2021/2022 FINANCIAL YEAR PROJECTS

Department: Public Works, Roads and Transport

- All Projects-
Go back

Project Objective Department Status Budget(Kshs) Ward
Leberer-Kamachungwa-coffee factory road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 3,941,891.12 Chepseon Feedback
Construction of 938- 938 Girls Road; Chepsir- Kipkeremwo Road; Monori- Sailo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 2,490,816.96 Chepseon Feedback
Construction of Culverts at 946 To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 4,493,817.26 Kapkugerwet Feedback
Baregeiywet Dispensary Road (Twin 900mm Culvert 14M); Chepkembe B (7m, 900mm); Ainaptibik Culvert (7m, 900mm) Menjo River (7m 900mm) Arap Oriango (14m, 900mm) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport 2,098,500.00 Soliat Feedback
Routine Maintenance of Kaplelartet chiefs' office-Tabaita center road Potholes patched, ,surface grading completed. Public Works, Roads and Transport 2,996,699.92 Kaplelartet Feedback
Construction of Off B1-Kaitui bridge-kiptugumo pry sch Road; Kamasenga-Soliat Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 3,695,760.00 Soliat Feedback
Segetet-Siranga Road (7m, 900MM); Chebirir-Sachangwan Road (7m, 600MM); Kaula-Kapsoton Road (14m, 600MM) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 616,804.48 Kipkelion Feedback
Supply, Delivery, And Installation Of Kivuno-Korori Road;Mugumoini-Centre Road;Subukia-Centre Road;Centre One -Gwitu Farm Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 2,007,746.56 Tendeno/Sorget Feedback
Proposed Culverts Installation To Bosuben Junction-Tanguret Road,Kipteran-Kapsinendet Church Of Christ Road,Kap Petero-Kapsimbiri Dip Road,Kapsimbor-Kap Mosonik Shops,Arokyet Tinga-Kap Cape Town Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,900,928.54 Cheplanget Feedback
Supply,delivery and installation of culverts at Chebinyiny-Kenene rd,Mobet-tabut rd,mobet-keregut road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport On-Going 1,847,972.80 Cheplanget Feedback
Routine Maintenance of Silva junction-Siongi-Kampala road Potholes patched, ,surface grading completed. Public Works, Roads and Transport On-Going 3,640,590.40 Tebesonik Feedback
Routine Maintenance of Salgaa-Kongeren river-Kaplaiba road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,206,407.28 Soliat Feedback
Construction of Kelunet-Kapkimoro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 500,010.45 Tebesonik Feedback
Excavation of Kalmelilo coffee farm-reresik Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,051,453.00 Ainamoi Feedback
Construction of Koitabmat-Bondeni-Kiburet rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,144,000.00 Ainamoi Feedback
Construction Of Chepsetyion Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,451,995.00 Kapkugerwet Feedback
Construction Of Karap Kitur-Sumeiyon-Victor Academy-Orison Annex Road 4.8Km,Arap Kitur-Ainapbelek-Chelogoi Road 0.6Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,755,115.00 Kapkugerwet Feedback
Construction Bondeni- Kerego Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,144,017.00 Kapkugerwet Feedback
Construction Of Arap Chepkoshom- Laibon Bridge- St. Joseph Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,791,139.00 Kapkugerwet Feedback
Chepsetyon Assorted Roads To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,929,080.00 Kapkugerwet Feedback
Construction of Kisabei-Kenegut-Lemeiywet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,790,690.00 Kapsoit Feedback
Construction Of Karap Tegerei-Gabriel Road ,Tilitrap Malit-Kirongisyet Road,Kap Timothy-Chelule Road,Rugut-Chemoibei Road, Chemoibei Primary-Koitabai Road,Arap Kenei-Kiptetoon-Lemeiywet-Tunga Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,500,004.00 Kapsoit Feedback
Costruction Of Samutet-Engineer Bett Road 3.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,189,997.00 Kapsoit Feedback
Construction Of Off C35-Kisabei Pry - Kenegut- Lemeiywet Road 3.5Km, Off C35- Cherire Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,197,834.00 Kapsoit Feedback
Constrution Of Ogirgir Sign Post-Ogirgir Tbc-Kisabei Road 2.9km,Off E222-Ketitui Pry-Ketitui Sec Sch Road 0.6km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,694,477.00 Kapsoit Feedback
Construction of Kenegut centre 1.4km-Kamorongo Road 2km, Kapmosit-Tembwab kenegut Road 2km, Karap Marindany-Cheptagum ROad 3km, Kamosit-Karap keino Road 2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,798,813.00 Kapsoit Feedback
Construction of Kaboswa- Kiptenden- Cheptagum ROad To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,725,073.00 Kapsoit Feedback
Construction Of Off B1- FGCK Samutet- Market Road 0.7km, Off B1- JoRoadan Junction Road 1Km, Salgaa-Muguiywet-Oriango Road 1.6Km, Kiget Shop- Sunrise Academy- Sugutek Pry- River Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,004,881.00 Kapsoit Feedback
Construction of Kenegut Centre- Lemeiywet Road 1.5Km; Kenegut AIC-Cherire Road 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,066,000.00 Kapsoit Feedback
Construction of Telanet girls - Kaboswa TBC rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,879,200.00 Kapsoit Feedback
Construction of Ogirgir sign post-Ogirgir tbc-kisabei Road 2.9km,Off E222-Ketitui pry-Ketitui sec sch Road 0.6km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,174,000.00 Kapsoit Feedback
Construction of NCPB- Mjini Road; Cereal BoaRoad- Owour Church- Nyagacho- Mjini Road, Slip Footh path-Church- River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,837,715.00 Kipchebor Feedback
Construction Of Jua Kali Rd,Mjini Hilands Rd,Kenya Highlands Roads,Kipchebor Pry Access Roads,Kimungen-Kamasian Agc Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,152,100.00 Kipchebor Feedback
Construction of NCPB Cereals- Nyagacho Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,650,000.00 Kipchebor Feedback
Munai-Kipsot-Toror factory-Kimeswan Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,924,548.00 Kipchimchim Feedback
Construction Of Kabianga Tea Factory-Chepkutbei TBC 1.5Km, Tuiyobei Bridge-Kapchebet Agcroad 0.6Km,Kondamet AGC-Turkana Road 0.8Km,Arap Siele Mobego Primary 1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 982,608.00 Kabianga Feedback
Construction Of Kaptumbo-Kipkeurit Road 1.6Km, Kibingei Girls-Ngainet Road 1.2Km,Kabianga-Market Road 0.6Km,Kaplong-Kamaso Primary School Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,455,079.68 Kabianga Feedback
Nyabangi Centre-Chesebet Road 1.9k ;itembe-stashine AGC-Link Kiptere Road 0.9km,Karap Cheriro-Kap D.O Road 1.3km;Sinonin-Itondo Bridge Road 2.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,839,344.80 Kabianga Feedback
Kiptule TBC-Kolonget tbc-kaphentry Road 2km, off momul factory-itindo AGC Chemamul SDA ROAD 2.8KM To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,208,281.68 Kabianga Feedback
Construction of Mereonik- Kigorwet- Chief’s Office- Cheboin Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,972,551.04 Kapsuser Feedback
Construction of Seretut- Kamathayo- Chepngetuny- Pry- Arap Koech- Arap Mitei- Kap Oriango Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,692,341.47 Cheptororiet/Seretut Feedback
Construction of Kuresiet-Happy church-kibaraa rd 1.5km,michilingwet TBC-chepngerer-mandela Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,202,516.48 Cheptororiet/Seretut Feedback
Construction Of Teldet-Menet Road 2.3Km, Milimani-Machorwa Road 2.1Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 876,889.00 Waldai Feedback
Construction of Sosiot Centre Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,348,662.40 Waldai Feedback
Construction of Kipkoskei-Kapkolumbei Road, 0.5km, cheboin tbc-Kaprap joshua r 1.5km,arap koskei-Faith Church-Kapnyangai river-bot elijah corner tatu-Link Highway Road 2.7km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,193,841.00 Cheboin Feedback
Construction of Kenene Quarry- Kenene TBC Road 0.9km; Cheplanget Market Roads 0.3Km; Twoliot TBC- Kapsogeruk Bridge Road 1Km, Kaldit TBC- Matureti Road 1Km; Cheplanget Market- Kapsiongei Road 1.4Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 937,092.08 Cheplanget Feedback
Construction of Arap Kesoro-Tamboiyot Box Culvert Road 0.6Km,; Kap Petero-Kap Simbirir Dip Road 0.6Km, Kapsimbirir-Kap Mosonik Shop Road 1.1Km, Arokyet Tinga- Kap Cape Town Road 1.1Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,448,076.80 Cheplanget Feedback
Construction of Mombwo Pry- Sugutek TBC Road 0.8Km; Arap Kesembe- Caterpillar Road 2km; Bosuben Junction- Tanguret Road 1.3Km; Kipteran-Kapsinendet Church of Chridst Road 1.3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,670,678.40 Cheplanget Feedback
Construction of Off Chesingoro TBC-Kapsumet TBC-Chililis-Morit bridge Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,287,129.12 Chemosot Feedback
Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,975,268.96 Kisiara Feedback
Construction of Chemeteget- Molyolok-Kimulwo Deliverance- Off C23 Roads; OFC Church- Shallai- Chelilis Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,897,196.32 Chemosot Feedback
Construction Of Kaprongori-Kaprote Roads2.3Km,Tulwet-Ngainet Road 1.7Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,730,644.64 Kisiara Feedback
Construction of Keregut-Taach Centre Road 1km,Tinga-Tulwap Kipsigis Road 0.3km,Misoi-Chebirribei-Aroron Road 0,85km,Mongoita-Chemamanik Road 0.4km,Sunset Junction-Chepkoiyo Road 1km, Kelelwa-Chepkoiyo Road 0.7km,Kasebet-Chepkembe Road 1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,496,709.00 Kisiara Feedback
Shiners-Temuge r 0.4km, Kaptirbet-koros-ngesumin Road 2.5km, Kapkatet mortuary-Cementry Road 0.4km, Kapkatet Factory-Nganaset Road 0.6km, cherandas-sewerer Road 0.3km, kapkatet-AIC Holy Harvest church Road 0.5km,Kap mp-cherus tbc Road 0.6km, Off main Road-arap chepkwony Road 0.6km,off main Road-dcs residence Road 0.2, off main road kiko Road 0.2km matunda Road 0.2km, 954east-kipkosil pry sch Road 0.5km,mabwaita Aic -Catholic church Road 1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,495,316.64 Kapkatet Feedback
Koiwa-Pefa church Road, chebagal tbc,ainapset river agc Road, Tendwet-Kaphilimon Road;Pefa Church-Cheptigit -Arap Maina Road, Kapkaren-Soet Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 5,845,379.00 Litein Feedback
Construction Of Kamiwa- Kamotos 4.1Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,285,617.68 Chilchila Feedback
Construction Of Kapwanja- Chebisom Road 2.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,026,752.00 Chilchila Feedback
Construction Of Baseline Songonyet Kimandui Road , Rarinwet Sereng Road, Chegen Road Laboso Pry Siwot Factory Siwit Dispensary Road , Maarifa Pry Siwot Catle Dip Road, Museum Koiserem Pry Road, Leketetiot Road, Kapkures Road Laboso Academ Siwat Factory Siwot Dispesary Siwot Seconday Siwot Farm Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,853,706.72 Chilchila Feedback
Construction Of Kokwet Secondary School-Kapnguron-Kipsumei Road 2Km,Burutu Dip-Mugut Factory Road 1.6Km,Yala-Magire Secondary School-Teldet Road 2.8Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,479,771.52 Chilchila Feedback
Construction of Tendwet-Malinja-Magire dispesary Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,946,746.88 Chilchila Feedback
Gravelling of Tendwet-Malinja-Magire dispesary rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,190,255.20 Chilchila Feedback
Factory-Chepkosa Road,Chepkosa-Legetiot Road,Legetiot-Chembek Road,Chumbek-Kiptenden Road,Sereng-Chepkendi Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,005,386.00 Chilchila Feedback
Construction Of Seguton Santos Round-AIC Church Road 2.6Km,Pinus Tamarsang 1.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,154,624.64 Kipkelion Feedback
Construction of Off C35-Chebululu Road,Mocheisok-Mumetet Road,Chemamul-kobiro Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,419,604.56 Kipkelion Feedback
Construction of Liloch Pry sch-Koisaet pry sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,673,199.12 Kamasian Feedback
Construction Of Bartera-Murero Road,Irengeti-Changee Road,Kawangware-Mtaragon Road,Kaptepengwa-Tinga Farm Road,Kaptepengwo-Bartera-Murera Road,Singoi Road,Kaptego-Borowet Road,Kuakali Road,Kaplaba Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,475,605.00 Kamasian Feedback
Construction Of Centre Juu-Kiringeti-Makanisa Road 4Km, Bartera-Centre Juu Road 1.5Km, Kapkures-Sirgoi Road 3Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,434,386.40 Kamasian Feedback
Construction of Centre Juu - Kerengeti - Makanisa Road 4.0km , Bartera- Centre Juu Road 1.5km and Kapkures - Sirgoi Road 3.0km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,873,901.00 Kamasian Feedback
Chemosogon - Kipsegi - Kimologit rd To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,187,800.64 Kamasian Feedback
Construction Of Njoro-Kapkoros Road 1.5km, Kapserem-Timbek Road 1.5Km, Tumoek-Kapkurin Road 2Km, Tumoek-Kabarak Road 3Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,998,381.92 Kunyak Feedback
Construction of Kap DO - Njoro Kolonge Road 1.9km; Kapkwen - Kiptenden Road 8.5km; DO's - Kimoro Road 1km; Sireret - Mlango Road 8.6km; Kapis - Kamaragaa Road 1km - Kunyak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,021,708.32 Kunyak Feedback
Construction of Cattle Dip- Ngepepo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,110,802.16 Kunyak Feedback
Construction of Kapkilumben-Chagaranda road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,202,523.28 Kunyak Feedback
Construction of Kapkurin- Kabirong- Chesonoi-Kapkwen Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,501,005.28 Kunyak Feedback
Constuction Of Kigora-Mosonik Road 3.5Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,650,801.92 Chepseon Feedback
Chepsir-Kipkeremwo Road 5.7km, Monori- Sailo Road 2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,350,000.00 Chepseon Feedback
Construction Of Kipkeremwo- Ngasura Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,040,978.32 Chepseon Feedback
Construction of Momoniat Centre- Cheboror Pry- Kap Cherotich- Karap Malel- Sigowet Road 5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,555,520.45 Chepseon Feedback
Construction of AGC-Kobeiyot Road 0.5Km; Momoniat Pry Schl- Cllr Road 0.2Km, Kap Hezron Road 0.6Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,876,196.80 Chepseon Feedback
Construction of Kapmachungwa-Mutanya road;Off Kamachungwa-Leberer cattle dip road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,098,633.00 Chepseon Feedback
Construction of Chebitet- Kiletien Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,845,441.00 Chepseon Feedback
Construction of Kipkeremwo - Ngasura Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,562,309.50 Chepseon Feedback
Construction Of Deliverance-Ngatumek Road 3.4Km, Mathias- Kipyemit Road 1.2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,816,435.73 Kedowa/Kimugul Feedback
Construction of Kimugul-Kimoson Primary School Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,253,729.28 Kedowa/Kimugul Feedback
Construction of Free pentacost church-Kiprengwe-Kapchelule road; Cattle dip-Miti Moja road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,798,778.40 Kedowa/Kimugul Feedback
Construction of Off B1-Barkechechek River Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,524,012.64 Kedowa/Kimugul Feedback
Construction Of Kwa Chumo Rd,Kipsigori-Agc Church Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,069,131.16 Kedowa/Kimugul Feedback
Construction Of Kapkondoo-Kapisoi Road 3.8Km, To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,299,034.62 Londiani Feedback
Construction Of Kapkwen Pry School- Arap Kurgat Road 1.2Km, AIC Cheres- Kap Asariah Road 0.4km, Cheres Centre- Forest Road, Arap Choge- Ninja Road, SDA Cheres-Kap Zachariah Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,677,463.36 Londiani Feedback
Construction of Kipsirichet-Boma-Jagoror Quarry Road 1.5km,Kapketin-Kigen-Academy Road 1.2km, Baba Noa -DC Road 1.1km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,849,905.21 Londiani Feedback
Construction of Kapsenda quarry - Kipsotet Road 1.3km; Kapkondoo SB - Chebirir Road 2.0km and Kimout - Chepkoiyo Road 1.4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,075,343.20 Londiani Feedback
Grading, gravelling and compaction of Lower Cheres Road, Kapkwen pry school - Arap Kurgat rd,AIC Cheres - Kap Asariah Road, Cheres Centre - Forestry Road; Arap Choge - Ninja Road; SDA Cheres -Kapzachariah Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,762,126.85 Londiani Feedback
Construction of Barno-Kimout pry sch-Kimout centre rd 3km,Sudan Kapraplimo rd 0.3km, Kiplangat-Chepkoiyo-Kapkiondo rd 1.3km, Kapsenda Dispesary-Kerich -Kutu rd 1.7km,Marindany-Lalangbek pry sch rd 1.6km Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,615,691.00 Londiani Feedback
Construction Of Independet- Kamwogo Road 4.5Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,889,408.00 Tendeno/Sorget Feedback
Grading Of Kaigai Road, Upc Road: 1km, Majani Sawmill- Awii Road: 1.2km,Amos- Saiz Road: 2.7km Independent Church- Dam Road: 1.2km, Ajaja Road:1.1km, Catholic- Main- Cherer Diversion Road: Madam Milka- Koigo Road: Cheres Road: Chebangang Road: Josh- Dam Road: 1.3km, Chane Road: 2km,Upendo Road:1.5km, Wakimani Road:1.1km Zakayo Road:1.2km, Mama Mike Road:1.2km, Mrs Langat- Forest Road: 1.3km, Botpla Road: 1.2km, Mama Wangari- Dam - Daniel Road: 2km, Speaker Kiprono Road:1.8km,Kwa Daniel Road:1.2km,Daniel - Forest Road:2km,Centaa Road: 3km,Kipkelion Works:2.1km, Barsiele Road:1.8km, Mau Road- Rowerr Road:00.8km,Towett-Guito Road:1.2km, Ngingo- Highway Road:1.8km,Peters- Gwitu Road:1.8km Bungoma Road- Isilii Road: Assembly Church Bridge- Cheres Road: Bridge Road: Assembly Church Bridge- Cheres -Bridge Road: Mama Chelimo- Al Shabaab Road: 0.8km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,373,212.26 Tendeno/Sorget Feedback
Construction Of Sorget Chief's Office-Sorget Pry Sch Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,699,633.01 Tendeno/Sorget Feedback
Construction Of Kakibe Primary-Chepkalo Coffee Factory-Catholic Church-Simotwet Primary-Tirita Bricks YaRoad Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,549,505.34 Sigowet Feedback
Construction Of Tabrasoi-Kiplogoi Pry-Saachangwan Road 3.6km,Sugutek-Tuiyobei Pry Sch Road 4km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,810,000.00 Soliat Feedback
Construction of Siriat- Kamungesha Road; Moinget- Kapsinendet Road; Quarry- Cheramus Road; Chemutian- Baregeiywet SDA- Quarry Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,598,309.60 Soliat Feedback
Construction of Kabingok-Kongereen pry-Mirmiro Road 1.7km,Kapshiongiroi-Kaap Chepsengeny r 2.2.km;Seskaa-Ainap Itiik-Kapmathayo Road 1.4km Kapraptuei-Kamageso Road 1.5km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,613,813.89 Soliat Feedback
Construction of Soliat boys sec-chepkoson river rd, karobetKamasenga Quarry rd; Korabei-Chesunet-Kapsigowo rd;Cheramor-siriat rd;sesagaa-kapchelemei-Kongereen To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,008,437.76 Soliat Feedback
Construction of Kabokyek- Chesiche Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,270,053.84 Soliat Feedback
Construction of Kapkormom Junction- Chesino Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,769,728.48 Soin Feedback
Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,130,604.50 Soin Feedback
Construction Of Ngeremwo-Chobotot-Laitigo Road 6km,Kwa Michael-Laitigo Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,590,290.40 Kapkugerwet Feedback
Proposed Construction of Off B2- Saoset TBC- Chemugusu Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,826,637.19 Kapkugerwet Feedback
Proposed Construction of Mjini Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,007,910.00 Kipchebor Feedback
Construction of Koisagat- Chilchila Boundary Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,439,286.70 Chilchila Feedback
Proposed Construction of Chesingoro- Lalagin Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,402,532.80 Chemosot Feedback
Proposed Twin 900mm Cross Culverts to Cherara Bridge, Chebululu- Ng'erng'erwet Road and Kimugul- Ngainet TBC Road At Ngepchebyaat River To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,834,996.18 Kisiara Feedback
Routine Maintenance Of Kap Josea-Kap Sakawa Road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,350,955.84 Kipchimchim Feedback
Routine Maintenance of Cheptororiet-Arap Tonui road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 2,937,783.52 Kapsuser Feedback
Routine Maintenance of Kosachmwai-Chemoset road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 2,090,061.26 Cheptororiet/Seretut Feedback
Routine Maintenance of Chebitet-Kap Tebengwet road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,187,540.80 Kapkatet Feedback
Routine Maintenance of Reresik-Kiprichait-Roret boys-Chebululu-Tulwet-Ngainet bridge Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,629,140.08 Kisiara Feedback
Routine Maintenance of Kapkarin-Chesoen TBC road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,469,031.04 Litein Feedback
Routine Maintenance of Ainapset A.I.C-kap Bomwo-Rungut primary-Chemsembe-Tenwet T.B.C road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,548,176.83 Litein Feedback
Routine Maintenance of Kibolgong-Tiriitab Eito road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,397,908.00 Tebesonik Feedback
Routine Maintenance of Kibaranji-Karapngerer road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 4,162,824.00 Tebesonik Feedback
Routine Maintenance of Mutwot-Emdit road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 3,996,587.60 Kaplelartet Feedback
Construction Of Kapkawa Bridge-Chemutian Dip Road 2Km, Chemutian-Kapjonathan Road 1.2Km, Kapkawa Bridge-Kapkongoni Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,615,691.00 Soliat Feedback
Construction of Kaplengeny- Kiptugumo Road:2.6km, Tabrasin-Kiptugumo dispensary Road:2.2km, Kamaneesoi-Highway-Moretiik-Arap Tuei Road: 2.2km, Soliat Boys-Kongeren river-Kapchelemei Road:0.5km, Kongereen pry-Mirmiro Road:1.3km, Siriat-Kaosisrwo Road:1.2km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,707,324.00 Soliat Feedback
Construction of Soliat Boys- Soliat AGC-Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,389,868.00 Soliat Feedback
Soliat primary-kamugesh-primary school Road 2.7km Kapnogiro-karapkeino Road 0.8km, salgaa-kaaplachelemei-kongereen dip Road 2.3 km ,kongeren river -kabingoi Road 0.8km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 2,496,880.51 Soliat Feedback
Gravelling For Kapsimba-Chesiche Church Road; Chesiche-Chesiche Ecd Road; Chesiche Ecd-Kaptala Road; Chesiche-Kabokyek Ecd-Kaptala Road;Chesiche-Kabokyek Cattle Dip Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,214,963.00 Soliat Feedback
Construction of Chepsengeny-Kwandap Mosong road;Kwandap Mosong-Kaplelach Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,153,380.00 Soin Feedback
Proposed Construction of Twin 900mm Cross Culverts To Kapjonah - Bagao Road (5Km); Ainamoi bridge – Maseriat AGC Road (2km) To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,494,177.52 Ainamoi Feedback
Propsoed Construction of Kokwet Box Culvert To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,252,491.52 Chilchila Feedback
Routine Maintenance of Elite primary school-Chebangang road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,429,178.00 Londiani Feedback
Routine Maintenance of Barotion sawmill-Lelsotet road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 975,030.00 Londiani Feedback
Routine Maintenance of Slaughter house-Towet bridge-Marindany forest road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,120,200.00 Tendeno/Sorget Feedback
Routine Maintenance of Murau centre-Bakery road Potholes patched, ,surface grading completed. Public Works, Roads and Transport Completed 1,034,595.00 Kamasian Feedback
Construction of Off 222- Munai Road 2.4Km, Off 222- Dairy- Kipsotet-Chumo Road 1.7Km, Chepnyonyo-Toror Factory-Boita PAG Church- E222 Road 2.9Km, Off E222- Sepet Pry School Road 0.5km, E222-Kimeswon Road 1.9km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 668,285.00 Kipchimchim Feedback
Construction of Kipchimchim- Kipsotet-Kimeswon Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 1,507,786.00 Kipchimchim Feedback
Construction Of Kapsaino-Chebitet Road, Kapshifta-Chebitet Road, Kapchamgei-Koibarak Road, Chilichila-Koibarak Road To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 3,277,574.20 Chepseon Feedback
Construction of Centre Juu Quarry- AGC- Kap Stephano- Kaptebe- Ngeno- Borchole Road 4.5Km, Bartera Pry Sch-Centre Juu Road 2Km To improve road infrastructure and ensure effective drainage Public Works, Roads and Transport Completed 4,961,208.00 Kamasian Feedback