2022/2023 FINANCIAL YEAR PROJECTS

- All Projects-
Go back

Project Objective Department Status Budget(Kshs) Ward
Routine Maintenance of Kamasega SDA- Kapsegut- Kiptugumo Pry School Road 4Km, Kitugumo Dispensary- Tamarson Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 3,397,816.32 Soliat Feedback
Construction of Kap Kutu- Kapsenda Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 2,140,221.34 Londiani Feedback
Construction Of Independence-Subukia Road 5.2Km, Kinyere Independence Road 2.1Km, Tumaini Secondary School-Nominated MCA Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 4,493,817.26 Tendeno/Sorget Feedback
Proposed Construction of 600mm 28m of culverts at 938 complex-Keta Academy Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,039,934.20 Chepseon Feedback
Proposed Construction of Kaptebengwet- Cheptangulgei River Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,409,706.24 Kapkatet Feedback
Proposed construction of storm water drainage facilities (Phase 2 – World Bank Funded) To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. Lands, Housing and Physical Planning On-Going 1,487,440.80 Kapkugerwet Feedback
Construction of Iraa Pry-School of Excellency- Masare Market Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,295,500.03 Kaplelartet Feedback
Construction of Kapsomboch- Chepkosa Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,084,742.72 Kaplelartet Feedback
Proposed Routine Maintenance of Tamboiyot TBC - Kiptenden TBC - Kebeneti Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,398,378.61 Sigowet Feedback
Construction of Kaplaiba-Chesunet-Kapsigowo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,938,716.12 Soliat Feedback
Construction of Soliat Dispensary-Mongojet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,532,475.88 Soliat Feedback
Construction of Kapsorok Market- Chepyegon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,647,239.52 Soliat Feedback
Construction of Prime Steel Junctions-Boroiywek Road; Munara Canteen-ATC Road; Chebirir centre-Chebirir River Bridge Road; Kileges main Road-Prime steel gate Road; prime steel gate - Karap Towett Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,698,397.84 Soin Feedback
Construction Of Quarry- Cheboror River- Kiprengwe Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 554,767.68 Kedowa/Kimugul Feedback
Construction of Kaptirbet River (Semi Box Culvert (21m, 900MM) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,993,154.40 Kapkatet Feedback
Construction Of Kamasega Sda-Kasegut-Kiptugumo Pry Sch Rd 4km,Kiptugumo Dispensary-Tamarson Rd 2.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,397,000.00 Soliat Feedback
Rehabilitation and Construction of Drainage Structures at Brooke Centre To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,524,060.00 Kapkugerwet Feedback
Construction Of Kapetero Bridge-Annah Tinga-Kapchebos Road 2.5Km, Brenda Shop-Off B1-Sombicho-OFF B1 Road 1.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,958,857.28 Soliat Feedback
Construction of Chemaluk- Cheptembe Road 1.2Km, Chesunet- Kapsigowo Road 1.7Km, Chebaran- Kapsorok Day School Road 1.9Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,310,320.58 Soliat Feedback
Construction Of Soliat Dispensary-Mogonjet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,874,254.92 Soliat Feedback
Construction Of Kapkisai- Simbi Road 2.5Km, Kapkisai Society- Simbi River Road 1.0Km, Simbi- Chemengeng iver- Emitiot Road 0.5km, Kapkigoro Junction- Kap Pastor Road 1.4km, Chepsegeny Academy- Senetwet- Nyaberi Road 2.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,575,038.00 Soin Feedback
Construction of Gokul-Kamelilo box culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,500,972.52 Ainamoi Feedback
Construction of Precast culverts at Kapfinch-Sotik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,400,367.12 Londiani Feedback
Construction of Chepkemel- Arap Cheruiyot-Sumeek Road twin 900mm Cross Culvert at Kululut River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,576,239.36 Kaplelartet Feedback
Construction of Sombicho Twin 900mm Cross Culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,988,069.60 Soliat Feedback
Construction of Kipaiwa Twin 900mm Cross Culverts To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,880,149.00 Soliat Feedback
Routine Maintenance of Off D314-Mutanya road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,609,015.20 Chepseon Feedback
Routine Maintenance of Koitamat Pry Sch- Quarry Laliat -Dip Road 1.5Km; Sachangwan- Koitamat-Chepngetuny Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,461,729.90 Ainamoi Feedback
Construction of Off E222- Ainamoi AIC- Chepngetuny Road 1.7km; Off E222-Chepngetuny-Koitamat Road 2.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,697,732.00 Ainamoi Feedback
Constructionof Off Main Road- Metro Pry Sch- Metro Box Culvert-Metro AIC Church Road 2.7Km; Chepsetyion Main Road- Kipchorian Bridge- Bishop Okoth Secondary School Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,516,993.60 Ainamoi Feedback
Routine Maintenance of Off E222- Koitamat Pry School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,634,000.00 Ainamoi Feedback
Construction Of Tendwet-Kapsilangwa-Ainapsososiot Road 4Km, Kimuitiony-Kapriwet Road 1.8Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,587,396.24 Kapsaos Feedback
Construction Of Manyoror Dip- Kamungei Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,972,406.00 Kapsaos Feedback
Construction Of Tabet- Koigaron- Mureret Road 3.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,535,559.36 Kapsaos Feedback
Construction of Tabet – Koigaron – Mureretv Road 2.2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,945,000.00 Kapsaos Feedback
Constuction Of Baraka-Kamungei 1.6km, Off C23-Lamaiyat Primary- Torochgaa Box Culvert 2.5 Km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,799,080.00 Kapsoit Feedback
Construction Of NCPB-Jua Kali Road 1.2Km,Mjini Highlands Road 3.5,Kenya Highlands 2.6Km,Kipochebor Primary Access Roads 1.5Km,Kimungen-Kamasian AGC Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,283,699.20 Kipchebor Feedback
Construction Of Market-Cereal-Cementry Road 1.7Km,Melit-Milimani Road 0.2Km,Melit-Zion Assembly Church Road 0.2Km,Melit-Kenya Highlands 0.4Km, Police Station Satellite Road 0.5Km,Nya=Gacho Stage-Tegek Road 0.5 Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,769,530.00 Kipchebor Feedback
Construction of Mjini Access Road 1.7Km; Kwa Taa- Mombasa Ndogo Road 0.5Km; Light and Life Church Road 0.3Km; Barabara Mpya-Nursery School Road 0.7Km; Riverside-Kitu Road 0.9Km; Melit-Mliminai Road 0.3Km; Kipcheobr Pry-Kamasian AGC Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,371,524.96 Kipchebor Feedback
Construction Of Sinonin-Itondo AGC 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,849,885.00 Kabianga Feedback
Construction Of Dispensary Sanga- Kap Senetor Road 2.6km, Kapmawei Dispensary- Kiptome Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,854,254.28 Kabianga Feedback
Construction Of Kap Peter- Masarian Pry- Masombok- Kap Joshua Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,965,900.00 Kapsuser Feedback
Construction Of Jericho-Master Seed- Kapzablon-Pentagon-Chemosi-Sesga Road 1.8 Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,165,000.00 Kapsuser Feedback
Construction Of Sesgaa-Kapsoiyo Primary School-Kipkoiyan Corner Road 5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,513,640.00 Kapsuser Feedback
Construction Of Kaptebeswet-Kigorwet AGC-Mosombok Stream 1.9Km, Kiboito TBC-Kapchogeka-Kiboei AGC- Sachoran Road 5.5Km, Bot Musa Road 0.1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,219,000.00 Kapsuser Feedback
Construction Of Off Chebungungon Road-Kesagetiet TBC Road 1.8Km, Kapelexanda-Chemosn-Kapstephano-Kapturmesendo-Brazil Road 4Km/3.7km, Kap Mathayo-Chepngetuny Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,680,313.00 Cheptororiet/Seretut Feedback
Construction Of Chemoson - Kapturmesedet- Kap Stephano- Brazil Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,688,508.80 Cheptororiet/Seretut Feedback
Construction Of Greenfield -Sambeek Clinic- Kapcheren- Ainapkoi Road 3Km; Kipsolu Agc- Kibaraa Road 1.6Km; Chepkoton Bridge- Milimani TBC- Maina Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,163,155.55 Cheptororiet/Seretut Feedback
Construction Of Kesagetiet Tbc-Kiptserten; Kap Mathayo – Chepngetuny Pri-Arap Koech Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,150,478.80 Cheptororiet/Seretut Feedback
Construction Of Sosiot-Chepkoin 3.6Km, Cheimen- Barabu TBC Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,687,577.25 Waldai Feedback
Construction Of Cheptenye Sign Post-Nukiat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,499,503.00 Waldai Feedback
Construction Of Off Cheribo-Chemoroch Road 3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,704,086.04 Waldai Feedback
Construction of Chesingei – Cheptalus Road 0.4km; Atebwo TBC – Koweek River Road 0.7km; Kwa Aurelius – Tuiyobei Kapstanley Road 1.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,959,472.00 Cheboin Feedback
Construction of Cllr Jane- Dip – Kimwogit Kongasis Road 1km; Cheptinet – Kapchebo Road 1.9km; Kaptangul – Kapcheluget Road 5.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,701,897.00 Cheboin Feedback
Construction of Kapdaut – Kiptewit Dispensary Road 1.5km; Chebaibai – Tetile Road1.5km; Kapkitende – Birirbei Road 0.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,999,158.00 Cheboin Feedback
Construction of Chematui – Bosco – Korongoi Girls Road 2.3km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,359,288.00 Cheboin Feedback
Construction of Kipwastuiyo-Asururiet Bridge Road 1.2Km, Lelach Junction-Lelach Girls Road 0.7Km, Joyland Academy-Chesanga Pry Shool Road 0.3Km, Asururiet Bridge- Masubeti Pry School Road 1.2Km, Kipwastuiyo Mkt- Kenene Quarry Road 2Km (Grading Only) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 6,222,555.00 Cheplanget Feedback
Construction of Mosore Dip- Kap Daktari Road 1.6Km; Sachangwan- Roret ICT Road 2Km; Tendwet- Arap Leitich Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,517,289.28 Kisiara Feedback
Construction of Mosore Dip- Kap Daktari Road 1.6Km; Sachangwan- Roret ICT Road 2Km; Tendwet- Arap Leitich Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,705,025.00 Kisiara Feedback
Routine Maintenance of Kabianga University- Chematich- Kaptirbet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,020,573.84 Kapkatet Feedback
Construction of Kap Johna-Cheribo Road 2Km; 954Mission-Arap Lele Road 1Km; Nyambolosa-Kipkurgat Road 0.6Km; Kipkuna- Chebwagan TBC Road 2Km; Lebekwet-Kolonget Road 0.7Km; Kap Bembe-Munywet Road 0.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,387,763.68 Litein Feedback
Construction of Kaptibin- Kap Chief- Tabet Road 1.5Km, Barotion- Kiptongit- Kapkarin Road 3.2Km, Chebwagan AIC_ Kipkuna Road 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,941,176.68 Litein Feedback
Kaptebengwet-Inat Road 1.9km,Chemobei-Kapjohnstone-Nyamanga Road 2km,Nairobi-Kaptebengwo Road 0.4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,523,634.48 Tebesonik Feedback
Kaptebengwo- Innat Road 1.7Km, And Chemobei- Kap Johnstone-Nyammaganga Road 1.8Km, Nairobi- Kaptebengwet Road 0.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,697,524.28 Tebesonik Feedback
Proposed Routine Maintenance of Ngoina Agc- Kipsamoi Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,727,312.56 Tebesonik Feedback
Proposed Routine Maintenance Cheptagum-Kibirech Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,620,249.57 Tebesonik Feedback
Kap Joseph Maritm- Kap57-Kap George Mutai- Kipkeles Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,700,246.80 Tebesonik Feedback
Construction Of Kamiwa-Kamotos Road 4.1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,145,560.40 Chilchila Feedback
Construction Of Chemosogon- Kipsegi- Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,495,922.16 Chilchila Feedback
Construction Of Chemosogon- Kipsegi- Kimologit Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,205,365.36 Chilchila Feedback
Construction Of Burutu Junction- Kapkese Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,613,823.82 Chilchila Feedback
Construction Of Barsiele Centre-CDA Road 3.9Km, Off C35-Sugutet Primary-Kalyet Road 0.9Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,486,994.72 Kipkelion Feedback
Construction of Kapchepkeber-Faith Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,884,334.24 Kipkelion Feedback
Construction of Ngendalel Centre-Kipsimbol ECDE Centre-Kamachungwa Bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,024,934.00 Kipkelion Feedback
Construction of Off C35-Kap Zephania Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,364,937.32 Kipkelion Feedback
Construction of Kimologit Quary- Kimologit Coffee Factory Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,182,900.80 Kipkelion Feedback
Construction of Lesirwo- Chewen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,609,099.84 Kipkelion Feedback
Construction of Chamngei-Tingoro Road 1.4Km, Siret- Bakao Nursery Road 0.7Km, Siret-Kamachungwa- Chemengon-Kipchorian Bridge Road 1.7Km, Ngendalel-Kamcahungi-Kapkimolwo Road 1.2Km, Cheptole-Kamusa Road 1km, Segete-Kitoben- Karap Bore Road 2Km, Quarry-Kitoben Road 1.5Km, Kitoben Nursery-Segetet Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,479,558.08 Kipkelion Feedback
Construction Of Kijawir-Kolonget-Arap Cheres -Tata Road 1.6Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,826,637.19 Chepseon Feedback
Construction Of Kapchief-Kamarus Annex Road 2.1Km,Mile 4-Kondamet Road 2.8Km,Chetite-Sachangwan Road 0.7Km,Full Gospel-Rita Road0.25Km,FFPK Church-Kap Brook Road 0.5 Km,Kap Ezekiel-Kamkamba Road 0.4Km,Mile 4 AIC Church Road 0.35Km,Cherukechuu-Kapsingen Road 0.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,588,160.72 Chepseon Feedback
Construction Of Kapchemusian Road 2.7Km, Chepsain Road 2.1Km, Chepcholliet Road 2Km, Chepsir Road 0.1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,552,923.36 Chepseon Feedback
Construction Of Mile Nne- Momoniat Road 1.5Km; Sigowet- Cheboror Road 5.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,148,468.48 Chepseon Feedback
Construction of Off Main Road- Chepsir-Melile River Bridge Road 3.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,010,128.00 Chepseon Feedback
Construction Of Sally Bii- Julius Road 1.2Km, Kap Tirop- Kap Eldoret Road 0.3Km, Chebewor-Muratit Road 0.35Km, World Wide Road 0.4Km, Transomi- Stano-Chebewor Pry Road 0.8Km, Kapcheres-Kiplekwa- Kona Shop Road 0.7Km, Ndiwa Roads 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,589,520.01 Kedowa/Kimugul Feedback
Construction of Cherote-Kapkamano Road 2.3Km, Kap Pastor-Kapkatet TBC Road 2.3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,212,472.64 Kaplelartet Feedback