| Proposed Construction of 600mm 28m of culverts at 938 complex-Keta Academy Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,039,934.20 |
Chepseon |
Feedback |
| Proposed Construction of Kaptebengwet- Cheptangulgei River Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,409,706.24 |
Kapkatet |
Feedback |
| Proposed construction of storm water drainage facilities (Phase 2 – World Bank Funded) |
To reduce and manage flooding in the project area by channeling storm water through an effective and well-designed drainage system. |
Lands, Housing and Physical Planning |
On-Going
|
1,487,440.80 |
Kapkugerwet |
Feedback |