; Mrs Langat - Forest Road; Botpla Road; Mama wangari cam Daniel Road; Speaker Kipronon Road; Kwa Daniel Road; Daniel Forest Road; Centaa Roads; Kipkelion works; Barsiele Road; Mau Road; Power Road; owet Guito Road; Ngingo - highway Road; Peters - gwitu Road; Bungowma - Roisili Road; Assembly Church Bridge - Bridge cheres Road; Bridge Road; Assembly Church - bridge Road; Cheres - Bridge Road; Mama chelimo Al shabaab Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,473,400.00 |
Chilchila |
Feedback |
| Kwa Chief-Jagoror Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,363,196.00 |
Chilchila |
Feedback |
| Kokwet-Toroton-Kipsasur Road;Bomore-Kap Chapati Road;Kokwet Centre Road;Momugut-Kapinguron;Chemunyala-Store Road;Sachangwan-Kapchorua Road;Burutu-Kapkesee Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,847,512.00 |
Chilchila |
Feedback |
| Off Chilchila Sch.-Kapedo Road-Chepkendi Dispensary-Railway Chemunyala Factory-Nyanza Road;Chepkendi-Kapkures Road;Cherara-Kamaget-Murgut Road;Kaplelit-Kishara-Kamatos Road;Kaplelit-Tegat-Timbil Road;Yala-Teldet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,942,132.00 |
Chilchila |
Feedback |
| Ndubusat-Kaburenik Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,102,860.00 |
Chilchila |
Feedback |
| Murgut Pry Sch.- Nyanza Boundary Road (1.3km); Off E 250 - Karap Murel Road (0.6km); Koisagat - Kapchebere - Morombit Road (0.8km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,670,580.00 |
Chilchila |
Feedback |
| Morombit - Morombinyik |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,082,780.00 |
Chilchila |
Feedback |
| Tendwet - Yalla - Kipteres Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,147,363.00 |
Chilchila |
Feedback |
| Teldet Centre - Kortende - Forest Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,426,690.00 |
Chilchila |
Feedback |
| Chepkechei - Kaplekwa - Kipteris FGIK Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,872,280.00 |
Chilchila |
Feedback |
| Chepkitar Centre - Toroton Boundary - Yalla Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,251,040.00 |
Chilchila |
Feedback |
| Toroton - Tulwapmoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,282,200.00 |
Chilchila |
Feedback |
| Chilchila Quarry(Tinderet Forest Road) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,007,926.00 |
Kamasian |
Feedback |
| Tendwet - Malinja - Magire Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,942,712.00 |
Kamasian |
Feedback |
| Misoi-Chumba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,191,360.00 |
Kamasian |
Feedback |
| Kipsongol-Kap Luso-Chemongen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,952,704.00 |
Kamasian |
Feedback |
| Kasheen-Morao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,459,964.00 |
Kamasian |
Feedback |
| Kimeto-Kaplaba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,704,032.00 |
Kamasian |
Feedback |
| Kasheen-Borowet-Murau Pry Sch. Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,241.00 |
Kamasian |
Feedback |
| Muharate-Nyairobi-Jagoror Road;Jagoror-Some Road;Jagoror-Kap Sharack Road;Makutano-Nyairobi Sec Road-Kiplaba-Kimologitbridge Road-Kap Sugurup-Greenland Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kamasian |
Feedback |
| Lelu Centre-Corner Junction Road 3.7KM;Kamtego-Monastry Road 1.2km;Of D312 -Lelu Dispensary Road 15km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,116,050.00 |
Kipkelion |
Feedback |
| Kapsugurup - Greenland - Kichagi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,450,064.00 |
Kipkelion |
Feedback |
| Siret Centre-Siret Quarry; Chemager Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,553,241.00 |
Kipkelion |
Feedback |
| AGC-Machilil Road; Tuiyobei- Arap Ngeno-Tilolwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kipkelion |
Feedback |
| Faith Church-Arap Moi Road;Chepkei-Chepkolon Road;Chepkiber-Kaplekwa-Kapkiyao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,069,688.00 |
Kipkelion |
Feedback |
| Quarry -Fuko Coffee Society Road; Quarry - KitobenRoad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,242,810.00 |
Kipkelion |
Feedback |
| AGC - Kipchorian - Machilil Road; Tuiyobei - Arap Ngeno - Tilolwet Road; Barsiele Centre - Chorwet Pry - Sugutek Road; Trailor - Kapsoheria Road; Cereal - Magunia Road; Sachwangan - Belsoi Road; Katepia - Mama Major Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,618,532.00 |
Kipkelion |
Feedback |
| Kobiro-Macheisok Road 5km;Miti Moja-Blue Hills Dip Road 3km; Kimologit-Blus Hilss Road 5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,217,234.00 |
Kipkelion |
Feedback |
| Agc - Kipchorian - Machilil |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,614,693.00 |
Kipkelion |
Feedback |
| Tuiyobei - Arap Ngeno - Tilolwet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,134,000.00 |
Kipkelion |
Feedback |
| Barsiele Centre – Kipchorian – Machilil Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,493,844.00 |
Kunyak |
Feedback |
| Off Main Road - Chemagel Road; Siret Centre Coffee Factory Road; Kimologit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,763,520.00 |
Kunyak |
Feedback |
| Kiptenden Kapkurin Road; Kapkurin-Kamiron Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,561,740.00 |
Kunyak |
Feedback |
| Nyanza- Girimori - Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,071,160.00 |
Kunyak |
Feedback |
| Kapkwen - Chesonoi - Kabirong - Kapkurin - Kiptenden Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,086,463.00 |
Kunyak |
Feedback |
| Minihaha - Sirgoi Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,438,585.00 |
Kunyak |
Feedback |
| Dip - Kolonget - Ngebebo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,210,708.00 |
Kunyak |
Feedback |
| Kotetni - Chemunyala - Cherara Road 4.5km; Chepsii - Kapsale Pry - Chemunyala Road 3.2km; Chelalo - Kilengel Road 3.1km; Timbilil - Ngola Road 2km; Kabirong - Kapkwen Road 3.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,630,143.00 |
Kunyak |
Feedback |
| Kipsitet-Mbasa Road; Kipsitet bridge-Kaplabotwo Road; Ngeremwo-Kipsitet dip Road; Nunda-Kipteran Road; Kipteran-Nyaberi Road-Laitigo pry-Maemba Road; Laitigo pry- kapsermi Road; Kapsimingoi-Ndanyomare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,467,128.00 |
Soin |
Feedback |
| Kabore-Cheptililik Road; Cheptililik-Kapkatit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,882,330.00 |
Soin |
Feedback |
| Ngeremwo-Chebotot Road; Maemba Road; Mbasa Road; Asenwet Road; Cheptagum Road; Laitigo primary Road; Koitaburot Road; Kapkatit Road; Cheptililik Road; Cheptororwo Road; - kipteran-Chepsengeny Sch; ndonyomare Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,145,134.00 |
Soin |
Feedback |
| Tobentai-Kipyoren-Kapkormom Road;Moetik-Tobentai;Kap Macharia-Kipyoren Road,Kap Gravel-Chemaluk Road;Kaplelach-Kwondop Morsong-kaplelach Bridge -Chepsengeny Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soin |
Feedback |
| Ngeremwo-Chebotot Road (6km) and Kwa Michael -Laitigo (4km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,989,046.20 |
Soin |
Feedback |
| Kapkormom Pry - Kapkormom Dispensary Road - Kejiryet - Kaplaboitwa- Sideways - Kapchoge - Laitigo-Ngeremwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,588,980.00 |
Soin |
Feedback |
| Kongeren river- Birirbei-Kapchelemei Road; Arap Chebochok-Arap Chepkoit; Kongeren pry Road; Kap Ingok-Birirbei Road; Chepkoson Road; Chepkoson-Kapsigilai Road; Kapchesilim-Kabokyek cattle dip road; Arap Seronik-sesgaa Road-Sesgaa-Kapsegut Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,043,160.00 |
Soliat |
Feedback |
| Itibet - Bagao- Deliverance Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
10,338,300.00 |
Ainamoi |
Feedback |
| Soliat corner-Kiptugumo pry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
N/A |
Soliat |
Feedback |
| Kiburet- Factory- Yasomok Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,205,220.00 |
Ainamoi |
Feedback |
| Kaplaba-kiptare-Kapcheptoo Road-kapkenyele Road;Kurabei-koyabeyon Road;Kurabei-Chesunut-Kapsigowo Road;Kapsigowo-Malanylem Road;Chesunut-Kapcherinyit Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,572,000.00 |
Soliat |
Feedback |
| Kap Zakayo- Ainamoi Polythecnic Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,307,200.00 |
Ainamoi |
Feedback |
| Tabrason-Kiptugumo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
6,459,424.00 |
Soliat |
Feedback |
| Nyinyitiet- Chemorir Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
560,000.00 |
Ainamoi |
Feedback |
| Kaboykek cattle dip - Kimugul Road; Kimugul koi Barak Road; kapsiongori - Arap ngeny Road; jolydab academy - kaprero Road; Arap Chepsengeny - Chemaluk Road; Chemaluk - Cheptembe Road; Kap injelio - Kap George Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,443,664.00 |
Soliat |
Feedback |
| Kiburet- Nyinyitiet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
420,000.00 |
Ainamoi |
Feedback |
| Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,471,400.00 |
Soliat |
Feedback |
| Duka Moja- Kiparao Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,409,180.00 |
Kapkugerwet |
Feedback |
| Kurabei - Mogonjet ; Kurabei/Arap Ngeno - Chepkoson; Soliat Dispensary/boys -Chepkoson Road; Soliat Boys Sec School -Soliat AGC road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
7,529,400.00 |
Soliat |
Feedback |
| Sumeiyon- Chelogoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,038,000.00 |
Kapkugerwet |
Feedback |
| AGC Chesunet - Kapchesengeny Road; Motero pry - Kapkitandyus Road; Kapcherunyit - Kurabei Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,724,052.00 |
Soliat |
Feedback |
| Kapriwet- Arap Nyige |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,747,300.00 |
Kapsaos |
Feedback |
| Kapingok-Kapchepkaigat -Kurabei road; Arap Chebochok-Arap chepkoit road: Kapchelemei-Kongeren river-Salgaa road: Soliat Boys Sec School-Turguito bridge road: Kongeren pry – Mirmiro: Kapshongiroi - Arap Ngeny: Kaboykek cattle dip - Kapchesilim - Kapsigilai Road : Kaptelo – Chelogong Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,352,400.00 |
Soliat |
Feedback |
| Manyoror Sign Post- Manyoror Sec- Off Kapsaos Ainamoi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,316,250.00 |
Kapsaos |
Feedback |
| Seska- Arap Seronik -Arap Chepsegeny- Chemaluk Rad; Jolydab- Kap Rero Road; Chemaluk Church of Christ- Kapsegut Pry- Cheptembe Road; Kapkingok- Birirbei- Chepkoson Road; Koibarak-Kimgul Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,211,800.00 |
Soliat |
Feedback |
| Torochgaa- Koigaron- Tegunot Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,393,784.00 |
Kapsaos |
Feedback |
| Kapnyakitari Centre - Kiptugumo Dispensary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,893,600.00 |
Soliat |
Feedback |
| Kosisit Primary- Kap Abinwas- Arap Rugut |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,300,452.00 |
Kapsoit |
Feedback |
| Kaplengeny - Kiptugumo Road; Tabrasin - Kiptugumo dispensary Road; Kapneesoi - Highway - Moretik - Arap Tuei Road; Soliat Boys - Kongeren river- Kapchelemei Road; Kongeren pry - Mirmiro Road; Siriat – Kapsisirwo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,384,000.00 |
Soliat |
Feedback |
| Off B1- Chepsoo Pry School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,890,404.00 |
Kapsoit |
Feedback |
| Shauri Yako - Kapkenyelo - Kipcheiyet Road; Kapkara - Karap Cheruiyot Road; Kapchesengeny - Chepyegon - Kapchepchilat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,969,156.00 |
Soliat |
Feedback |