| Leberer-Kamachungwa-coffee factory road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
3,941,891.12 |
Chepseon |
Feedback |
| Construction of 938- 938 Girls Road; Chepsir- Kipkeremwo Road; Monori- Sailo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,490,816.96 |
Chepseon |
Feedback |
| Construction of Culverts at 946 |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
4,493,817.26 |
Kapkugerwet |
Feedback |
| Baregeiywet Dispensary Road (Twin 900mm Culvert 14M); Chepkembe B (7m, 900mm); Ainaptibik Culvert (7m, 900mm) Menjo River (7m 900mm) Arap Oriango (14m, 900mm) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
|
2,098,500.00 |
Soliat |
Feedback |
| Routine Maintenance of Kaplelartet chiefs' office-Tabaita center road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
|
2,996,699.92 |
Kaplelartet |
Feedback |
| Construction of Off B1-Kaitui bridge-kiptugumo pry sch Road; Kamasenga-Soliat Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
3,695,760.00 |
Soliat |
Feedback |
| Segetet-Siranga Road (7m, 900MM); Chebirir-Sachangwan Road (7m, 600MM); Kaula-Kapsoton Road (14m, 600MM) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
616,804.48 |
Kipkelion |
Feedback |
| Supply, Delivery, And Installation Of Kivuno-Korori Road;Mugumoini-Centre Road;Subukia-Centre Road;Centre One -Gwitu Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
2,007,746.56 |
Tendeno/Sorget |
Feedback |
| Proposed Culverts Installation To Bosuben Junction-Tanguret Road,Kipteran-Kapsinendet Church Of Christ Road,Kap Petero-Kapsimbiri Dip Road,Kapsimbor-Kap Mosonik Shops,Arokyet Tinga-Kap Cape Town Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,900,928.54 |
Cheplanget |
Feedback |
| Supply,delivery and installation of culverts at Chebinyiny-Kenene rd,Mobet-tabut rd,mobet-keregut road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
On-Going
|
1,847,972.80 |
Cheplanget |
Feedback |
| Routine Maintenance of Silva junction-Siongi-Kampala road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
On-Going
|
3,640,590.40 |
Tebesonik |
Feedback |
| Routine Maintenance of Salgaa-Kongeren river-Kaplaiba road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,206,407.28 |
Soliat |
Feedback |
| Construction of Kelunet-Kapkimoro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
500,010.45 |
Tebesonik |
Feedback |
| Excavation of Kalmelilo coffee farm-reresik Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,051,453.00 |
Ainamoi |
Feedback |
| Construction of Koitabmat-Bondeni-Kiburet rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,144,000.00 |
Ainamoi |
Feedback |
| Construction Of Chepsetyion Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,451,995.00 |
Kapkugerwet |
Feedback |
| Construction Of Karap Kitur-Sumeiyon-Victor Academy-Orison Annex Road 4.8Km,Arap Kitur-Ainapbelek-Chelogoi Road 0.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,755,115.00 |
Kapkugerwet |
Feedback |
| Construction Bondeni- Kerego Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,144,017.00 |
Kapkugerwet |
Feedback |
| Construction Of Arap Chepkoshom- Laibon Bridge- St. Joseph Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,791,139.00 |
Kapkugerwet |
Feedback |
| Chepsetyon Assorted Roads |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,929,080.00 |
Kapkugerwet |
Feedback |
| Construction of Kisabei-Kenegut-Lemeiywet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,790,690.00 |
Kapsoit |
Feedback |
| Construction Of Karap Tegerei-Gabriel Road ,Tilitrap Malit-Kirongisyet Road,Kap Timothy-Chelule Road,Rugut-Chemoibei Road, Chemoibei Primary-Koitabai Road,Arap Kenei-Kiptetoon-Lemeiywet-Tunga Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,500,004.00 |
Kapsoit |
Feedback |
| Costruction Of Samutet-Engineer Bett Road 3.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,189,997.00 |
Kapsoit |
Feedback |
| Construction Of Off C35-Kisabei Pry - Kenegut- Lemeiywet Road 3.5Km, Off C35- Cherire Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,197,834.00 |
Kapsoit |
Feedback |
| Constrution Of Ogirgir Sign Post-Ogirgir Tbc-Kisabei Road 2.9km,Off E222-Ketitui Pry-Ketitui Sec Sch Road 0.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,694,477.00 |
Kapsoit |
Feedback |
| Construction of Kenegut centre 1.4km-Kamorongo Road 2km, Kapmosit-Tembwab kenegut Road 2km, Karap Marindany-Cheptagum ROad 3km, Kamosit-Karap keino Road 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,813.00 |
Kapsoit |
Feedback |
| Construction of Kaboswa- Kiptenden- Cheptagum ROad |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,725,073.00 |
Kapsoit |
Feedback |
| Construction Of Off B1- FGCK Samutet- Market Road 0.7km, Off B1- JoRoadan Junction Road 1Km, Salgaa-Muguiywet-Oriango Road 1.6Km, Kiget Shop- Sunrise Academy- Sugutek Pry- River Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,004,881.00 |
Kapsoit |
Feedback |
| Construction of Kenegut Centre- Lemeiywet Road 1.5Km; Kenegut AIC-Cherire Road 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,066,000.00 |
Kapsoit |
Feedback |
| Construction of Telanet girls - Kaboswa TBC rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,879,200.00 |
Kapsoit |
Feedback |
| Construction of Ogirgir sign post-Ogirgir tbc-kisabei Road 2.9km,Off E222-Ketitui pry-Ketitui sec sch Road 0.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,174,000.00 |
Kapsoit |
Feedback |
| Construction of NCPB- Mjini Road; Cereal BoaRoad- Owour Church- Nyagacho- Mjini Road, Slip Footh path-Church- River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,837,715.00 |
Kipchebor |
Feedback |
| Construction Of Jua Kali Rd,Mjini Hilands Rd,Kenya Highlands Roads,Kipchebor Pry Access Roads,Kimungen-Kamasian Agc Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,152,100.00 |
Kipchebor |
Feedback |
| Construction of NCPB Cereals- Nyagacho Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,650,000.00 |
Kipchebor |
Feedback |
| Munai-Kipsot-Toror factory-Kimeswan Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,924,548.00 |
Kipchimchim |
Feedback |
| Construction Of Kabianga Tea Factory-Chepkutbei TBC 1.5Km, Tuiyobei Bridge-Kapchebet Agcroad 0.6Km,Kondamet AGC-Turkana Road 0.8Km,Arap Siele Mobego Primary 1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
982,608.00 |
Kabianga |
Feedback |
| Construction Of Kaptumbo-Kipkeurit Road 1.6Km, Kibingei Girls-Ngainet Road 1.2Km,Kabianga-Market Road 0.6Km,Kaplong-Kamaso Primary School Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,455,079.68 |
Kabianga |
Feedback |
| Nyabangi Centre-Chesebet Road 1.9k ;itembe-stashine AGC-Link Kiptere Road 0.9km,Karap Cheriro-Kap D.O Road 1.3km;Sinonin-Itondo Bridge Road 2.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,839,344.80 |
Kabianga |
Feedback |
| Kiptule TBC-Kolonget tbc-kaphentry Road 2km, off momul factory-itindo AGC Chemamul SDA ROAD 2.8KM |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,208,281.68 |
Kabianga |
Feedback |
| Construction of Mereonik- Kigorwet- Chief’s Office- Cheboin Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,972,551.04 |
Kapsuser |
Feedback |
| Construction of Seretut- Kamathayo- Chepngetuny- Pry- Arap Koech- Arap Mitei- Kap Oriango Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,692,341.47 |
Cheptororiet/Seretut |
Feedback |
| Construction of Kuresiet-Happy church-kibaraa rd 1.5km,michilingwet TBC-chepngerer-mandela Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,202,516.48 |
Cheptororiet/Seretut |
Feedback |
| Construction Of Teldet-Menet Road 2.3Km, Milimani-Machorwa Road 2.1Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
876,889.00 |
Waldai |
Feedback |
| Construction of Sosiot Centre Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,348,662.40 |
Waldai |
Feedback |
| Construction of Kipkoskei-Kapkolumbei Road, 0.5km, cheboin tbc-Kaprap joshua r 1.5km,arap koskei-Faith Church-Kapnyangai river-bot elijah corner tatu-Link Highway Road 2.7km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,193,841.00 |
Cheboin |
Feedback |
| Construction of Kenene Quarry- Kenene TBC Road 0.9km; Cheplanget Market Roads 0.3Km; Twoliot TBC- Kapsogeruk Bridge Road 1Km, Kaldit TBC- Matureti Road 1Km; Cheplanget Market- Kapsiongei Road 1.4Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
937,092.08 |
Cheplanget |
Feedback |
| Construction of Arap Kesoro-Tamboiyot Box Culvert Road 0.6Km,; Kap Petero-Kap Simbirir Dip Road 0.6Km, Kapsimbirir-Kap Mosonik Shop Road 1.1Km, Arokyet Tinga- Kap Cape Town Road 1.1Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,448,076.80 |
Cheplanget |
Feedback |
| Construction of Mombwo Pry- Sugutek TBC Road 0.8Km; Arap Kesembe- Caterpillar Road 2km; Bosuben Junction- Tanguret Road 1.3Km; Kipteran-Kapsinendet Church of Chridst Road 1.3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,670,678.40 |
Cheplanget |
Feedback |
| Construction of Off Chesingoro TBC-Kapsumet TBC-Chililis-Morit bridge Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,287,129.12 |
Chemosot |
Feedback |
| Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,975,268.96 |
Kisiara |
Feedback |
| Construction of Chemeteget- Molyolok-Kimulwo Deliverance- Off C23 Roads; OFC Church- Shallai- Chelilis Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,897,196.32 |
Chemosot |
Feedback |
| Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,730,644.64 |
Kisiara |
Feedback |
| Construction of Keregut-Taach Centre Road 1km,Tinga-Tulwap Kipsigis Road 0.3km,Misoi-Chebirribei-Aroron Road 0,85km,Mongoita-Chemamanik Road 0.4km,Sunset Junction-Chepkoiyo Road 1km, Kelelwa-Chepkoiyo Road 0.7km,Kasebet-Chepkembe Road 1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,496,709.00 |
Kisiara |
Feedback |
| Shiners-Temuge r 0.4km, Kaptirbet-koros-ngesumin Road 2.5km, Kapkatet mortuary-Cementry Road 0.4km, Kapkatet Factory-Nganaset Road 0.6km, cherandas-sewerer Road 0.3km, kapkatet-AIC Holy Harvest church Road 0.5km,Kap mp-cherus tbc Road 0.6km, Off main Road-arap chepkwony Road 0.6km,off main Road-dcs residence Road 0.2, off main road kiko Road 0.2km matunda Road 0.2km, 954east-kipkosil pry sch Road 0.5km,mabwaita Aic -Catholic church Road 1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,495,316.64 |
Kapkatet |
Feedback |
| Koiwa-Pefa church Road, chebagal tbc,ainapset river agc Road, Tendwet-Kaphilimon Road;Pefa Church-Cheptigit -Arap Maina Road, Kapkaren-Soet Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
5,845,379.00 |
Litein |
Feedback |
| Construction Of Kamiwa- Kamotos 4.1Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,285,617.68 |
Chilchila |
Feedback |
| Construction Of Kapwanja- Chebisom Road 2.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,026,752.00 |
Chilchila |
Feedback |
| Construction Of Baseline Songonyet Kimandui Road , Rarinwet Sereng Road, Chegen Road Laboso Pry Siwot Factory Siwit Dispensary Road , Maarifa Pry Siwot Catle Dip Road, Museum Koiserem Pry Road, Leketetiot Road, Kapkures Road Laboso Academ Siwat Factory Siwot Dispesary Siwot Seconday Siwot Farm Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,853,706.72 |
Chilchila |
Feedback |
| Construction Of Kokwet Secondary School-Kapnguron-Kipsumei Road 2Km,Burutu Dip-Mugut Factory Road 1.6Km,Yala-Magire Secondary School-Teldet Road 2.8Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,479,771.52 |
Chilchila |
Feedback |
| Construction of Tendwet-Malinja-Magire dispesary Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,946,746.88 |
Chilchila |
Feedback |
| Gravelling of Tendwet-Malinja-Magire dispesary rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,190,255.20 |
Chilchila |
Feedback |
| Factory-Chepkosa Road,Chepkosa-Legetiot Road,Legetiot-Chembek Road,Chumbek-Kiptenden Road,Sereng-Chepkendi Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,005,386.00 |
Chilchila |
Feedback |
| Construction Of Seguton Santos Round-AIC Church Road 2.6Km,Pinus Tamarsang 1.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,154,624.64 |
Kipkelion |
Feedback |
| Construction of Off C35-Chebululu Road,Mocheisok-Mumetet Road,Chemamul-kobiro Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,419,604.56 |
Kipkelion |
Feedback |
| Construction of Liloch Pry sch-Koisaet pry sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,673,199.12 |
Kamasian |
Feedback |
| Construction Of Bartera-Murero Road,Irengeti-Changee Road,Kawangware-Mtaragon Road,Kaptepengwa-Tinga Farm Road,Kaptepengwo-Bartera-Murera Road,Singoi Road,Kaptego-Borowet Road,Kuakali Road,Kaplaba Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,475,605.00 |
Kamasian |
Feedback |
| Construction Of Centre Juu-Kiringeti-Makanisa Road 4Km, Bartera-Centre Juu Road 1.5Km, Kapkures-Sirgoi Road 3Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,434,386.40 |
Kamasian |
Feedback |
| Construction of Centre Juu - Kerengeti - Makanisa Road 4.0km , Bartera- Centre Juu Road 1.5km and Kapkures - Sirgoi Road 3.0km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,873,901.00 |
Kamasian |
Feedback |
| Chemosogon - Kipsegi - Kimologit rd |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,187,800.64 |
Kamasian |
Feedback |
| Construction Of Njoro-Kapkoros Road 1.5km, Kapserem-Timbek Road 1.5Km, Tumoek-Kapkurin Road 2Km, Tumoek-Kabarak Road 3Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,998,381.92 |
Kunyak |
Feedback |
| Construction of Kap DO - Njoro Kolonge Road 1.9km; Kapkwen - Kiptenden Road 8.5km; DO's - Kimoro Road 1km; Sireret - Mlango Road 8.6km; Kapis - Kamaragaa Road 1km - Kunyak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,021,708.32 |
Kunyak |
Feedback |
| Construction of Cattle Dip- Ngepepo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,110,802.16 |
Kunyak |
Feedback |
| Construction of Kapkilumben-Chagaranda road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,202,523.28 |
Kunyak |
Feedback |
| Construction of Kapkurin- Kabirong- Chesonoi-Kapkwen Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,501,005.28 |
Kunyak |
Feedback |
| Constuction Of Kigora-Mosonik Road 3.5Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,650,801.92 |
Chepseon |
Feedback |
| Chepsir-Kipkeremwo Road 5.7km, Monori- Sailo Road 2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,350,000.00 |
Chepseon |
Feedback |
| Construction Of Kipkeremwo- Ngasura Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,040,978.32 |
Chepseon |
Feedback |
| Construction of Momoniat Centre- Cheboror Pry- Kap Cherotich- Karap Malel- Sigowet Road 5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,555,520.45 |
Chepseon |
Feedback |
| Construction of AGC-Kobeiyot Road 0.5Km; Momoniat Pry Schl- Cllr Road 0.2Km, Kap Hezron Road 0.6Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,876,196.80 |
Chepseon |
Feedback |
| Construction of Kapmachungwa-Mutanya road;Off Kamachungwa-Leberer cattle dip road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,098,633.00 |
Chepseon |
Feedback |
| Construction of Chebitet- Kiletien Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,845,441.00 |
Chepseon |
Feedback |
| Construction of Kipkeremwo - Ngasura Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,562,309.50 |
Chepseon |
Feedback |
| Construction Of Deliverance-Ngatumek Road 3.4Km, Mathias- Kipyemit Road 1.2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,816,435.73 |
Kedowa/Kimugul |
Feedback |
| Construction of Kimugul-Kimoson Primary School Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,253,729.28 |
Kedowa/Kimugul |
Feedback |
| Construction of Free pentacost church-Kiprengwe-Kapchelule road; Cattle dip-Miti Moja road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,798,778.40 |
Kedowa/Kimugul |
Feedback |
| Construction of Off B1-Barkechechek River Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,524,012.64 |
Kedowa/Kimugul |
Feedback |
| Construction Of Kwa Chumo Rd,Kipsigori-Agc Church Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,069,131.16 |
Kedowa/Kimugul |
Feedback |
| Construction Of Kapkondoo-Kapisoi Road 3.8Km, |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,299,034.62 |
Londiani |
Feedback |
| Construction Of Kapkwen Pry School- Arap Kurgat Road 1.2Km, AIC Cheres- Kap Asariah Road 0.4km, Cheres Centre- Forest Road, Arap Choge- Ninja Road, SDA Cheres-Kap Zachariah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,677,463.36 |
Londiani |
Feedback |
| Construction of Kipsirichet-Boma-Jagoror Quarry Road 1.5km,Kapketin-Kigen-Academy Road 1.2km, Baba Noa -DC Road 1.1km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,849,905.21 |
Londiani |
Feedback |
| Construction of Kapsenda quarry - Kipsotet Road 1.3km; Kapkondoo SB - Chebirir Road 2.0km and Kimout - Chepkoiyo Road 1.4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,075,343.20 |
Londiani |
Feedback |
| Grading, gravelling and compaction of Lower Cheres Road, Kapkwen pry school - Arap Kurgat rd,AIC Cheres - Kap Asariah Road, Cheres Centre - Forestry Road; Arap Choge - Ninja Road; SDA Cheres -Kapzachariah Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,762,126.85 |
Londiani |
Feedback |
| Construction of Barno-Kimout pry sch-Kimout centre rd 3km,Sudan Kapraplimo rd 0.3km, Kiplangat-Chepkoiyo-Kapkiondo rd 1.3km, Kapsenda Dispesary-Kerich -Kutu rd 1.7km,Marindany-Lalangbek pry sch rd 1.6km Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,615,691.00 |
Londiani |
Feedback |
| Construction Of Independet- Kamwogo Road 4.5Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,889,408.00 |
Tendeno/Sorget |
Feedback |
| Grading Of Kaigai Road, Upc Road: 1km, Majani Sawmill- Awii Road: 1.2km,Amos- Saiz Road: 2.7km Independent Church- Dam Road: 1.2km, Ajaja Road:1.1km, Catholic- Main- Cherer Diversion Road: Madam Milka- Koigo Road: Cheres Road: Chebangang Road: Josh- Dam Road: 1.3km, Chane Road: 2km,Upendo Road:1.5km, Wakimani Road:1.1km Zakayo Road:1.2km, Mama Mike Road:1.2km, Mrs Langat- Forest Road: 1.3km, Botpla Road: 1.2km, Mama Wangari- Dam - Daniel Road: 2km, Speaker Kiprono Road:1.8km,Kwa Daniel Road:1.2km,Daniel - Forest Road:2km,Centaa Road: 3km,Kipkelion Works:2.1km, Barsiele Road:1.8km, Mau Road- Rowerr Road:00.8km,Towett-Guito Road:1.2km, Ngingo- Highway Road:1.8km,Peters- Gwitu Road:1.8km Bungoma Road- Isilii Road: Assembly Church Bridge- Cheres Road: Bridge Road: Assembly Church Bridge- Cheres -Bridge Road: Mama Chelimo- Al Shabaab Road: 0.8km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,373,212.26 |
Tendeno/Sorget |
Feedback |
| Construction Of Sorget Chief's Office-Sorget Pry Sch Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,699,633.01 |
Tendeno/Sorget |
Feedback |
| Construction Of Kakibe Primary-Chepkalo Coffee Factory-Catholic Church-Simotwet Primary-Tirita Bricks YaRoad Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,549,505.34 |
Sigowet |
Feedback |
| Construction Of Tabrasoi-Kiplogoi Pry-Saachangwan Road 3.6km,Sugutek-Tuiyobei Pry Sch Road 4km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,810,000.00 |
Soliat |
Feedback |
| Construction of Siriat- Kamungesha Road; Moinget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,598,309.60 |
Soliat |
Feedback |
| Construction of Kabingok-Kongereen pry-Mirmiro Road 1.7km,Kapshiongiroi-Kaap Chepsengeny r 2.2.km;Seskaa-Ainap Itiik-Kapmathayo Road 1.4km Kapraptuei-Kamageso Road 1.5km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,613,813.89 |
Soliat |
Feedback |
| Construction of Soliat boys sec-chepkoson river rd, karobetKamasenga Quarry rd; Korabei-Chesunet-Kapsigowo rd;Cheramor-siriat rd;sesagaa-kapchelemei-Kongereen |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,008,437.76 |
Soliat |
Feedback |
| Construction of Kabokyek- Chesiche Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,270,053.84 |
Soliat |
Feedback |
| Construction of Kapkormom Junction- Chesino Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,769,728.48 |
Soin |
Feedback |
| Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,130,604.50 |
Soin |
Feedback |
| Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,590,290.40 |
Kapkugerwet |
Feedback |
| Proposed Construction of Off B2- Saoset TBC- Chemugusu Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,826,637.19 |
Kapkugerwet |
Feedback |
| Proposed Construction of Mjini Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,007,910.00 |
Kipchebor |
Feedback |
| Construction of Koisagat- Chilchila Boundary Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,439,286.70 |
Chilchila |
Feedback |
| Proposed Construction of Chesingoro- Lalagin Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,402,532.80 |
Chemosot |
Feedback |
| Proposed Twin 900mm Cross Culverts to Cherara Bridge, Chebululu- Ng'erng'erwet Road and Kimugul- Ngainet TBC Road At Ngepchebyaat River |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,834,996.18 |
Kisiara |
Feedback |
| Routine Maintenance Of Kap Josea-Kap Sakawa Road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,350,955.84 |
Kipchimchim |
Feedback |
| Routine Maintenance of Cheptororiet-Arap Tonui road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
2,937,783.52 |
Kapsuser |
Feedback |
| Routine Maintenance of Kosachmwai-Chemoset road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
2,090,061.26 |
Cheptororiet/Seretut |
Feedback |
| Routine Maintenance of Chebitet-Kap Tebengwet road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,187,540.80 |
Kapkatet |
Feedback |
| Routine Maintenance of Reresik-Kiprichait-Roret boys-Chebululu-Tulwet-Ngainet bridge |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,629,140.08 |
Kisiara |
Feedback |
| Routine Maintenance of Kapkarin-Chesoen TBC road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,469,031.04 |
Litein |
Feedback |
| Routine Maintenance of Ainapset A.I.C-kap Bomwo-Rungut primary-Chemsembe-Tenwet T.B.C road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,548,176.83 |
Litein |
Feedback |
| Routine Maintenance of Kibolgong-Tiriitab Eito road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,397,908.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Kibaranji-Karapngerer road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
4,162,824.00 |
Tebesonik |
Feedback |
| Routine Maintenance of Mutwot-Emdit road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
3,996,587.60 |
Kaplelartet |
Feedback |
| Construction Of Kapkawa Bridge-Chemutian Dip Road 2Km, Chemutian-Kapjonathan Road 1.2Km, Kapkawa Bridge-Kapkongoni Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,615,691.00 |
Soliat |
Feedback |
| Construction of Kaplengeny- Kiptugumo Road:2.6km, Tabrasin-Kiptugumo dispensary Road:2.2km, Kamaneesoi-Highway-Moretiik-Arap Tuei Road: 2.2km, Soliat Boys-Kongeren river-Kapchelemei Road:0.5km, Kongereen pry-Mirmiro Road:1.3km, Siriat-Kaosisrwo Road:1.2km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,707,324.00 |
Soliat |
Feedback |
| Construction of Soliat Boys- Soliat AGC-Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,389,868.00 |
Soliat |
Feedback |
| Soliat primary-kamugesh-primary school Road 2.7km Kapnogiro-karapkeino Road 0.8km, salgaa-kaaplachelemei-kongereen dip Road 2.3 km ,kongeren river -kabingoi Road 0.8km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
2,496,880.51 |
Soliat |
Feedback |
| Gravelling For Kapsimba-Chesiche Church Road; Chesiche-Chesiche Ecd Road; Chesiche Ecd-Kaptala Road; Chesiche-Kabokyek Ecd-Kaptala Road;Chesiche-Kabokyek Cattle Dip Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,214,963.00 |
Soliat |
Feedback |
| Construction of Chepsengeny-Kwandap Mosong road;Kwandap Mosong-Kaplelach Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,153,380.00 |
Soin |
Feedback |
| Proposed Construction of Twin 900mm Cross Culverts To Kapjonah - Bagao Road (5Km); Ainamoi bridge – Maseriat AGC Road (2km) |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,494,177.52 |
Ainamoi |
Feedback |
| Propsoed Construction of Kokwet Box Culvert |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,252,491.52 |
Chilchila |
Feedback |
| Routine Maintenance of Elite primary school-Chebangang road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,429,178.00 |
Londiani |
Feedback |
| Routine Maintenance of Barotion sawmill-Lelsotet road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
975,030.00 |
Londiani |
Feedback |
| Routine Maintenance of Slaughter house-Towet bridge-Marindany forest road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,120,200.00 |
Tendeno/Sorget |
Feedback |
| Routine Maintenance of Murau centre-Bakery road |
Potholes patched, ,surface grading completed. |
Public Works, Roads and Transport |
Completed
|
1,034,595.00 |
Kamasian |
Feedback |
| Construction of Off 222- Munai Road 2.4Km, Off 222- Dairy- Kipsotet-Chumo Road 1.7Km, Chepnyonyo-Toror Factory-Boita PAG Church- E222 Road 2.9Km, Off E222- Sepet Pry School Road 0.5km, E222-Kimeswon Road 1.9km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
668,285.00 |
Kipchimchim |
Feedback |
| Construction of Kipchimchim- Kipsotet-Kimeswon Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
1,507,786.00 |
Kipchimchim |
Feedback |
| Construction Of Kapsaino-Chebitet Road, Kapshifta-Chebitet Road, Kapchamgei-Koibarak Road, Chilichila-Koibarak Road |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
3,277,574.20 |
Chepseon |
Feedback |
| Construction of Centre Juu Quarry- AGC- Kap Stephano- Kaptebe- Ngeno- Borchole Road 4.5Km, Bartera Pry Sch-Centre Juu Road 2Km |
To improve road infrastructure and ensure effective drainage |
Public Works, Roads and Transport |
Completed
|
4,961,208.00 |
Kamasian |
Feedback |